Inspection / Activity Plan, 03/01/2006 - 09/30/2007
ML060610412
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/02/2006
From:
NRC/RGN-II/DRP/RPB5
To:
Shared Package
ML060610408 List:
References
IR-06-001
Download: ML060610412 (2)


Text

Summer Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2006 11:48:05 Report 22 4

PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 03/13/2006 03/17/2006 1

71152B IP Identification and Resolution of Problems Baseline Inspections 03/27/2006 03/31/2006 1

71152B IP Identification and Resolution of Problems 5

EB1-CDB

- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 05/08/2006 05/12/2006 1

7111121 IP Component Design Bases Inspection Baseline Inspections 05/22/2006 05/26/2006 1

7111121 IP Component Design Bases Inspection Baseline Inspections 06/05/2006 06/09/2006 1

7111121 IP Component Design Bases Inspection Baseline Inspections 06/19/2006 06/23/2006 1

7111121 IP Component Design Bases Inspection 1

PS2-EP

- EP INSP Baseline Inspections 07/31/2006 08/04/2006 1

7111402 IP Alert and Notification System Testing Baseline Inspections 07/31/2006 08/04/2006 1

7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 07/31/2006 08/04/2006 1

7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 07/31/2006 08/04/2006 1

7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 07/31/2006 08/04/2006 1

71151 IP Performance Indicator Verification 2

OL RQ

- REQUAL INSPECTION Baseline Inspections 08/21/2006 08/25/2006 1

7111111B IP Licensed Operator Requalification Program 2

PSB1-RP

- RP OCCUPATIONAL BASELINE INSP Baseline Inspections 10/09/2006 10/13/2006 1

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/09/2006 10/13/2006 1

7112102 IP ALARA Planning and Controls 1

EB3-ISI

- INSERVICE INSPECTION Baseline Inspections 10/16/2006 10/20/2006 1

7111108P IP Inservice Inspection Activities - PWR 1

EB3TI150

- 2515/150 RPV & VHP NOZZLE Safety Issues 10/16/2006 10/19/2006 1

2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 1 EB1-SUMP

- PWR CONTAINMENT SUMP BLOCKAGE TI Baseline Inspections 11/05/2006 11/10/2006 1

71111 IP Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 4

TFP

- TFP INFO TRIP Baseline Inspections 02/27/2007 03/01/2007 1

7111105T IP Fire Protection [Triennial]

4 TFP

- TRIENNIAL FIRE PROTECTION Baseline Inspections 03/19/2007 03/23/2007 1

7111105T IP Fire Protection [Triennial]

Baseline Inspections 04/02/2007 04/06/2007 1

7111105T IP Fire Protection [Triennial]

3 OL PREP

- INITIAL EXAM PREP Not Applicable 05/14/2007 05/18/2007 1

V23249 SUMMER/DECEMBER 2005 EXAM AT POWER FACILITIES 3

OL EXAM

- INITIAL EXAM Not Applicable 06/04/2007 06/08/2007 1

V23249 SUMMER/DECEMBER 2005 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Summer Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2006 11:48:05 Report 22 1

PSB1-RP

- RP OCCUPATIONAL PRE-INSP VISIT Baseline Inspections 06/25/2007 06/29/2007 1

7112101 IP Access Control to Radiologically Significant Areas 1

EB3-HS

- HEAT SINK Baseline Inspections 07/23/2007 07/27/2007 1

7111107B IP Heat Sink Performance 3

PSB1-RP

- RP OCCUPATIONAL BASELINE INSP Baseline Inspections 07/23/2007 07/27/2007 1

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 07/23/2007 07/27/2007 1

7112102 IP ALARA Planning and Controls Baseline Inspections 07/23/2007 07/27/2007 1

7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 07/23/2007 07/27/2007 1

71151 IP Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.