ML072480246
| ML072480246 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 08/31/2007 |
| From: | NRC/RGN-I/DRP/PB5 |
| To: | |
| References | |
| Download: ML072480246 (2) | |
Text
Summer Inspection / Activity Plan 09/01/2007 - 03/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/31/2007 09:06:20 Report 22 1
EB3-HS
- HEAT SINK Baseline Inspections 09/10/2007 09/14/2007 1
7111107B IP Heat Sink Performance 3
PSB1-EP
- EP EXERCISE Baseline Inspections 10/01/2007 10/05/2007 1
7111401 IP Exercise Evaluation Baseline Inspections 10/01/2007 10/05/2007 1
7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 10/01/2007 10/05/2007 1
71151-EP01 IP Drill/Exercise Performance Baseline Inspections 10/01/2007 10/05/2007 1
71151-EP02 IP ERO Drill Participation Baseline Inspections 10/01/2007 10/05/2007 1
71151-EP03 IP Alert & Notification System 5
EB1-MODS
- MODIFICATIONS-10CFR50.59 Baseline Inspections 12/10/2007 12/14/2007 1
7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 12/10/2007 12/14/2007 1
7111117B IP Permanent Plant Modifications 1
- PREP TRIP-PROBLEM ID AND RESOL Baseline Inspections 01/28/2008 02/01/2008 1
71152B IP Identification and Resolution of Problems 4
- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 03/10/2008 03/14/2008 1
71152B IP Identification and Resolution of Problems Baseline Inspections 03/24/2008 03/28/2008 1
71152B IP Identification and Resolution of Problems 1
PSB1-RP
- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections 03/31/2008 04/02/2008 1
7112101 IP Access Control to Radiologically Significant Areas 3
PSB1-RP
- RADIATION PROTECTION OCCUPATIONAL WK1 Baseline Inspections 04/21/2008 04/25/2008 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 04/21/2008 04/25/2008 1
7112102 IP ALARA Planning and Controls Baseline Inspections 04/21/2008 04/25/2008 1
7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 04/21/2008 04/25/2008 1
71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 04/21/2008 04/25/2008 1
71151-PR01 IP RETS/ODCM Radiological Effluent 1
EB3-ISI
- SUMMER - ISI Baseline Inspections 04/28/2008 05/02/2008 1
7111108P IP Inservice Inspection Activities - PWR 3
PSB1-RP
- RADIATION PROTECTION OCCUPATIONAL WK2 Baseline Inspections 05/05/2008 05/09/2008 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 05/05/2008 05/09/2008 1
7112102 IP ALARA Planning and Controls Baseline Inspections 05/05/2008 05/09/2008 1
7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 05/05/2008 05/09/2008 1
71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 05/05/2008 05/09/2008 1
71151-PR01 IP RETS/ODCM Radiological Effluent 7
EB1-CDBI
- COMPONENT DESIGN BASIS INSPECTION Baseline Inspections 07/28/2008 08/01/2008 1
7111121 IP Component Design Bases Inspection Baseline Inspections 08/11/2008 08/15/2008 1
7111121 IP Component Design Bases Inspection This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Summer Inspection / Activity Plan 09/01/2007 - 03/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/31/2007 09:06:20 Report 22 7
EB1-CDBI
- COMPONENT DESIGN BASIS INSPECTION Baseline Inspections 08/25/2008 08/29/2008 1
7111121 IP Component Design Bases Inspection Baseline Inspections 09/08/2008 09/12/2008 1
7111121 IP Component Design Bases Inspection 2
- REQUAL INSPECTION Baseline Inspections 08/11/2008 08/15/2008 1
7111111B IP Licensed Operator Requalification Program 1
PSB1-EP
- EP INSP Baseline Inspections 09/22/2008 09/26/2008 1
7111402 IP Alert and Notification System Testing Baseline Inspections 09/22/2008 09/26/2008 1
7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 09/22/2008 09/26/2008 1
7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 09/22/2008 09/26/2008 1
7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 09/22/2008 09/26/2008 1
71151-EP01 IP Drill/Exercise Performance Baseline Inspections 09/22/2008 09/26/2008 1
71151-EP02 IP ERO Drill Participation Baseline Inspections 09/22/2008 09/26/2008 1
71151-EP03 IP Alert & Notification System 3
OL EXAM
- INITIAL EXAM PREP Not Applicable 01/05/2009 01/09/2009 1
V23297 SUMMER/JANUARY 2009 EXAM AT POWER FACILITIES 3
OL EXAM
- INITIAL EXAM Not Applicable 01/26/2009 02/06/2009 1
V23297 SUMMER/JANUARY 2009 EXAM AT POWER FACILITIES 3
PSB2-EP
- EP EXERCISE Baseline Inspections 03/30/2009 04/03/2009 1
7111401 IP Exercise Evaluation Baseline Inspections 03/30/2009 04/03/2009 1
7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 03/30/2009 04/03/2009 1
71151-EP01 IP Drill/Exercise Performance Baseline Inspections 03/30/2009 04/03/2009 1
71151-EP02 IP ERO Drill Participation Baseline Inspections 03/30/2009 04/03/2009 1
71151-EP03 IP Alert & Notification System This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure