ML060610412

From kanterella
Jump to navigation Jump to search
Inspection / Activity Plan, 03/01/2006 - 09/30/2007
ML060610412
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/02/2006
From:
NRC/RGN-II/DRP/RPB5
To:
Shared Package
ML060610408 List:
References
IR-06-001
Download: ML060610412 (2)


Text

Page 1 of 2 Summer 03/02/2006 11:48:05 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1 IP 71152B Identification and Resolution of Problems 03/13/2006 03/17/2006 Baseline Inspections 1 IP 71152B Identification and Resolution of Problems 03/27/2006 03/31/2006 Baseline Inspections EB1-CDB - COMPONENT DESIGN BASES INSPECTION 5 1 IP 7111121 Component Design Bases Inspection 05/08/2006 05/12/2006 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 05/22/2006 05/26/2006 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 06/05/2006 06/09/2006 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 06/19/2006 06/23/2006 Baseline Inspections PS2-EP - EP INSP 1 1 IP 7111402 Alert and Notification System Testing 07/31/2006 08/04/2006 Baseline Inspections 1 IP 7111403 Emergency Response Organization Augmentation Testing 07/31/2006 08/04/2006 Baseline Inspections 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 07/31/2006 08/04/2006 Baseline Inspections 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 07/31/2006 08/04/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 07/31/2006 08/04/2006 Baseline Inspections OL RQ - REQUAL INSPECTION 2 1 IP 7111111B Licensed Operator Requalification Program 08/21/2006 08/25/2006 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE INSP 2 1 IP 7112101 Access Control to Radiologically Significant Areas 10/09/2006 10/13/2006 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 10/09/2006 10/13/2006 Baseline Inspections EB3-ISI - INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/16/2006 10/20/2006 Baseline Inspections EB3TI150 - 2515/150 RPV & VHP NOZZLE 1 1 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 10/16/2006 10/19/2006 Safety Issues EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI 1 1 IP 71111 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 11/05/2006 11/10/2006 Baseline Inspections TFP - TFP INFO TRIP 4 1 IP 7111105T Fire Protection [Triennial] 02/27/2007 03/01/2007 Baseline Inspections TFP - TRIENNIAL FIRE PROTECTION 4 1 IP 7111105T Fire Protection [Triennial] 03/19/2007 03/23/2007 Baseline Inspections 1 IP 7111105T Fire Protection [Triennial] 04/02/2007 04/06/2007 Baseline Inspections OL PREP - INITIAL EXAM PREP 3 1 V23249 SUMMER/DECEMBER 2005 EXAM AT POWER FACILITIES 05/14/2007 05/18/2007 Not Applicable OL EXAM - INITIAL EXAM 3 1 V23249 SUMMER/DECEMBER 2005 EXAM AT POWER FACILITIES 06/04/2007 06/08/2007 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 Summer 03/02/2006 11:48:05 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1-RP - RP OCCUPATIONAL PRE-INSP VISIT 1 1 IP 7112101 Access Control to Radiologically Significant Areas 06/25/2007 06/29/2007 Baseline Inspections EB3-HS - HEAT SINK 1 1 IP 7111107B Heat Sink Performance 07/23/2007 07/27/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE INSP 3 1 IP 7112101 Access Control to Radiologically Significant Areas 07/23/2007 07/27/2007 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 07/23/2007 07/27/2007 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation 07/23/2007 07/27/2007 Baseline Inspections 1 IP 71151 Performance Indicator Verification 07/23/2007 07/27/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.