Summer Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/03/2005 09:48:01 Report 22 2
MTN-ISI
- INSERVICE INSPECTION Baseline Inspections 04/25/2005 04/29/2005 Inservice Inspection Activities - PWR IP 7111108P 1
1 MTNTI160
- 2515/160 U-1: PZR PENTRATION NOZZLES Safety Issues 04/25/2005 04/29/2005 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01]
2 PS1-RP
- RP OCCUPATIONAL - WEEK 1 Baseline Inspections 04/25/2005 04/29/2005 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 04/25/2005 04/29/2005 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 04/25/2005 04/29/2005 Radioactive Material Processing and Transportation IP 7112202 1
Baseline Inspections 04/25/2005 04/29/2005 Performance Indicator Verification IP 71151 1
2 PS1-RP
- RP OCCPATIONAL BASELINE - WEEK 2 Baseline Inspections 05/02/2005 05/06/2005 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 05/02/2005 05/06/2005 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 05/02/2005 05/06/2005 Radioactive Material Processing and Transportation IP 7112202 1
Baseline Inspections 05/02/2005 05/06/2005 Performance Indicator Verification IP 71151 1
1 MTNSGISI
- STEAM GENERATOR ISI Baseline Inspections 05/09/2005 05/13/2005 Inservice Inspection Activities - PWR IP 7111108P 1
1 MTN-HS
- HEAT SINK Baseline Inspections 06/06/2005 06/10/2005 Heat Sink Performance IP 7111107B 1
1 RP-PS1
- RP OCCUPATIONAL BASELINE (TENTATIVE)
Baseline Inspections 06/06/2005 06/10/2005 Radioactive Material Processing and Transportation IP 7112202 1
3 PS EP
- EMERGENCY EXERCISE Baseline Inspections 07/18/2005 07/22/2005 Exercise Evaluation IP 7111401 1
Baseline Inspections 07/18/2005 07/22/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 1
Baseline Inspections 07/18/2005 07/22/2005 Performance Indicator Verification IP 71151 1
- REQUAL INSPECTION Baseline Inspections 08/08/2005 08/12/2005 Licensed Operator Requalification Program IP 7111111B 1
4 EB1-MODS
- MODIFICATIONS/10CFR50.59 Baseline Inspections 10/03/2005 10/07/2005 Evaluation of Changes, Tests, or Experiments IP 7111102 1
3 OL PREP
- INITIAL EXAM PREP Not Applicable 11/28/2005 12/03/2005 SUMMER/EXAMS AT POWER FACILITIES V23212 1
3 OL EXAM
- INITIAL EXAM Not Applicable 12/12/2005 12/16/2005 SUMMER/EXAMS AT POWER FACILITIES V23212 1
2 MTN-MR
- MR EFFECTIVENESS Baseline Inspections 01/09/2006 01/13/2006 Maintenance Effectiveness IP 7111112B 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Summer Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/03/2005 09:48:01 Report 22 4
PS1-RP
- RP BASELINE PUBLIC Baseline Inspections 01/09/2006 01/13/2006 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 01/09/2006 01/13/2006 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1
Baseline Inspections 01/09/2006 01/13/2006 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1
Baseline Inspections 01/09/2006 01/13/2006 Radiological Environmental Monitoring Program IP 7112203 1
Baseline Inspections 01/09/2006 01/13/2006 Performance Indicator Verification IP 71151 1
5 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 05/01/2006 05/05/2006 Identification and Resolution of Problems IP 71152B 1
Baseline Inspections 05/15/2006 05/19/2006 Identification and Resolution of Problems IP 71152B 1
1 EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 05/01/2006 05/03/2006 Safety System Design and Performance Capability IP 7111121 1
5 EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 06/05/2006 06/10/2006 Safety System Design and Performance Capability IP 7111121 1
Baseline Inspections 06/19/2006 06/23/2006 Safety System Design and Performance Capability IP 7111121 1
1 PS2-EP
- EP INSP Baseline Inspections 07/31/2006 08/04/2006 Alert and Notification System Testing IP 7111402 1
Baseline Inspections 07/31/2006 08/04/2006 Emergency Response Organization Augmentation Testing IP 7111403 1
Baseline Inspections 07/31/2006 08/04/2006 Emergency Action Level and Emergency Plan Changes IP 7111404 1
Baseline Inspections 07/31/2006 08/04/2006 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1
Baseline Inspections 07/31/2006 08/04/2006 Performance Indicator Verification IP 71151 1
This report does not include INPO and OUTAGE activities.