IR 05000334/2014001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/04/2015
| issue date = 03/04/2015
| title = ROP 15 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2, (Report 05000334/2014001 and 05000412/2014001)
| title = ROP 15 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2, (Report 05000334/2014001 and 05000412/2014001)
| author name = Kennedy S R
| author name = Kennedy S
| author affiliation = NRC/RGN-I/DRP/PB6
| author affiliation = NRC/RGN-I/DRP/PB6
| addressee name = Larson E A
| addressee name = Larson E
| addressee affiliation = FirstEnergy Nuclear Operating Co
| addressee affiliation = FirstEnergy Nuclear Operating Co
| docket = 05000334, 05000412
| docket = 05000334, 05000412
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES rch 4, 2015
[[Issue date::March 4, 2015]]


Mr. Eric Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4 Shippingport, PA 15077-0004
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (REPORT 05000334/2014001 AND 05000412/2014001)


SUBJECT: ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (REPORT 05000334/2014001 AND 05000412/2014001)
==Dear Mr. Larson:==
On February 12, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Beaver Valley Power Station, Unit Nos. 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014, through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
 
The NRC determined that overall, Beaver Valley Power Station, Unit Nos. 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Beaver Valley Power Station Unit Nos. 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 60854.1, Preoperational Testing of Independent Spent Fuel Storage Facility Installations (ISFSI) at Operating Plants, IP 60855.1, Operation of an ISFSI at Operating Plants, and IP 71003, Post Approval Site Inspection for License Renewal. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
 
Additionally, an NRC audit of licensee efforts towards compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," is ongoing for various sites. The audit includes an onsite visit for the NRC staff to evaluate mitigating strategies as described in the licensee submittals, and to receive and review information relative to associated open items. This onsite audit will occur prior to the first unit at the site achieving compliance with the Orders and the audit will aid NRC staff in developing a final Safety Evaluation for the site. The audit at your site has been scheduled for the week of July 20, 2015. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.
 
In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


==Dear Mr. Larson:==
Please contact me at (610) 337-5046 with any questions you have regarding this letter.
On February 12, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Beaver Valley Power Station, Unit Nos. 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014, through December 31, 2014. This letter informs inspections at your facility. The NRC determined that overall, Beaver Valley Power Station, Unit Nos. 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Beaver Valley Power Station Unit Nos. 1 and 2 during the most recent quarter was wProcess (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 60854.1, months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. Additionally, an NRC audit of licensee efforts towards compliance with Order EA-12-Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design--12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," is ongoing for various sites. The audit includes an onsite visit for the NRC staff to evaluate mitigating strategies as described in the licensee submittals, and to receive and review information relative to associated open items. This onsite audit will occur prior to the first unit at the site achieving compliance with the Orders and the audit will aid NRC staff in developing a final Safety Evaluation for the site. The audit at your site has been scheduled for the week of July 20, 2015. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations. In accordance with Title 10 of the Code of Federal RegulationsPublic Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (610) 337-5046 with any questions you have regarding this letter.


Sincerely,
Sincerely,
/RA/ Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects Docket Nos. 50-334, 50-412 License Nos. DPR-66, NPF-73 Enclosure: Beaver Valley Power Station Inspection/Activity Plan cc w/encl: Distribution via ListServ  
/RA/
Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects Docket Nos. 50-334, 50-412 License Nos. DPR-66, NPF-73 Enclosure: Beaver Valley Power Station Inspection/Activity Plan cc w/encl: Distribution via ListServ
 
ML15062A379 Non-Sensitive  Publicly Available SUNSI Review Sensitive  Non-Publicly Available OFFICE RI/DRP  RI/DRP NAME CBickett/ CAB SKennedy/ SRK DATE 02/ 18 /15 02/18/15
 
