December 13, 2007 Mr. Peter P. Sena III Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, Pennsylvania 15077

SUBJECT:

CHANGE TO THE INSPECTION PLAN FOR THE BEAVER VALLEY POWER STATION

Dear Mr. Sena:

As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.

The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature.

In accordance with 10 CFR 2.390 of the NRCs Rules and Practices a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS).

P. Sena 2

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

Please contact me at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Dr. Ronald R. Bellamy, Chief, Projects Branch 6 Division of Reactor Projects Docket Nos. 50-334 and 50-412 License No. DPR-66 and NPF-73

Enclosures:

Beaver Valley Power Station Inspection/Activity Plans cc w/encl:

J. Hagan, President and Chief Nuclear Officer J. Lash, Senior Vice President of Operations D. Pace, Senior Vice President, Fleet Engineering J. Rinckel, Vice President, Fleet Oversight R. Anderson, Vice President, Nuclear Support, FirstEnergy Nuclear Operating Company D. Jenkins, Attorney, FirstEnergy Corporation G. Halnon, Director, Fleet Regulatory Affairs, FirstEnergy Nuclear Operating Company Manager, Fleet Licensing, FirstEnergy Nuclear Operating Company K. Ostrowski, Director, Site Operations E. Hubley, Director, Maintenance M. Manoleras, Director, Engineering L. Freeland, Director, Site Performance Improvement C. Keller, Manager, Regulatory Compliance M. Clancy, Mayor, Shippingport, PA D. Allard, Director, PADEP C. OClaire, State Liaison to the NRC, State of Ohio Z. Clayton, EPA-DERR, State of Ohio Director, Utilities Department, Public Utilities Commission, State of Ohio D. Hill, Chief, Radiological Health Program, State of West Virginia J. Lewis, Commissioner, Division of Labor, State of West Virginia W. Hill, Beaver County Emergency Management Agency J. Johnsrud, National Energy Committee, Sierra Club J. Powers, Director, PA Office of Homeland Security R. French, Director, PA Emergency Management Agency

P. Sena 2

Distribution w/encl:

S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP R. Bellamy, DRP G. Barber, DRP A. Rosebrook, DRP G. West, RI OEDO J. Lubinski, NRR N. Morgan, NRR, PM R. Guzman, NRR Backup D. Werkheiser, SRI D. Spindler, RI P. Garrett, Resident OA D. Holody, ORA RidsNrrDirslpab@nrc.gov ROPreports@nrc.gov J. Trapp, DRS J. Rogge, DRS M. Sykes, DRS J. White, DRS L. Doerflein, DRS R. Conte, DRS L. Scholl, DRS P. Frechette, DRS D. Silk, DRS D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA SUNSI Review Complete: ___AAR ________ (Reviewers Initials)

DOCUMENT NAME: T:\\DRP\\BRANCH6a\\ROP 8 Letters\\BV ROP Realignment Inspection Plan revisions.doc After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME ARosebrook RBellamy DATE 12/06/07 1212/07 OFFICIAL RECORD COPY

BV Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 1 12/11/2007 14:26:05 Report 22 1

7112101

- OCC RAD SAFETY - ACCESS Baseline Inspections 02/25/2008 02/29/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas 1

7111108P

- U2 INSERVICE INSPECTION Baseline Inspections 04/21/2008 04/25/2008 2

7111108P IP Inservice Inspection Activities - PWR Baseline Inspections 05/05/2008 05/09/2008 2

7111108P IP Inservice Inspection Activities - PWR 1

7112102

- OCC RAD SAFETY - ALARA Baseline Inspections 04/28/2008 05/02/2008 1, 2 7112102 IP ALARA Planning and Controls 3

7111111B

- L.O. REQUAL.PROG.(FOCUS U1)+P/F RVW Baseline Inspections 08/04/2008 08/08/2008 1, 2 7111111B IP Licensed Operator Requalification Program 1

7112202

- PUB RAD SAFETY - RADWASTE Baseline Inspections 06/16/2008 06/20/2008 1, 2 7112202 IP Radioactive Material Processing and Transportation 4

EP

- EP EXERCISE EVALUATION EP Baseline Inspectio 06/23/2008 06/27/2008 1, 2 7111401 IP Exercise Evaluation EP Baseline Inspectio 06/23/2008 06/27/2008 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 06/23/2008 06/27/2008 1, 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 06/23/2008 06/27/2008 1, 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 06/23/2008 06/27/2008 1, 2 71151-EP03 IP Alert & Notification System 4

12/8 EXM

- U2 INITIAL OPERATOR LICENSING EXAMS Not Applicable 11/09/2008 11/13/2008 2

U01628 BEAVER VALLEY UNIT 2 INITIAL EXAM (FY09)

Not Applicable 12/07/2008 12/18/2008 2

U01628 BEAVER VALLEY UNIT 2 INITIAL EXAM (FY09) 1 7112103

- OCC RAD SAFETY - INSTRUMENTS Baseline Inspections 08/25/2008 08/29/2008 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 9

7111121

- CDBI Baseline Inspections 09/15/2008 09/19/2008 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 09/29/2008 10/03/2008 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 10/06/2008 10/10/2008 1, 2 7111121 IP Component Design Bases Inspection This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.