Summer Inspection / Activity Plan 09/01/2005 - 03/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/29/2005 15:30:09 Report 22 3
EB1-MODS
- MODIFICATIONS/10CFR50.59 Baseline Inspections 10/03/2005 10/07/2005 Evaluation of Changes, Tests, or Experiments IP 7111102 1
Baseline Inspections 10/03/2005 10/07/2005 Permanent Plant Modifications IP 7111117B 1
2 OL PREP
- INITIAL EXAM PREP Not Applicable 11/28/2005 12/03/2005 SUMMER/EXAM AT POWER FACILITIES V23249 1
1 PSB1
- RP PUBLIC PRE-INSP VISIT Baseline Inspections 12/12/2005 12/14/2005 Access Control to Radiologically Significant Areas IP 7112101 1
3 OL EXAM
- INITIAL EXAM Not Applicable 12/12/2005 12/16/2005 SUMMER/EXAM AT POWER FACILITIES V23249 1
2 EB3-MR
- MR EFFECTIVENESS Baseline Inspections 01/09/2006 01/13/2006 Maintenance Effectiveness IP 7111112B 1
4 PS1-RP
- RP BASELINE PUBLIC Baseline Inspections 01/09/2006 01/13/2006 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1
Baseline Inspections 01/09/2006 01/13/2006 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1
Baseline Inspections 01/09/2006 01/13/2006 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P IP 7112203 1
Baseline Inspections 01/09/2006 01/13/2006 Performance Indicator Verification IP 71151 1
5 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 03/13/2006 03/17/2006 Identification and Resolution of Problems IP 71152B 1
Baseline Inspections 03/27/2006 03/31/2006 Identification and Resolution of Problems IP 71152B 1
1 EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 05/01/2006 05/05/2006 Safety System Design and Performance Capability IP 7111121 1
6 EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 05/22/2006 05/26/2006 Safety System Design and Performance Capability IP 7111121 1
Baseline Inspections 06/05/2006 06/09/2006 Safety System Design and Performance Capability IP 7111121 1
Baseline Inspections 06/19/2006 06/23/2006 Safety System Design and Performance Capability IP 7111121 1
1 PS2-EP
- EP INSP Baseline Inspections 07/31/2006 08/04/2006 Alert and Notification System Testing IP 7111402 1
Baseline Inspections 07/31/2006 08/04/2006 Emergency Response Organization Augmentation Testing IP 7111403 1
Baseline Inspections 07/31/2006 08/04/2006 Emergency Action Level and Emergency Plan Changes IP 7111404 1
Baseline Inspections 07/31/2006 08/04/2006 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1
Baseline Inspections 07/31/2006 08/04/2006 Performance Indicator Verification IP 71151 1
2 PSB1
- RP OCCUPATIONAL BASELINE Baseline Inspections 10/09/2006 10/13/2006 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 10/09/2006 10/13/2006 ALARA Planning and Controls IP 7112102 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Summer Inspection / Activity Plan 09/01/2005 - 03/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/29/2005 15:30:09 Report 22 1
EB3-ISI
- INSERVICE INSPECTION Baseline Inspections 10/16/2006 10/20/2006 Inservice Inspection Activities - PWR IP 7111108P 1
1 EB3TI150
- 2515/150 RPV & VHP NOZZLE Safety Issues 10/16/2006 10/19/2006 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA IP 2515/150 1
1 EB3SGISI
- STEAM GENERATOR ISI Baseline Inspections 10/23/2006 10/27/2006 Inservice Inspection Activities - PWR IP 7111108P 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.