MONTHYEARML24278A2832024-11-0707 November 2024 Letter to E. Carr Environmental Impact Statement Scoping Summary Report for Virgil C. Summer Nuclear Station Unit 1 ML24305A1302024-10-31031 October 2024 Submittal of 30 Day Report Per 10 CFR 26.719(c) Blind Performance Testing ML24308A0052024-10-28028 October 2024 10-28-24 NRC V.C. Summer Nuclear Station SLR Cherokee Nation Letter to USNRC ML24308A0062024-10-25025 October 2024 Subsequent License Renewal Application Area of Potential Effect (Ape) Clarification Fairfield County, South Carolina SHPO Project No. 22-EJ0147 ML24302A1442024-10-24024 October 2024 Update to Subsequent License Renewal Application (SLRA) Supplement 4 and Requested Information Formation in Response to Limited Aging Management Audit ML24250A0782024-10-22022 October 2024 Relief Request RR-5-V1 Regarding Service Water Return Header Check Valves ML24256A2322024-10-22022 October 2024 Relief Request RR-5-P1 Charging/Safety Injection Pumps ML24255A3152024-10-22022 October 2024 Relief Request RR-5-V2 Regarding Pressure Isolation Valves 05000395/LER-2024-002, Loss of Control Room Emergency Filtration System2024-10-15015 October 2024 Loss of Control Room Emergency Filtration System ML24290A1052024-10-0707 October 2024 Core Operating Limits Report VCSNS Unit 1 Cycle 29, Revision 0 IR 05000395/20244042024-09-26026 September 2024 Cyber Security Inspection Report 05000395-2024404 - Public ML24274A1942024-09-26026 September 2024 (Vcsns), Unit 1 Subsequent License Renewal Application (SLRA) First 10 CFR 54.21(b) Annual Amendment ML24221A2112024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0552024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0642024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0542024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0592024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) IR 05000395/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000395/2024402 IR 05000395/20240052024-08-22022 August 2024 Updated Inspection Plan for Virgil C. Summer Nuclear Station - Report 05000395/2024005 ML24190A4012024-08-19019 August 2024 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application - Dominion Energy Letter Dated May 30, 2024 IR 05000395/20240022024-08-12012 August 2024 Integrated Inspection Report 05000395/2024002 ML24180A0062024-08-0505 August 2024 Issuance of Amendment No. 227 to Modify Technical Specification 3.8.3.1 to Increase Completion Time for 120-Volt A.C. Vital Busses ML24218A3002024-08-0101 August 2024 Environmental Review Response to NRC Requests for Additional Information and Response to NRC Requests for Confirmation of Information Set 1 ML24158A3882024-07-31031 July 2024 Issuance of Amendment No. 226 to Change Emergency Plan Staff Augmentation Times and Relocate Emergency Operations Facility ML24162A3292024-07-0505 July 2024 Letter to E Carr - V.C. Summer Unit 1 - Summary of the May 2024 Audit Regarding the Environmental Review of the Subsequent License Renewal Application ML24185A1902024-06-25025 June 2024 Submittal of Updated Final Safety Analysis Report, Revision 24 ML24177A1382024-06-25025 June 2024 Aging Management Audit Report- VC Summer, Unit 1 - Subsequent License Renewal Application ML24178A1192024-06-25025 June 2024 Update to License Amendment Request- Inverter Allowed Outage Time (AOT) Extension ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24171A0152024-06-17017 June 2024 Update to Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Set 2 Safety Review ML24157A3352024-06-0606 June 2024 – Notification of an NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000395-2024404 and Request for Information ML24155A2042024-05-31031 May 2024 Proposed Alternative Request RR-24-123, Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML24155A1462024-05-30030 May 2024 Update to Subsequent License Renewal Application (SLRA) -Response to NRC Request for Additional Information Set 1 Response to NRC Request for Confirmation of Information Set 1 and Supplement 3 ML24143A1792024-05-22022 May 2024 Special Report 2024-001-01 for Virgil C. Summer Nuclear Station (Vcsns), Unit 1, Waste Gas System Inoperability ML24141A2822024-05-20020 May 2024 (Vcsns), Unit 1 - License Amendment Request - Emergency Response Organization (ERO) Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes IR 05000395/20240012024-05-10010 May 2024 Integrated Inspection Report 05000395/2024001 ML24129A2002024-05-0606 May 2024 Update to Subsequent License Renewal Application, Supplement 2 IR 05000395/20240402024-05-0101 May 2024 95001 Supplemental Inspection Report 05000395/2024040 and Follow-Up Assessment Letter ML24121A1002024-04-29029 April 2024 Response to Request for Additional Information Regarding Alternative Request RR-5-V2 ML24120A2072024-04-29029 April 2024 Submittal of Annual Radiological Environmental Operating Report ML24116A2052024-04-23023 April 2024 Annual Radioactive Effluent Release Report ML24109A1792024-04-19019 April 2024 Aging Management Audit Plan Regarding the Subsequent License Renewal