Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24025A092 | 25 January 2024 | Requalification Program Inspection | |
L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 | 18 December 2023 | Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 | |
IR 05000334/2023011 | 4 December 2023 | Age-Related Degradation Inspection Report 05000334/2023011 and 05000412/2023011 | Probabilistic Risk Assessment Aging Management Significance Determination Process License Renewal Maintenance Rule Program |
L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports | 29 November 2023 | Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports | Flow Induced Vibration Power Uprate |
IR 05000334/2023301 | 27 November 2023 | Initial Operator Licensing Examination Report 05000334/2023301 | |
L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA0025615 | 17 November 2023 | Discharge Monitoring Report (NPDES) Permit No. PA0025615 | |
IR 05000334/2023003 | 6 November 2023 | Integrated Inspection Report 05000334/2023003 and 05000412/2023003 | Functionality Assessment FLEX Operability Determination Through Wall Leak Fire Protection Program Grace period Downpower |
L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 | 20 October 2023 | Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 | |
ML23279A061 | 5 October 2023 | Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) | Commercial Grade Dedication |
ML23198A359 | 2 October 2023 | Issuance of Amendment Nos. 322 and 212 Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident (EPID L-2022-LLA-0129) - Nonproprietary | Loop seal Post Accident Monitoring Hydrostatic Nondestructive Examination Pressure and Temperature Limits Report Fuel cladding Power Uprate |
IR 05000334/2023402 | 29 September 2023 | Security Baseline Inspection Report 05000334/2023402 and 05000412/2023402 (Cover Letter Only) | Affidavit |
ML23237B422 | 28 September 2023 | Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments | |
ML23269A124 | 27 September 2023 | Request for Withholding Information from Public Disclosure | |
IR 05000334/2023401 | 21 September 2023 | Cybersecurity Inspection Report 05000334/2023401 and 05000412/2023401 (Cover Letter Only) | Affidavit |
ML23263A019 | 20 September 2023 | Operator Licensing Examination Approval | |
ML23243A927 | 19 September 2023 | Review of the Fall 2022 Steam Generator Tube Inspection Report | |
ML23249A184 | 18 September 2023 | Authorization and Safety Evaluation for Alternative Request No. 2-TYP-4-RV-06 | Liquid penetrant |
L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 | 14 September 2023 | Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 | Grab sample |
L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report | 13 September 2023 | Twenty-Third Refueling Outage Inservice Inspection Summary Report | |
L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | 12 September 2023 | Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | |
IR 05000334/2023005 | 31 August 2023 | Updated Inspection Plan for Beaver Valley Power Station Units 1 and 2 (Report 05000334/2023005 and 05000412/2023005) | Cyber Security License Renewal |
L-23-172, Quality Assurance Program Manual | 31 August 2023 | Quality Assurance Program Manual | Offsite Dose Calculation Manual Nondestructive Examination Temporary Modification Condition Adverse to Quality Aging Management Process Control Program License Renewal Pandemic Grace period |
ML23129A172 | 25 August 2023 | Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 | |
IR 05000334/2023002 | 9 August 2023 | Integrated Inspection Report 05000334/2023002 and 05000412/2023002 | Boric Acid High Radiation Area Past operability Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area Operability Determination Liquid penetrant Fire Protection Program |
ML23219A059 | 7 August 2023 | Steam Generator Inspection Reports - Spring 2023 Spring Refueling Outrage | Non-Destructive Examination |
L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | 7 August 2023 | Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | Cyber Security Safeguards Contingency Plan Fire Protection Program |
L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 | 18 July 2023 | Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 | Grab sample |
ML23188A098 | 17 July 2023 | Correction to the Safety Evaluation Issued Related to Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time | Recently irradiated fuel |
ML23188A067 | 10 July 2023 | Project Manager Assignment | |
L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA0025615 | 26 June 2023 | Discharge Monitoring Report (NPDES) Permit No. PA0025615 | |
L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report | 13 June 2023 | Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report | |
ML23157A107 | 7 June 2023 | Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000334/2023011 and 05000412/2023011 | Probabilistic Risk Assessment Aging Management Operability Determination |
ML23143A027 | 23 May 2023 | Licensed Operator Positive Fitness-For-Duty Test | |
L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 34 | 23 May 2023 | Submittal of the Updated Final Safety Analysis Report, Revision 34 | |
ML23102A147 | 22 May 2023 | Issuance of Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time | Anticipated operational occurrence Surveillance Frequency Control Program Recently irradiated fuel Offsite Circuit |
L-23-065, Annual Financial Report | 22 May 2023 | Annual Financial Report | |
ML23135A787 | 19 May 2023 | Summary of Conference Calls Regarding the Spring 2023 Steam Generator Tube Inspections | |
L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA0025615 | 18 May 2023 | Discharge Monitoring Report (NPDES) Permit No. PA0025615 | |
ML23124A174 | 17 May 2023 | Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 | |
L-23-125, Cycle 24 Core Operating Limits Report | 17 May 2023 | Cycle 24 Core Operating Limits Report | Shutdown Margin |
ML23124A388 | 16 May 2023 | Summary of Regulatory Audit in Support of License Amendment Request to Revise Technical Specification 5.6.3, Core Operating Limits Reports (COLR) and TS 4.2.1 Fuel Assemblies | |
ML23129A011 | 16 May 2023 | Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) | |
L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations | 10 May 2023 | Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations | |
IR 05000334/2023001 | 8 May 2023 | Integrated Inspection Report 05000334/2023001 and 05000412/2023001 | Boric Acid Past operability Enforcement Discretion Temporary Modification Functionality Assessment Condition Adverse to Quality Significance Determination Process Operability Determination Fire Protection Program Power change |
L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations | 5 May 2023 | Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations | Liquid penetrant |
ML23118A381 | 28 April 2023 | 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations | Weld Overlay Coatings Nondestructive Examination Liquid penetrant Dissimilar Metal Weld |
L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological | 27 April 2023 | Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological | Grab sample Offsite Dose Calculation Manual Zebra Mussel Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Veliger Chernobyl Biofouling |
L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA0025615 | 22 April 2023 | Discharge Monitoring Report (Npdes), Permit No. PA0025615 | |
CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | 20 April 2023 | ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | |
ML23107A250 | 18 April 2023 | Requalification Program Inspection |