IR 05000334/2023006
| ML24053A150 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 02/28/2024 |
| From: | Matt Young Division of Operating Reactors |
| To: | Blair B Energy Harbor Nuclear Corp |
| References | |
| IR 2023006 | |
| Download: ML24053A150 (1) | |
Text
February 28, 2024
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION, UNITS 1 AND 2 (REPORTS 05000334/2023006 AND 05000412/2023006)
Dear Barry Blair:
The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Beaver Valley Power Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2023, through December 31, 2023. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.
The NRC determined the performance at Beaver Valley Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31,2025. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues.Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised.The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
As noted in the attached inspection plan, in addition to baseline inspections, the NRC will conduct a License Renewal Phase 4 inspection at Beaver Valley Unit 1, under Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (610) 337-5205 with any questions you have regarding this letter.
Sincerely, Matt R. Young, Chief Projects Branch 2 Division of Operating Reactor Safety Docket Nos. 05000334 and 05000412 License Nos. DPR-66 and NPF-73 Enclosure:
As stated cc w/ encl: Distribution via LISTSERV Matthew R.
Young Digitally signed by Matthew R. Young Date: 2024.02.28 06:50:47 -05'00'
SUNSI Review
X Non-Sensitive Sensitive
X Publicly Available
Non-Publicly Available
OFFICE RI/DORS RI/DORS
NAME NWarnek MYoung
DATE 2/22/2024 2/22/2024
Site Inspection Activity Plan Beaver Valley 01/01/2024 - 12/31/2025 Unit Start End Activity CAC Title Staff Count BV1 Requal Insp with P/F Results
1 3/10/2024 3/15/2024 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance
3/10/2024 3/15/2024 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Material Control and Accounting-Beaver Valley
1,2 3/18/2024 3/22/2024 IP 71130.11 000742 Material Control and Accounting (MC&A)
Inservice Inspection - Beaver Valley Unit 1
1 4/22/2024 5/3/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
1 4/22/2024 4/26/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls RP - 71124.05 Radiation Instrumentation
1,2 5/20/2024 5/24/2024 IP 71124.05 000729 Radiation Monitoring Instrumentation EP Exercise Inspection - Beaver Valley
1,2 6/10/2024 6/14/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 6/10/2024 6/14/2024 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event 1,2 6/10/2024 6/14/2024 IP 71151 001397 Performance Indicator Verification Comprehensive Engineering Team Inspection - Beaver Valley
1,2 7/15/2024 7/19/2024 IP 71111.21M 000713 Comprehensive Engineering Team Inspection 1,2 7/29/2024 8/2/2024 IP 71111.21M 000713 Comprehensive Engineering Team Inspection Access Control, Protective Strategy, TSR, SPR
1,2 8/5/2024 8/9/2024 IP 71130.02 000734 Access Control 1,2 8/5/2024 8/9/2024 IP 71130.05 000737 Protective Strategy Evaluation 1,2 8/5/2024 8/9/2024 IP 71130.09 001656 Security Plan Changes 1,2 8/5/2024 8/9/2024 IP 71130.14 000743 Review of Power Reactor Target Sets 1,2 8/5/2024 8/9/2024 IP 71151 001338 Performance Indicator Verification License Renewal Phase 4 - Beaver Valley Unit 1
1 9/9/2024 9/13/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal RP - 71124.08 Rad Waste
1,2 9/16/2024 9/20/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 2024 BV2 Initial Operator Licensing Exam
2 8/26/2024 8/30/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
10/7/2024 10/11/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
Prepared on 2/21/2024 2:11:49 PM 1 of 3
Site Inspection Activity Plan Inservice Inspection - Beaver Valley Unit 2
2 10/21/2024 11/1/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
1,2 11/12/2024 11/15/2024 IP 71151 000746 Performance Indicator Verification RP Airborne 71124.03 and Dose Assessment 71124.04
1,2 1/26/2025 1/31/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 1/26/2025 1/31/2025 IP 71124.04 000728 Occupational Dose Assessment Fire Protection - Beaver Valley
1,2 3/3/2025 3/7/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
1,2 3/17/2025 3/21/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
1,2 3/3/2025 3/7/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment Access Control, Maintenance, Sec Trng, SPR, PIs - BV
1,2 4/14/2025 4/18/2025 IP 71130.02 000734 Access Control 1,2 4/14/2025 4/18/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 4/14/2025 4/18/2025 IP 71130.07 000739 Security Training 1,2 4/14/2025 4/18/2025 IP 71130.09 001656 Security Plan Changes 1,2 4/14/2025 4/18/2025 IP 71151 001338 Performance Indicator Verification PI&R Biennial Team Inspection - Beaver Valley
1,2 4/28/2025 5/2/2025 IP 71152B 000747 Problem Identification and Resolution 1,2 5/12/2025 5/16/2025 IP 71152B 000747 Problem Identification and Resolution RP REMP 71124.07
1,2 5/19/2025 5/23/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program EP Program Inspection - Beaver Valley
1,2 6/9/2025 6/13/2025 IP 71114.02 000717 Alert and Notification System Testing 1,2 6/9/2025 6/13/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 6/9/2025 6/13/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 6/9/2025 6/13/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 6/9/2025 6/13/2025 IP 71151 001397 Performance Indicator Verification BV2 Requal Inspection with P/F Results
2 7/21/2025 7/25/2025 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance
7/21/2025 7/25/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance RP Rad Instrumentation 71124.05
1,2 8/3/2025 8/8/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - BV
Prepared on 2/21/2024 2:11:49 PM 2 of 3
Site Inspection Activity Plan 1,2 8/4/2025 8/8/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1,2 8/25/2025 8/29/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Cyber Security - Beaver Valley
1,2 8/18/2025 8/22/2025 IP 71130.10 000741 Cybersecurity 2025 BV1 Initial Operator Licensing Exam
1 9/8/2025 9/12/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
10/6/2025 10/10/2025 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
RP Rad Hazard Assessment and Exposure Control 71124.01
1,2 10/19/2025 10/24/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Inservice Inspection - Beaver Valley Unit 1
1 10/20/2025 10/31/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
1,2 12/8/2025 12/12/2025 IP 71130.01 000733 Access Authorization 1,2 12/8/2025 12/12/2025 IP 71130.08 000740 Fitness-For-Duty Program RP PI Verification 71151
1,2 12/15/2025 12/19/2025 IP 71151 000746 Performance Indicator Verification Prepared on 2/21/2024 2:11:49 PM 3 of 3