Inspection / Activity Plan Page 1 of 1 03/04/2011 06:58:15 Report 22 03/01/2011 - 06/30/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Summer CDBI
- COMPONENT DESIGN BASES INSPECTION 10 1
IP Component Design Bases Inspection 7111121 02/28/2011 03/04/2011 PSB1-RP
- OCCUPATIONAL RP RAD HAZARDS ONLY 2
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/18/2011 04/22/2011 EB3 ISI
- INSERVICE INSPECTION 1
1 IP Inservice Inspection Activities - PWR 7111108P 04/25/2011 04/29/2011 PSB1-RP
- OCCUPATIONAL RP 3
1 IP Occupational ALARA Planning and Controls 71124.02 06/27/2011 07/01/2011 1
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 06/27/2011 07/01/2011 1
IP Occupational Dose Assessment 71124.04 06/27/2011 07/01/2011 1
IP Radiation Monitoring Instrumentation 71124.05 06/27/2011 07/01/2011 1
IP Performance Indicator Verification 71151 06/27/2011 07/01/2011 OL RQ
- REQUAL INSPECTION 3
1 IP Licensed Operator Requalification Program 7111111B 08/08/2011 08/12/2011 OL EXAM
- INITIAL EXAM PREP 3
1 SUMMER/SEPTEMBER 2011 EXAM AT POWER FACILITIES V23356 08/22/2011 08/26/2011 OL EXAM
- INITIAL EXAM - WEEK 1 3
1 SUMMER/SEPTEMBER 2011 EXAM AT POWER FACILITIES V23356 09/12/2011 09/16/2011 OL EXAM
- INITIAL EXAM - WEEK 2 3
1 SUMMER/SEPTEMBER 2011 EXAM AT POWER FACILITIES V23356 09/19/2011 09/23/2011 PSB1EP
- EMERGENCY PREPAREDNESS EXERCISE 3
1 IP Exercise Evaluation 7111401 09/26/2011 09/30/2011 1
IP Emergency Action Level and Emergency Plan Changes 7111404 09/26/2011 09/30/2011 1
IP Performance Indicator Verification 71151 09/26/2011 09/30/2011 TI-177
- TI-177 4
1 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 01/23/2012 01/27/2012 This report does not include INPO and OUTAGE activities.