Application Review ML24108A0392024-04-18018 April 2024 Letter to E Carr-V.C. Summer Unit 1- Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application ML24108A0672024-04-17017 April 2024 Submittal of Summary for Condition of the Service Water Intake Structure Provided in Accordance with License Condition 2.C.5.d 05000395/LER-2024-001, (Vcsns), Unit 1, Automatic Actuation of B Emergency Diesel Generator2024-04-17017 April 2024 (Vcsns), Unit 1, Automatic Actuation of B Emergency Diesel Generator ML24100A7312024-04-0909 April 2024 Personnel Exposure and Monitoring Annual Report ML24095A2072024-04-0101 April 2024 Update to Subsequent License Renewal Application (SLRA) Supplement 1 ML24088A2062024-03-26026 March 2024 Annual Operating Report ML24087A2182024-03-26026 March 2024 (Vcsns), Unit 1 - License Amendment Request - Emergency Response Organization (ERO) Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes - Response to Request. 2024-09-26
[Table view] |
Text
V.C. Summer Nuclear Station !51; Dominion Bradham Blvd & Hwy 215, Jenkinsville, SC 29065 Mailing Address: ~ Energy P.O. Box 88, Jenkinsvi lle, SC 29065 Do minion En ergy.com
November 30, 2023
Document Control Desk Serial No.23-315 U.S. Nuclear Regulatory Commission VCS UC/HK/Rev 0 Washington, DC 20555 Docket No. 50-395 License No. NPF-12
DOMINION ENERGY SOUTH CAROLINA (DESC)
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 ANNUAL COMMITMENT CHANGE
SUMMARY
REPORT
Dominion Energy South Carolina hereby submits the 2022 Annual Commitment Change Summary Report. The commitment change was performed in accordance with VCSNS Regulatory Commitment Management Program, which was developed following guidance from NEI 99-04 "Guidelines for Managing NRC Commitment Changes."
Should you have any questions, please contact Mr. Michael Moore at (803) 345-4752.
Sincerely,
stice Site Vice Presiden V.C. Summer Nuclear Station
Attachment:
Summary of Commitment Changes
cc : G. J. Lindamood - Santee Cooper L. Dudes - NRC Region II G. Miller - NRC Project Mgr.
NRC Resident Inspector Serial No.23-315 Attachment Page 1 of 2
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) Unit 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12
ATTACHMENT
SUMMARY
OF COMMITMENT CHANGES Serial No.23-315 Attachment Page 2 of 2
The following commitment change, with a brief justification, was performed during 2022 in accordance with the Dominion Energy South Carolina (DESC) Regulatory Commitment Management Program, which was developed following NEI 99-04, "Guidelines for Managing NRC Commitment Changes." The changes are documented in the station's corrective action program condition reports (CRs):
CR-21-02651
Original Commitment Summary - NRC Request for Additional Information 4.3.2-1 (ML030900096), requested additional information concerning ASME Section Ill, Class 2 and 3 piping fatigue, specifically concerning the post-accident and nuclear sampling system potentially approaching the 7,000 cycle limit during the period of extended operation.
VCSNS's response to RAI 4.3.2-1 (ML031681125) states, in part:
"The present sampling method seldom uses loop sampling. VCSNS will administratively limit the use of this loop for emergencies only, for an average of no more than once per cycle. In so doing, the 7,000 cycle limit will not be reached during the period of extended operation. Should sampling methods change such that this loop would be required for more frequent sampling, either a detailed stress analysis would be required that increases the cycle limit to an acceptable limit or the affected components would be replaced."
Change - "The present sampling method seldom uses loop sampling. VCSNS will administratively limit the use of this loop for emergencies and the performance of the integrated leakage assessment test. In so doing, the 7,000 cycle limit will not be reached during the period of extended operation. Should sampling methods change such that this loop would be required for more frequent sampling, either a detailed stress analysis would be required that increases the cycle limit to an acceptable limit or the affected components would be replaced."
Justification for Change - The operation of the 'B' RCS loop sampling line is required once a cycle with the plant in Modes 1 through 3 to allow for the performance of STP-250.024, Nuclear Sampling System Leakage Assessment Test, as required by Technical Specification 6.8.4.a, Primary Coolant Sources Outside Containment.
This surveillance test is not considered an emergency situation or a routine sampling activity as described in the original commitment. Therefore, a commitment change was needed to allow for the surveillance test to be performed while still ensuring that the 7,000 cycle limit for thermal fatigue imposed by ANSI 831.1, Power Piping Code, is maintained without impacting the validity of VCSNS' election to utilize 10 CFR 54.21(c)(1)- Option (i) for the ASME Section Ill Class 2 and 3 Piping Fatigue Time-Limited Aging Analyses in section 4.3.2 of the License Renewal Application.