ROP 8 - Beaver Valley - Change to Inspection Plan, 12/13/07
ML073470697
Person / Time
Site: Beaver Valley
Issue date: 12/13/2007
From: Bellamy R
NRC/RGN-I/DRP/PB6
To: Sena P
FirstEnergy Nuclear Operating Co
BELLAMY RR
References
Download: ML073470697 (4)


Text

December 13, 2007 Mr. Peter P. Sena III Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, Pennsylvania 15077

SUBJECT:

CHANGE TO THE INSPECTION PLAN FOR THE BEAVER VALLEY POWER STATION

Dear Mr. Sena:

As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.

The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature.

In accordance with 10 CFR 2.390 of the NRCs Rules and Practices a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS).

P. Sena 2 ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

Please contact me at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Dr. Ronald R. Bellamy, Chief, Projects Branch 6 Division of Reactor Projects Docket Nos. 50-334 and 50-412 License No. DPR-66 and NPF-73

Enclosures:

Beaver Valley Power Station Inspection/Activity Plans cc w/encl:

J. Hagan, President and Chief Nuclear Officer J. Lash, Senior Vice President of Operations D. Pace, Senior Vice President, Fleet Engineering J. Rinckel, Vice President, Fleet Oversight R. Anderson, Vice President, Nuclear Support, FirstEnergy Nuclear Operating Company D. Jenkins, Attorney, FirstEnergy Corporation G. Halnon, Director, Fleet Regulatory Affairs, FirstEnergy Nuclear Operating Company Manager, Fleet Licensing, FirstEnergy Nuclear Operating Company K. Ostrowski, Director, Site Operations E. Hubley, Director, Maintenance M. Manoleras, Director, Engineering L. Freeland, Director, Site Performance Improvement C. Keller, Manager, Regulatory Compliance M. Clancy, Mayor, Shippingport, PA D. Allard, Director, PADEP C. OClaire, State Liaison to the NRC, State of Ohio Z. Clayton, EPA-DERR, State of Ohio Director, Utilities Department, Public Utilities Commission, State of Ohio D. Hill, Chief, Radiological Health Program, State of West Virginia J. Lewis, Commissioner, Division of Labor, State of West Virginia W. Hill, Beaver County Emergency Management Agency J. Johnsrud, National Energy Committee, Sierra Club J. Powers, Director, PA Office of Homeland Security R. French, Director, PA Emergency Management Agency

P. Sena 2 Distribution w/encl: RidsNrrDirslpab@nrc.gov S. Collins, RA ROPreports@nrc.gov M. Dapas, DRA J. Trapp, DRS D. Lew, DRP J. Rogge, DRS J. Clifford, DRP M. Sykes, DRS R. Bellamy, DRP J. White, DRS G. Barber, DRP L. Doerflein, DRS A. Rosebrook, DRP R. Conte, DRS G. West, RI OEDO L. Scholl, DRS J. Lubinski, NRR P. Frechette, DRS N. Morgan, NRR, PM D. Silk, DRS R. Guzman, NRR Backup D. Screnci, PAO D. Werkheiser, SRI N. Sheehan, PAO D. Spindler, RI R. Barkley, ORA P. Garrett, Resident OA D. Holody, ORA SUNSI Review Complete: ___AAR ________ (Reviewers Initials)

DOCUMENT NAME: T:\DRP\BRANCH6a\ROP 8 Letters\BV ROP Realignment Inspection Plan revisions.doc After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME ARosebrook RBellamy DATE 12/06/07 1212/07 OFFICIAL RECORD COPY

Page 1 of 1 BV 12/11/2007 14:26:05 Inspection / Activity Plan Report 22 01/01/2008 - 12/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7112101 - OCC RAD SAFETY - ACCESS 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 02/25/2008 02/29/2008 Baseline Inspections 7111108P - U2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 04/21/2008 04/25/2008 Baseline Inspections 2 IP 7111108P Inservice Inspection Activities - PWR 05/05/2008 05/09/2008 Baseline Inspections 7112102 - OCC RAD SAFETY - ALARA 1 1, 2 IP 7112102 ALARA Planning and Controls 04/28/2008 05/02/2008 Baseline Inspections 7111111B - L.O. REQUAL.PROG.(FOCUS U1)+P/F RVW 3 1, 2 IP 7111111B Licensed Operator Requalification Program 08/04/2008 08/08/2008 Baseline Inspections 7112202 - PUB RAD SAFETY - RADWASTE 1 1, 2 IP 7112202 Radioactive Material Processing and Transportation 06/16/2008 06/20/2008 Baseline Inspections EP - EP EXERCISE EVALUATION 4 1, 2 IP 7111401 Exercise Evaluation 06/23/2008 06/27/2008 EP Baseline Inspectio 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 06/23/2008 06/27/2008 EP Baseline Inspectio 1, 2 IP 71151-EP01 Drill/Exercise Performance 06/23/2008 06/27/2008 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 06/23/2008 06/27/2008 Baseline Inspections 1, 2 IP 71151-EP03 Alert & Notification System 06/23/2008 06/27/2008 Baseline Inspections 12/8 EXM - U2 INITIAL OPERATOR LICENSING EXAMS 4 2 U01628 BEAVER VALLEY UNIT 2 INITIAL EXAM (FY09) 11/09/2008 11/13/2008 Not Applicable 2 U01628 BEAVER VALLEY UNIT 2 INITIAL EXAM (FY09) 12/07/2008 12/18/2008 Not Applicable 7112103 - OCC RAD SAFETY - INSTRUMENTS 1 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/25/2008 08/29/2008 Baseline Inspections 7111121 - CDBI 9 1, 2 IP 7111121 Component Design Bases Inspection 09/15/2008 09/19/2008 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 09/29/2008 10/03/2008 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 10/06/2008 10/10/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.