Page 1 of 2      Beaver Valley 01/22/2015 08:56:34    Inspection / Activity Plan Report 22 01/01/2015 - 06/30/2016 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site ISFSI - ISFSI DRY RUN AND INITIAL LOADING      3 1, 2 01/05/2015 01/09/2015 IP 60854  Preoperational Testing Of An ISFSI 1, 2 01/05/2015 01/09/2015 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 1, 2 01/12/2015 01/16/2015 IP 60855  Operation Of An ISFSI 1, 2 01/12/2015 01/16/2015 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 7111111B - U2 REQUAL INSP W/ P/F RESULTS      2 2 06/15/2015 06/19/2015 IP 7111111B Licensed Operator Requalification Program 71124 - RAD SAFETY INSPECTION      1 1, 2 05/04/2015 05/08/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 05/04/2015 05/08/2015 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 05/04/2015 05/08/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 05/04/2015 05/08/2015 IP 71124.04 Occupational Dose Assessment 7111108P - U1 INSERVICE INSPECTION      1 1 05/04/2015 05/15/2015 IP 7111108P Inservice Inspection Activities - PWR 71003 - LR COMMITMENTS PHASE I OUTAGE INSP      2 1 05/11/2015 05/15/2015 IP 71003  Post-Approval Site Inspection for License Renewal PI&R - PI&R BIENNIAL      4 1, 2 06/08/2015 06/12/2015 IP 71152B Problem Identification and Resolution 1, 2 06/22/2015 06/26/2015 IP 71152B Problem Identification and Resolution EP - EP PROGRAM INSPECTION      1 1, 2 06/29/2015 07/02/2015 IP 7111402 Alert and Notification System Testing 1, 2 06/29/2015 07/02/2015 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 06/29/2015 07/02/2015 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 71124.07 - RAD SAFETY INSPECTION      1 1, 2 07/06/2015 07/10/2015 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 07/06/2015 07/10/2015 IP 71151  Performance Indicator Verification TRI FI - TRIENNIAL FIRE PROTECTION INSPECTION      6 1, 2 08/03/2015 08/07/2015 IP 7111105T Fire Protection [Triennial]
1, 2 08/17/2015 08/21/2015 IP 7111105T Fire Protection [Triennial]
12/7EXAM - U2 INITIAL OL EXAM      3 2 11/09/2015 11/13/2015 U01906 FY16-BV2 INITIAL OPERATOR LICENSING EXAM 2 12/07/2015 12/18/2015 U01906 FY16-BV2 INITIAL OPERATOR LICENSING EXAM 71003 - LR COMMITMENTS PHASE II TEAM INSP      4 1 08/31/2015 09/04/2015 IP 71003  Post-Approval Site Inspection for License Renewal This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.


ML15062A379  SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME CBickett/ CAB SKennedy/ SRK DATE 02/ 18 /15 02/18/15 Page 1 of 2 01/22/2015 08:56:34 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteBeaver ValleyInspection / Activity Plan 01/01/2015
Page 2 of 2     Beaver Valley 01/22/2015 08:56:34   Inspection / Activity Plan Report 22 01/01/2015 - 06/30/2016 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site 71003 - LR COMMITMENTS PHASE II TEAM INSP    4 1 09/14/2015 09/18/2015 IP 71003  Post-Approval Site Inspection for License Renewal 7111108P - U2 INSERVICE INSPECTION    1 2 10/05/2015 10/16/2015 IP 7111108P Inservice Inspection Activities - PWR 71124 - RAD SAFETY INSP      1 1, 2 10/19/2015 10/23/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/19/2015 10/23/2015 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 10/19/2015 10/23/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/19/2015 10/23/2015 IP 71124.04 Occupational Dose Assessment 1, 2 10/19/2015 10/23/2015 IP 71124.05 Radiation Monitoring Instrumentation 71124 - RAD SAFETY INSP     1 1, 2 12/14/2015 12/18/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 12/14/2015 12/18/2015 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 12/14/2015 12/18/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 12/14/2015 12/18/2015 IP 71124.04 Occupational Dose Assessment 1, 2 12/14/2015 12/18/2015 IP 71151  Performance Indicator Verification 71124 - RAD SAFETY INSPECTION      1 1, 2 03/07/2016 03/11/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/07/2016 03/11/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/07/2016 03/11/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/07/2016 03/11/2016 IP 71124.04 Occupational Dose Assessment EP - EP EXERCISE EVALUATION      4 1, 2 06/13/2016 06/17/2016 IP 7111401 Exercise Evaluation 7111107T - TRIENNIAL HEAT SINK      1 1, 2 05/16/2016 05/20/2016 IP 7111107T Heat Sink Performance 7111117T - PERMANENT PLANT MODIFICATIONS    1 1, 2 06/06/2016 06/10/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1, 2 06/20/2016 06/24/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications This report does not include INPO and OUTAGE activities.
-06/30/2016 ISFSI-ISFSI DRY RUN AND INITIAL LOADING 3 1, 2 IP Preoperational Testing Of An ISFSI 60854 01/05/2015 01/09/2015 1, 2 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 60854.1 01/05/2015 01/09/2015 1, 2 IP Operation Of An ISFSI 60855 01/12/2015 01/16/2015 1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 01/12/2015 01/16/20157111111B-U2 REQUAL INSP W/ P/F RESULTS 2 2 IP Licensed Operator Requalification Program7111111B 06/15/2015 06/19/201571124-RAD SAFETY INSPECTION 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 05/04/2015 05/08/2015 1, 2 IP Occupational ALARA Planning and Controls71124.02 05/04/2015 05/08/2015 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 05/04/2015 05/08/2015 1, 2 IP Occupational Dose Assessment71124.04 05/04/2015 05/08/20157111108P-U1 INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 05/04/2015 05/15/2015 71003-LR COMMITMENTS PHASE I OUTAGE INSP 2 1 IP Post-Approval Site Inspection for License Renewal 7100305/11/2015 05/15/2015 PI&R-PI&R BIENNIAL 4 1, 2 IP Problem Identification and Resolution71152B 06/08/2015 06/12/2015 1, 2 IP Problem Identification and Resolution71152B 06/22/2015 06/26/2015 EP-EP PROGRAM INSPECTION 1 1, 2 IP A lert and Notification System Testing7111402 06/29/2015 07/02/2015 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 06/29/2015 07/02/2015 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 06/29/2015 07/02/201571124.07-RAD SAFETY INSPECTION 1 1, 2 IP Radiological Environmental Monitoring Program71124.07 07/06/2015 07/10/2015 1, 2 IP Performance Indicator Verification71151 07/06/2015 07/10/2015 TRI FI-TRIENNIAL FIRE PROTECTION INSPECTION 6 1, 2 IP Fire Protection [Triennial]7111105T 08/03/2015 08/07/2015 1, 2 IP Fire Protection [Triennial]7111105T 08/17/2015 08/21/201512/7EXAM-U2 INITIAL OL EXAM 3 2 FY16-BV2 INITIAL OPERATOR LICENSING EXAM U0190611/09/201511/13/2015 2 FY16-BV2 INITIAL OPERATOR LICENSING EXAM U01906 12/07/2015 12/18/2015 71003-LR COMMITMENTS PHASE II TEAM INSP 4 1 IP Post-Approval Site Inspection for License Renewal 71003 08/31/2015 09/04/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.


