UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA. PENNSYLVANIA 19406.1415 September 1, 201L Mr. PaulA. Harden, Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station P. O. Box 4, Route 168 Shippingport, PA 15077
SUBJECT:
MID-CYCLE LETTER FOR BEAVER VALLEY POWER STATION, UNITS 1 AND 2 (REPORT 05000334/201 1 006 AND 05000412t2011 006)
Dear Mr. Harden:
On August 9,2011, the NRC completed its mid-cycle performance review of the Beaver Valley Power Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (Pls) in addition to inspection results and enforcement actions from July 1,2010 through June 30, 2011. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan.
The NRC determined the performance at Beaver Valley, Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all Pls indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31,2012.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In the days following the Fukushima Daiichi nuclear accident in Japan, the Commission directed the staff to establish a senior-level agency task force to conduct a methodical and systematic review of the NRC's processes and regulations to determine whether the agency should make additional improvements to its regulatory system. The NRC has since completed Temporary lnstruction (Tl) 183, "Follow-up to Fukushima Daiichi Nuclear Station Fuel Damage Event," and Tl-184, "Availability and Readiness Inspection of Severe Accident Management Guidelines (SAMGs)" at your facility. Results of these inspections can be found here:
http://www.nrc.qov/iapan/iapan-activities.html. Additionally, on May 1 1,2011, the agency issued NRC Bulletin 2011-01, "Mitigating Strategies," to confirm compliance with Order EA-02-026, subsequently imposed license conditions, and 10 CFR 50.54(hhx2), and to
P. Harden determine the status of licensee mitigating strategies programs. On July 12,2011, the NRC's Task Force made its recommendations to the Commission in its report, "Recommendations for Enhancing Reactor Safety in the 21't Century: The Near-Term Task Force Review of lnsights from the Fukushima DaiichiAccident." The NRC is currently reviewing the Task Force's recommendations to determine what additional actions may be warranted.
ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 610-337-5046 with any questions you have regarding this letter.
Sincerely,
/1/v 4/
Eugene M. DiPaolo, Acting Chief Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-334, 50-412 License Nos: DPR-66, NPF-73
Enclosure:
Inspection Plan cc w/encl: Distribution via ListServ
P. Harden determine the status of licensee mitigating strategies programs. On July 12,2011, the NRC's Task Force made its recommendations to the Commission in its report, "Recommendations for Enhancing Reactor Safety in the 21't Century: The Near-Term Task Force Review of lnsights from the Fukushima DaiichiAccident." The NRC is currently reviewing the Task Force's recommendations to determine what additional actions may be warranted.
ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.sov/readinq-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 610-337-5046 with any questions you have regarding this letter.
Sincerely, Eugene M. DiPaolo, Acting Chief Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-334, 50-412 License Nos: DPR-66, NPF-73
Enclosure:
Inspection Plan cc w/encl: Distribution via ListServ Distribution dencl:
W. Dean, RA D. Lew, DRA D. Roberts, DRP J. Clifford. DRP C. Miller, DRS P. Wilson, DRS E. DiPaolo, DRP R. Bellamy, DRP G. Barber. DRP C. Newport, DRP N. Lafferty, DRP A. Dugandzic, DRP J. McHale, RIOEDO D. Werkheiser, DRP, SRI D. Spindler, DRP, SRI E. Bonney, DRP, Rl SUNSI Review Gomplete: CWN (Reviewer's Initials)
