ML100620886

From kanterella
Jump to navigation Jump to search
Report 22 - 2010001, Inspection/Activity Plan
ML100620886
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/03/2010
From:
Division Reactor Projects II
To:
South Carolina Electric & Gas Co
Shared Package
ML100620871 List:
References
IR-10-001
Download: ML100620886 (2)


Text

Inspection / Activity Plan Page 1 of 2 03/03/2010 07:11:39 Report 22 03/01/2010 - 06/30/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Summer PSB1EP

- EMERGENCY PREPAREDNESS 2009 EXERCISE 3

1 IP Exercise Evaluation 7111401 04/19/2010 04/23/2010 TFPI 805

- TRIENNIAL FIRE PROTECTION 7

1 IP Fire Protection [Triennial]

7111105T 06/14/2010 06/18/2010 1

IP Fire Protection [Triennial]

7111105T 06/28/2010 07/02/2010 EB3 HS

- HEAT SINK INSPECTION 1

1 IP Heat Sink Performance 7111107T 07/26/2010 07/30/2010 EB1

- MODIFICATIONS - 10CFR50.59 3

1 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 08/09/2010 08/13/2010 1

IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 08/23/2010 08/27/2010 OL RQ

- REQUAL INSPECTION 2

1 IP Licensed Operator Requalification Program 7111111B 08/16/2010 08/20/2010 PSB1-RP

- RP PUBLIC RADIATION PROTECTION 4

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 08/16/2010 08/20/2010 1

IP Occupational Dose Assessment 71124.04 08/16/2010 08/20/2010 1

IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 08/16/2010 08/20/2010 1

IP Public Radiation Safety 71124.07 08/16/2010 08/20/2010 1

IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 08/16/2010 08/20/2010 1

IP Performance Indicator Verification 71151 08/16/2010 08/20/2010 PSB1EP

- EMERGENCY PREPAREDNESS INSPECTION 1

1 IP Alert and Notification System Evaluation 7111402 09/13/2010 09/17/2010 1

IP Emergency Response Organization Augmentation Testing 7111403 09/13/2010 09/17/2010 1

IP Emergency Action Level and Emergency Plan Changes 7111404 09/13/2010 09/17/2010 1

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 09/13/2010 09/17/2010 1

IP Performance Indicator Verification 71151 09/13/2010 09/17/2010 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION 2

1 IP Identification and Resolution of Problems 71152B 10/04/2010 10/08/2010 1

IP Identification and Resolution of Problems 71152B 10/18/2010 10/22/2010 CDBI

- COMPONENT DESIGN BASIS INSPECTION 6

1 IP Component Design Bases Inspection 7111121 01/10/2011 01/14/2011 1

IP Component Design Bases Inspection 7111121 01/31/2011 02/04/2011 1

IP Component Design Bases Inspection 7111121 02/14/2011 02/18/2011 1

IP Component Design Bases Inspection 7111121 02/28/2011 03/04/2011 PSB1-RP

- RP OCCUPATIONAL WEEK 1 3

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/25/2011 04/29/2011 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Inspection / Activity Plan Page 2 of 2 03/03/2010 07:11:39 Report 22 03/01/2010 - 06/30/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Summer PSB1-RP

- RP OCCUPATIONAL WEEK 1 3

1 IP Occupational ALARA Planning and Controls 71124.02 04/25/2011 04/29/2011 1

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/25/2011 04/29/2011 1

IP Occupational Dose Assessment 71124.04 04/25/2011 04/29/2011 1

IP Radiation Monitoring Instrumentation 71124.05 04/25/2011 04/29/2011 EB3ISI

- INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - PWR 7111108P 05/02/2011 05/06/2011 PSB1-RP

- RP OCCUPATIONAL WEEK 2 2

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/09/2011 05/13/2011 1

IP Occupational ALARA Planning and Controls 71124.02 05/09/2011 05/13/2011 1

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/09/2011 05/13/2011 1

IP Occupational Dose Assessment 71124.04 05/09/2011 05/13/2011 1

IP Radiation Monitoring Instrumentation 71124.05 05/09/2011 05/13/2011 1

IP Performance Indicator Verification 71151 05/09/2011 05/13/2011 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure