ML100620886

From kanterella
Jump to navigation Jump to search
Report 22 - 2010001, Inspection/Activity Plan
ML100620886
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/03/2010
From:
Division Reactor Projects II
To:
South Carolina Electric & Gas Co
Shared Package
ML100620871 List:
References
IR-10-001
Download: ML100620886 (2)


Text

Page 1 of 2 Summer 03/03/2010 07:11:39 Inspection / Activity Plan Report 22 03/01/2010 - 06/30/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1EP - EMERGENCY PREPAREDNESS 2009 EXERCISE 3 1 04/19/2010 04/23/2010 IP 7111401 Exercise Evaluation TFPI 805 - TRIENNIAL FIRE PROTECTION 7 1 06/14/2010 06/18/2010 IP 7111105T Fire Protection [Triennial]

1 06/28/2010 07/02/2010 IP 7111105T Fire Protection [Triennial]

EB3 HS - HEAT SINK INSPECTION 1 1 07/26/2010 07/30/2010 IP 7111107T Heat Sink Performance EB1 - MODIFICATIONS - 10CFR50.59 3 1 08/09/2010 08/13/2010 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1 08/23/2010 08/27/2010 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications OL RQ - REQUAL INSPECTION 2 1 08/16/2010 08/20/2010 IP 7111111B Licensed Operator Requalification Program PSB1-RP - RP PUBLIC RADIATION PROTECTION 4 1 08/16/2010 08/20/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 08/16/2010 08/20/2010 IP 71124.04 Occupational Dose Assessment 1 08/16/2010 08/20/2010 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 08/16/2010 08/20/2010 IP 71124.07 Public Radiation Safety 1 08/16/2010 08/20/2010 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1 08/16/2010 08/20/2010 IP 71151 Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 1 09/13/2010 09/17/2010 IP 7111402 Alert and Notification System Evaluation 1 09/13/2010 09/17/2010 IP 7111403 Emergency Response Organization Augmentation Testing 1 09/13/2010 09/17/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 09/13/2010 09/17/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 09/13/2010 09/17/2010 IP 71151 Performance Indicator Verification PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 2 1 10/04/2010 10/08/2010 IP 71152B Identification and Resolution of Problems 1 10/18/2010 10/22/2010 IP 71152B Identification and Resolution of Problems CDBI - COMPONENT DESIGN BASIS INSPECTION 6 1 01/10/2011 01/14/2011 IP 7111121 Component Design Bases Inspection 1 01/31/2011 02/04/2011 IP 7111121 Component Design Bases Inspection 1 02/14/2011 02/18/2011 IP 7111121 Component Design Bases Inspection 1 02/28/2011 03/04/2011 IP 7111121 Component Design Bases Inspection PSB1-RP - RP OCCUPATIONAL WEEK 1 3 1 04/25/2011 04/29/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Summer 03/03/2010 07:11:39 Inspection / Activity Plan Report 22 03/01/2010 - 06/30/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - RP OCCUPATIONAL WEEK 1 3 1 04/25/2011 04/29/2011 IP 71124.02 Occupational ALARA Planning and Controls 1 04/25/2011 04/29/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 04/25/2011 04/29/2011 IP 71124.04 Occupational Dose Assessment 1 04/25/2011 04/29/2011 IP 71124.05 Radiation Monitoring Instrumentation EB3ISI - INSERVICE INSPECTION 1 1 05/02/2011 05/06/2011 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - RP OCCUPATIONAL WEEK 2 2 1 05/09/2011 05/13/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 05/09/2011 05/13/2011 IP 71124.02 Occupational ALARA Planning and Controls 1 05/09/2011 05/13/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 05/09/2011 05/13/2011 IP 71124.04 Occupational Dose Assessment 1 05/09/2011 05/13/2011 IP 71124.05 Radiation Monitoring Instrumentation 1 05/09/2011 05/13/2011 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure