August 29, 2024
SUBJECT:
UPDATED INSPECTION PLAN FOR BEAVER VALLEY POWER STATION, UNITS 1 AND 2 (REPORTS 05000334/2024005 AND 05000412/2024005)
Dear Barry Blair:
The enclosed inspection plan lists the inspections scheduled through June 30, 2026, for Beaver Valley Power Station, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
As noted in the attached inspection plan, in addition to baseline inspections, the NRC will implement Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal, Phase 1 and 4, at your facility.
This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Please contact me at (610) 337-5205 with any questions you have regarding this letter.
Sincerely, Matt R. Young, Chief Projects Branch 2 Division of Operating Reactor Safety
Docket Nos. 05000334 and 05000412 License Nos. DPR-66 and NPF-73
Enclosure:
As stated
cc w/ encl: Distribution via LISTSERV MATTHEW YOUNG Digitally signed by MATTHEW YOUNG Date: 2024.08.29 07:44:14 -04'00'
SUNSI Review
Non-Sensitive
Sensitive
Publicly Available
Non-Publicly Available OFFICE RI/DORS RI/DORS NAME SElkhiamy MYoung DATE 8/27/2024 8/27/2024
Site Inspection Activity Plan Beaver Valley 07/01/2024 - 06/30/2026 Unit Start End Activity CAC Title Staff Count Comprehensive Engineering Team Inspection - Beaver Valley
1,2 7/15/2024 7/19/2024 IP 71111.21M 000713 Comprehensive Engineering Team Inspection 1,2 7/29/2024 8/2/2024 IP 71111.21M 000713 Comprehensive Engineering Team Inspection Access Control, Protective Strategy, TSR, SPR
1,2 8/5/2024 8/8/2024 IP 71130.02 000734 Access Control 1,2 8/5/2024 8/8/2024 IP 71130.05 000737 Protective Strategy Evaluation 1,2 8/5/2024 8/8/2024 IP 71130.09 001656 Security Plan Changes 1,2 8/5/2024 8/8/2024 IP 71130.14 000743 Review of Power Reactor Target Sets 1,2 8/5/2024 8/8/2024 IP 71151 001338 Performance Indicator Verification License Renewal Phase 4 - Beaver Valley Unit 1
1 9/9/2024 9/13/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal RP - 71124.08 Rad Waste - BV
1,2 9/16/2024 9/20/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 2024 BV2 Initial Operator Licensing Exam
2 8/26/2024 8/30/2024 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
10/6/2024 10/11/2024 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
Inservice Inspection - Beaver Valley Unit 2
2 10/14/2024 11/1/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP - 71151 PI Verification - BV
1,2 11/12/2024 11/15/2024 IP 71151 000746 Performance Indicator Verification RP Airborne 71124.03 and Dose Assessment 71124.04 - BV
1,2 1/26/2025 1/31/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 1/26/2025 1/31/2025 IP 71124.04 000728 Occupational Dose Assessment Fire Protection - Beaver Valley
1,2 3/3/2025 3/7/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
1,2 3/17/2025 3/21/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
1,2 3/3/2025 3/7/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment Access Control, Maintenance, Sec Trng, SPR, PIs - BV
1,2 4/14/2025 4/18/2025 IP 71130.02 000734 Access Control 1,2 4/14/2025 4/18/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 4/14/2025 4/18/2025 IP 71130.07 000739 Security Training Prepared on 8/14/2024 2:20:58 PM 1 of 3 Enclosure
Site Inspection Activity Plan 1,2 4/14/2025 4/18/2025 IP 71130.09 001656 Security Plan Changes 1,2 4/14/2025 4/18/2025 IP 71151 001338 Performance Indicator Verification PI&R Biennial Team Inspection - Beaver Valley
1,2 4/28/2025 5/2/2025 IP 71152B 000747 Problem Identification and Resolution 1,2 5/12/2025 5/16/2025 IP 71152B 000747 Problem Identification and Resolution EP Program Inspection - Beaver Valley
1,2 5/5/2025 5/9/2025 IP 71114.02 000717 Alert and Notification System Testing 1,2 5/5/2025 5/9/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 5/5/2025 5/9/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 5/5/2025 5/9/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 5/5/2025 5/9/2025 IP 71151 001397 Performance Indicator Verification RP REMP 71124.07 - BV
1,2 5/19/2025 5/23/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program BV2 Requal Inspection with P/F Results
2 7/21/2025 7/25/2025 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance
7/21/2025 7/25/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Cyber Security - Beaver Valley
1,2 8/18/2025 8/22/2025 IP 71130.10 000741 Cybersecurity FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - BV
1,2 8/4/2025 8/8/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1,2 8/25/2025 8/29/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 2025 BV2 Initial Operator Licensing Exam
2 9/7/2025 9/13/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
10/5/2025 10/11/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
Inservice Inspection - Beaver Valley Unit 1
1 10/6/2025 10/17/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP Rad Hazard Assessment and Exposure Control 71124.01 - BV
1,2 10/19/2025 10/24/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls AA, FFD - BV
1,2 12/8/2025 12/12/2025 IP 71130.01 000733 Access Authorization 1,2 12/8/2025 12/12/2025 IP 71130.08 000740 Fitness-For-Duty Program RP PI Verification 71151 - BV
1,2 12/15/2025 12/19/2025 IP 71151 000746 Performance Indicator Verification Commercial Grade Dedication - Beaver Valley
1,2 2/9/2026 2/13/2026 IP 71111.21N.03 001808 Commercial Grade Dedication Prepared on 8/14/2024 2:20:58 PM 2 of 3
Site Inspection Activity Plan 1,2 2/23/2026 2/27/2026 IP 71111.21N.03 001808 Commercial Grade Dedication BV1 Biennial Requal Inspection
1 3/9/2026 3/13/2026 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance License Renewal Phase 1 - Beaver Valley Unit 2
2 4/27/2026 5/8/2026 IP 71003 000687 Post-Approval Site Inspection for License Renewal Inservice Inspection - Beaver Valley Unit 2
2 4/27/2026 5/8/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP Rad Hazard Assessment and Exposure Control 71124.01 - BV
1,2 4/27/2026 5/1/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Sec - Access Control, Equipment Testing and Maintenance, Training, SPR, PI Verification - BV
1,2 6/1/2026 6/5/2026 IP 71130.02 000734 Access Control 1,2 6/1/2026 6/5/2026 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 6/1/2026 6/5/2026 IP 71130.07 000739 Security Training 1,2 6/1/2026 6/5/2026 IP 71130.09 001656 Security Plan Changes 1,2 6/1/2026 6/5/2026 IP 71151 001338 Performance Indicator Verification EP Exercise Inspection - Beaver Valley
1,2 6/8/2026 6/12/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 6/8/2026 6/12/2026 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event 1,2 6/8/2026 6/12/2026 IP 71151 001397 Performance Indicator Verification Prepared on 8/14/2024 2:20:58 PM 3 of 3