Page 2 of 2 01/22/2015 08:56:34 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteBeaver ValleyInspection / Activity Plan 01/01/2015
This report shows only on-site and announced inspection procedures.
-06/30/2016 71003-LR COMMITMENTS PHASE II TEAM INSP 4 1 IP Post-Approval Site Inspection for License Renewal 71003 09/14/2015 09/18/20157111108P-U2 INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 10/05/2015 10/16/201571124-RAD SAFETY INSP 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/19/2015 10/23/2015 1, 2 IP Occupational ALARA Planning and Controls71124.02 10/19/2015 10/23/2015 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/19/2015 10/23/2015 1, 2 IP Occupational Dose Assessment71124.04 10/19/2015 10/23/2015 1, 2 IP Radiation Monitoring Instrumentation71124.05 10/19/2015 10/23/201571124-RAD SAFETY INSP 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 12/14/2015 12/18/2015 1, 2 IP Occupational ALARA Planning and Controls71124.02 12/14/2015 12/18/2015 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 12/14/2015 12/18/2015 1, 2 IP Occupational Dose Assessment71124.04 12/14/2015 12/18/2015 1, 2 IP Performance Indicator Verification71151 12/14/2015 12/18/201571124-RAD SAFETY INSPECTION 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/07/201603/11/2016 1, 2 IP Occupational ALARA Planning and Controls71124.02 03/07/201603/11/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/07/201603/11/2016 1, 2 IP Occupational Dose Assessment71124.04 03/07/201603/11/2016 EP-EP EXERCISE EVALUATION 4 1, 2 IP Exercise Evaluation7111401 06/13/2016 06/17/20167111107T-TRIENNIAL HEAT SINK 1 1, 2 IP Heat Sink Performance7111107T 05/16/2016 05/20/20167111117T-PERMANENT PLANT MODIFICATIONS 1 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 06/06/2016 06/10/2016 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 06/20/2016 06/24/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 14:40, 31 October 2019

ROP 15 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2, (Report 05000334/2014001 and 05000412/2014001)
ML15062A379
Person / Time
Site: Beaver Valley
Issue date: 03/04/2015
From: Silas Kennedy
NRC/RGN-I/DRP/PB6
To: Emily Larson
FirstEnergy Nuclear Operating Co
KENNEDY, SR
Shared Package
ML15049A479 List:
References
IR 2014001
Download: ML15062A379 (5)


Text

UNITED STATES rch 4, 2015

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (REPORT 05000334/2014001 AND 05000412/2014001)

Dear Mr. Larson:

On February 12, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Beaver Valley Power Station, Unit Nos. 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014, through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Beaver Valley Power Station, Unit Nos. 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Beaver Valley Power Station Unit Nos. 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 60854.1, Preoperational Testing of Independent Spent Fuel Storage Facility Installations (ISFSI) at Operating Plants, IP 60855.1, Operation of an ISFSI at Operating Plants, and IP 71003, Post Approval Site Inspection for License Renewal. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

Additionally, an NRC audit of licensee efforts towards compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," is ongoing for various sites. The audit includes an onsite visit for the NRC staff to evaluate mitigating strategies as described in the licensee submittals, and to receive and review information relative to associated open items. This onsite audit will occur prior to the first unit at the site achieving compliance with the Orders and the audit will aid NRC staff in developing a final Safety Evaluation for the site. The audit at your site has been scheduled for the week of July 20, 2015. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.

In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610) 337-5046 with any questions you have regarding this letter.

Sincerely,

/RA/

Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects Docket Nos. 50-334, 50-412 License Nos. DPR-66, NPF-73 Enclosure: Beaver Valley Power Station Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML15062A379 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME CBickett/ CAB SKennedy/ SRK DATE 02/ 18 /15 02/18/15