ML112420684 DOCUMENT NAME: S:\\ROP-12 MID-CYCLE REVIEMBRANCH 6\\B\\ABV ROP-12 MC COVER LTR.DOCX After declaring this document "An OfficialAgency Record" it will be released to the Public' To receive a copy of this document, indicate in the box: "C" = Copy without attachmenUenclosure "E' = Copy with OFFICE mmt RI/DRP RI/DRP NAME CNewporVCWNf^
EDiPaolo/ aL\\-
DATE 08t30t11 09t01111 J. Brand, DRP, Actg Rl P. Garrett, DRP, OA DRS Branch Chiefs (6)
N. McNamara, Rl, SLO D. Tift, RI, SLO D. Screnci, Rl, PAO N. Sheehan, Rl, PAO R. Barkley, Rl, ORA RidsNrrPMBeaverValleY Resource RidsNrrDorllpl 1 -1 Resource ROPreports Resources RidsNrrDirslpab Resource ROPassessment Resource attachmenVenclosure "N" - No OFFICIAL RECORD COPY
Page 1 of 2 08/30/2011 12:55:06 Report 22 Beaver Valley Inspection I Activity Plan 07t01t2011 - 1213',112012 Planned Dates Start End 1.2 07t1812011 0712212011 2
1,2 1,2 1
1 1,2 1,2 1,2
,l 1,2 1,2 1,2 1,2 a
1,2 1,2 1,2 1,2 1,2 10t1712011 0812912011 o911212011 0311212012 04109120'12 0311212012 03t12t2012 o311212012 04t16t2012 04t2312012 0412312012 0412312012 0412312012 08t2712012 0912412012 07t2912012 06t1812012 0611812012 06t2512012 0712312012 10t21t2011 0910212011 09/16/201 1 0311612012 04113t2012 0311612012 03t16t2012 03t16t2012 04t27t2012 04t27t2012 04t27t2012 04127t2012 04t27t2012 08t31t2012 1010512012 08t02t2012 06t22t2012 06t22t2012 06t29t2012 07t27t2012 71124
- OCC RAD SAFETY. REMP lP 71124.07 Radiological Environmental Monitoring Program 7'111118. BV2 REQUAL INSP W/ P/F RESULTS lP 71111118 Licensed Operator Requalification Program 711528
- Pl&R lP 711528 Problem ldentification and Resolution lP 7'11528 Problem ldentification and Resolution 4/8EXAM - BEAVER VALLEY 1 INITIAL EXAM UO1B46 FY-12 BV1 INITIAL OPERATOR LICENSING EXAM U01846 FY-l2 BV1 INITIAL OPERATOR LICENSING EXAM 71124
. OCC RAD SAFETY lP 7'1124.01 Radiological Hazard Assessment and Exposure Controls lP 71124.02 Occupational ALARA Planning and Controls lP 71124.04 Occupational Dose Assessment 711'I1O8P - INSERVICE INSPECTION lP 7111108P lnservicelnspectionActivities-PWR 71124
. OCC RAD SAFETY lP 71124.01 Radiological Hazard Assessment and Exposure Controls lP 71124.02 Occupational ALARA Planning and Controls lP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation lP 71124,A4 Occupational Dose Assessment 9/24EXM - BV2INITIAL EXAM IjoTeso FY12-BV2INITIAL OPERATOR LICENSING EXAM UO185O FY12.BV2INITIAL OPERATOR LICENSING EXAM 71111118 - BV1 ON-SITE REQUAL INSP W/ P/F RESULTS lP 71111115 Licensed Operator Requalification Program EP EX
- EP EXERCISE EVALUATION lP 7111401 Exercise Evaluation lP 7111404 Emergency Action Level and Emergency Plan Changes 71124
- RW lp 7 1124.0g Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation TRI FI
. TRIENNIAL FIRE PROTECTION INSPECTION tP 7111105P Fire Protection-NFPA 805 Transition Period [Triennial]
Title fhis reoort does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 0813012011 12:55:06 Report 22 Beaver Valley lnspection / Activity Plan a71o1t2011 - 1213112012 Planned Dates Start End 1,2 4t 0810612012 a7t23t2012 09t1012012 1010112012 10t15t2012 1012212012 10t22t2012 1012212012 10t22t2Q12 08t10t2012 0712712012 0911412012 10105t2012 10t19t2012 1012612012 10t2612012 1012612012 10126t2012 tP 71124.01 lP 71124.02 tP 71124.03 tP 71124.Q4 TRI FI
- TRIENNIAL FIRE PROTECTION INSPECTION lP 7111105P Fire Protection-NFPA 805 Transition Period [Triennial]
71',124
- RMS lP 71124.05 Radiation Monitoring Instrumentation T1.177
- MANAGING GAS ACCUMULATION IN ECCS lp ZS1S1177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 7111108P. INSERVICE INSPECTION lP 7111108P InservicelnspectionActivities-PWR lP 7111108P tnseryicelnspectionActivities-PWR 71124
- OCC RAD SAFETY Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls ln-Plant Airborne Radioactivity Control and Mitigation Occupational Dose Assessment z
z 1) 1,2 1,2 1.2 No. of Staff on Site is report does not include INPO and OUTAGE activities This report shows only on-site and announced inspection procedures.