August 30, 2005 Mr. L. William Pearce Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, Pennsylvania 15077
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - BEAVER VALLEY POWER STATION
Dear Mr. Pearce:
On August 2, 2005, the NRC staff completed its performance review of Beaver Valley Power Station Units 1 and 2 (Beaver Valley) for the first half of the calendar year 2005 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.
Plant performance for the most recent quarter for Beaver Valley Units 1 and 2 was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we currently plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2007. The plan contains inspections of the replacement of the Unit 1 reactor vessel head and steam generators during your upcoming Unit 1 refueling outage. The inspection plan is provided to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Mr. L. William Pearce 2
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Dr. Ronald R. Bellamy, Chief Reactor Projects Branch 7 Division of Reactor Projects Docket Nos. 50-334, 50-412 License Nos. DPR-66, NPF-73
Enclosure:
Beaver Valley Power Station, Units 1 and 2 Inspection/ Activity Plan cc w/encl:
J. Lash, Plant Manager T. Cosgrove, Director, Maintenance P. Sena, Director, Engineering R. Mende, Director, Site Performance Improvement L. Freeland, Manager, Regulatory Affairs M. OReilly, Attorney, FENOC B. Sepelak, Site Licensing Support M. Clancy, Mayor, Shippingport, PA R. Janati, Director, Bureau of Radiation Protection, Commonwealth of Pennsylvania C. OClaire, State Liaison to the NRC, State of Ohio Z. Clayton, EPA-DERR, State of Ohio Director, Utilities Department, Public Utilities Commission, State of Ohio D. Hill, Chief, Radiological Health Program, State of West Virginia J. Lewis, Commissioner, Division of Labor, State of West Virginia W. Hill, Beaver County Emergency Management Agency J. Johnsrud, National Energy Committee, Sierra Club
Mr. L. William Pearce 3
Distribution w/encl:
S. Collins, RA M. Dapas, DRA R. Bellamy, DRP R. Fuhrmeister, DRP S. Lee, RI OEDO R. Laufer, NRR T. Colburn, PM, NRR R. Guzman, NRR P. Cataldo - Senior Resident Inspector P. Garrett - Resident OA DRS Director, Region I DRS Deputy Director, Region I DRS Branch Chiefs (5)
C. ODaniell, DRP Region I Docket Room (with concurrences)
RidsNrrDipmIipb@nrc.gov Institute of Nuclear Power Operations (INPO)
SISP Review Complete: ______AAR_____ (Reviewers Initials)
DOCUMENT NAME: S:\\ROP-6 Mid-Cycle Review\\2005 Mid-Cycle Letters\\BV2005midletterRev2.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME Rfuhrmeister/RLF1 Rbellamy/RRB BHolian/BEH DATE 8/ /2005 8/ /2005 8/ /2005 OFFICIAL RECORD COPY
Beaver Valley Inspection / Activity Plan 08/01/2005 - 03/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2005 10:31:50 Report 22 4
- PI&R Baseline Inspections 08/15/2005 08/19/2005 Identification and Resolution of Problems IP 71152B 1, 2 Baseline Inspections 08/29/2005 09/02/2005 Identification and Resolution of Problems IP 71152B 1, 2 1
7112201
- PUB RAD SAFETY - RETS Baseline Inspections 08/08/2005 08/12/2005 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2 3
7111111B
- LO REQUAL PROG (U2 OPTEST)&P/F RESULTS Baseline Inspections 10/24/2005 10/28/2005 Licensed Operator Requalification Program IP 7111111B 1, 2 1
71007
- U1 RX HEAD REPLACEMENT Other Routine 11/14/2005 11/18/2005 Reactor Vessel Head Replacement Inspection IP 71007 1
1 50001
- U1 SG REPLACEMENT Other Routine 01/01/2006 04/01/2006 Steam Generator Replacement Inspection IP 50001 1
1 71007
- U1 HEAD REPLACEMENT Other Routine 01/09/2006 04/28/2006 Reactor Vessel Head Replacement Inspection IP 71007 1
1 7112101
- OCC RAD SAFETY - ACCESS Baseline Inspections 02/27/2006 03/03/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2 1
7111108P
- INSERVICE INSPECTION - UNIT 1 Baseline Inspections 04/10/2006 04/14/2006 Inservice Inspection Activities - PWR IP 7111108P 1
1 7112102
- OCC RAD SAFETY - ALARA Baseline Inspections 04/24/2006 04/28/2006 ALARA Planning and Controls IP 7112102 1, 2 1
7112202
- PUB RAD SAFETY - RADWASTE Baseline Inspections 06/12/2006 06/16/2006 Radioactive Material Processing and Transportation IP 7112202 1, 2 6
7111121
- SSD&PC Baseline Inspections 06/12/2006 06/16/2006 Safety System Design and Performance Capability IP 7111121 1, 2 Baseline Inspections 06/26/2006 06/30/2006 Safety System Design and Performance Capability IP 7111121 1, 2 Baseline Inspections 07/10/2006 07/14/2006 Safety System Design and Performance Capability IP 7111121 1, 2 Baseline Inspections 07/17/2006 07/20/2006 Safety System Design and Performance Capability IP 7111121 1, 2 5
7111401
- EXERCISE EVALUATION & EP PI VERIFICATION Baseline Inspections 06/26/2006 06/30/2006 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 06/26/2006 06/30/2006 Performance Indicator Verification IP 71151 1, 2 3
7111111B
- L.O. REQUAL PROGRAM (FOCUS U1 OPTEST)
Baseline Inspections 11/06/2006 11/10/2006 Licensed Operator Requalification Program IP 7111111B 1, 2 Baseline Inspections 11/13/2006 11/17/2006 Licensed Operator Requalification Program IP 7111111B 1, 2 1
7111112B
- MAINTENANCE RULE Baseline Inspections 09/11/2006 09/15/2006 Maintenance Effectiveness IP 7111112B 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Beaver Valley Inspection / Activity Plan 08/01/2005 - 03/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2005 10:31:50 Report 22 1
7112103
- OCC RAD SAFETY - INSTRUMENTS Baseline Inspections 10/02/2006 10/06/2006 ALARA Planning and Controls IP 7112102 1, 2 1
7111108P
- INSERVICE INSPECTION - UNIT 2 Baseline Inspections 10/30/2006 11/03/2006 Inservice Inspection Activities - PWR IP 7111108P 2
4 12/11+EX
- OPERATOR LICENSING INITIAL EXAMS Not Applicable 11/13/2006 11/17/2006 BEAVER VALLEY, UNITS 1 & 2 INITIAL EXAM (2/07)
U01598 1
Not Applicable 12/11/2006 12/23/2006 BEAVER VALLEY, UNITS 1 & 2 INITIAL EXAM (2/07)
U01598 1
3 TRI FIRE
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 01/22/2007 01/26/2007 Fire Protection [Triennial]
IP 7111105T 1
Baseline Inspections 02/05/2007 02/09/2007 Fire Protection [Triennial]
IP 7111105T 1
1 7112101
- OCC RAD SAFETY Baseline Inspections 03/05/2007 03/09/2007 Access Control to Radiologically Significant Areas IP 7112101 1, 2 4
- PI&R Baseline Inspections 03/26/2007 03/30/2007 Identification and Resolution of Problems IP 71152B 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.