Page 1 of 2 Beaver Valley 01/22/2015 08:56:34 Inspection / Activity Plan Report 22 01/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ISFSI - ISFSI DRY RUN AND INITIAL LOADING 3 1, 2 01/05/2015 01/09/2015 IP 60854 Preoperational Testing Of An ISFSI 1, 2 01/05/2015 01/09/2015 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 1, 2 01/12/2015 01/16/2015 IP 60855 Operation Of An ISFSI 1, 2 01/12/2015 01/16/2015 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 7111111B - U2 REQUAL INSP W/ P/F RESULTS 2 2 06/15/2015 06/19/2015 IP 7111111B Licensed Operator Requalification Program 71124 - RAD SAFETY INSPECTION 1 1, 2 05/04/2015 05/08/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 05/04/2015 05/08/2015 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 05/04/2015 05/08/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 05/04/2015 05/08/2015 IP 71124.04 Occupational Dose Assessment 7111108P - U1 INSERVICE INSPECTION 1 1 05/04/2015 05/15/2015 IP 7111108P Inservice Inspection Activities - PWR 71003 - LR COMMITMENTS PHASE I OUTAGE INSP 2 1 05/11/2015 05/15/2015 IP 71003 Post-Approval Site Inspection for License Renewal PI&R - PI&R BIENNIAL 4 1, 2 06/08/2015 06/12/2015 IP 71152B Problem Identification and Resolution 1, 2 06/22/2015 06/26/2015 IP 71152B Problem Identification and Resolution EP - EP PROGRAM INSPECTION 1 1, 2 06/29/2015 07/02/2015 IP 7111402 Alert and Notification System Testing 1, 2 06/29/2015 07/02/2015 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 06/29/2015 07/02/2015 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 71124.07 - RAD SAFETY INSPECTION 1 1, 2 07/06/2015 07/10/2015 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 07/06/2015 07/10/2015 IP 71151 Performance Indicator Verification TRI FI - TRIENNIAL FIRE PROTECTION INSPECTION 6 1, 2 08/03/2015 08/07/2015 IP 7111105T Fire Protection [Triennial]

1, 2 08/17/2015 08/21/2015 IP 7111105T Fire Protection [Triennial]

12/7EXAM - U2 INITIAL OL EXAM 3 2 11/09/2015 11/13/2015 U01906 FY16-BV2 INITIAL OPERATOR LICENSING EXAM 2 12/07/2015 12/18/2015 U01906 FY16-BV2 INITIAL OPERATOR LICENSING EXAM 71003 - LR COMMITMENTS PHASE II TEAM INSP 4 1 08/31/2015 09/04/2015 IP 71003 Post-Approval Site Inspection for License Renewal This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Beaver Valley 01/22/2015 08:56:34 Inspection / Activity Plan Report 22 01/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71003 - LR COMMITMENTS PHASE II TEAM INSP 4 1 09/14/2015 09/18/2015 IP 71003 Post-Approval Site Inspection for License Renewal 7111108P - U2 INSERVICE INSPECTION 1 2 10/05/2015 10/16/2015 IP 7111108P Inservice Inspection Activities - PWR 71124 - RAD SAFETY INSP 1 1, 2 10/19/2015 10/23/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/19/2015 10/23/2015 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 10/19/2015 10/23/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/19/2015 10/23/2015 IP 71124.04 Occupational Dose Assessment 1, 2 10/19/2015 10/23/2015 IP 71124.05 Radiation Monitoring Instrumentation 71124 - RAD SAFETY INSP 1 1, 2 12/14/2015 12/18/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 12/14/2015 12/18/2015 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 12/14/2015 12/18/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 12/14/2015 12/18/2015 IP 71124.04 Occupational Dose Assessment 1, 2 12/14/2015 12/18/2015 IP 71151 Performance Indicator Verification 71124 - RAD SAFETY INSPECTION 1 1, 2 03/07/2016 03/11/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/07/2016 03/11/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/07/2016 03/11/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/07/2016 03/11/2016 IP 71124.04 Occupational Dose Assessment EP - EP EXERCISE EVALUATION 4 1, 2 06/13/2016 06/17/2016 IP 7111401 Exercise Evaluation 7111107T - TRIENNIAL HEAT SINK 1 1, 2 05/16/2016 05/20/2016 IP 7111107T Heat Sink Performance 7111117T - PERMANENT PLANT MODIFICATIONS 1 1, 2 06/06/2016 06/10/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1, 2 06/20/2016 06/24/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.