Beaver Valley Power Station NRC Evaluated Emergency Preparedness Exercise Inspection Report 05000334 and 05000412 2014-502
ML14211A045
Person / Time
Site: Beaver Valley
Issue date: 07/29/2014
From: Barr S, Anthony Dimitriadis
Plant Support Branch 1
To: Emily Larson
FirstEnergy Nuclear Operating Co
Dimitriadis A
References
IR-14-502
Download: ML14211A045 (11)


Text

Mr. Eric Larson, Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station P. O. Box 4, Route 168 Shippingport, PA 15077

SUBJECT: BEAVER VALLEY POWER STATION: NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE INSPECTION REPORT 05000334/2014502 AND 05000412/2014502

Dear Mr. Larson:

On June 20, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the June 17, 2014, evaluated emergency preparedness exercise at your Beaver Valley Power Station, Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on June 19, 2014, with you and other members of your staff. The inspection examined activities conducted under your licenses as they relate to safety and licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. The NRC inspectors did not identify any findings or violations of more than minor significance. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) componeccess and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety July 29, 2014 Mr. Eric Larson, Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station P. O. Box 4, Route 168 Shippingport, PA 15077

SUBJECT: BEAVER VALLEY POWER STATION: NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE INSPECTION REPORT 05000334/2014502 AND 05000412/2014502

Dear Mr. Larson:

On June 20, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the June 17, 2014, evaluated emergency preparedness exercise at your Beaver Valley Power Station, Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on June 19, 2014, with you and other members of your staff. The inspection examined activities conducted under your licenses as they relate to safety and licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. The NRC inspectors did not identify any findings or violations of more than minor significance. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) componeSystem (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos.: 50-334, 50-412 License Nos.: DPR-66, NPF-73 Distribution: See Next Page DOCUMENT NAME: G:\DRS\Plant Support Branch 1\Barr\EP Ex14 Beaver Valley\Beaver Valley EP EX 2014 Report.docx ADAMS Accession No.: ML14211A045 SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS RI/DRP RI/DRS NAME SBarr/SB SKennedy/SK ADimitriadis/AD DATE 07/28/2014 07/28/2014 07/29/2014 OFFICIAL RECORD COPY

Enclosure:

NRC Inspection Report Nos. 05000334/2014502 and 05000412/2014502

w/Attachment:

Supplementary Information cc w/encl: Distribution via ListServ J. Price, RAC Chair, Acting, FEMA Region III G. Cannon, Director, PA Emergency Management Agency (PEMA) and Office of Homeland Security Advisor Distribution w/encl: (via E-mail) W. Dean, RA (R1ORAMAIL Resource) D. Lew, DRA (R1ORAMAIL Resource) H. Nieh, DRP (R1DRPMAIL Resource) M. Scott, DRP (R1DRPMAIL Resource) J. Trapp, DRS (R1DRSMAIL Resource) P. Krohn (R1DRSMAIL Resource) S. Kennedy, DRP L. Cline, DRP G. Stock, DRP C. Roettgen, DRP J. Krafty, DRP, SRI E. Andrews, DRP, RI P. Garrett, DRP, AA A. Bowers, RI OEDO RidsNrrPMBeaverValley Resource RidsNrrDorlLpl1-2 Resource ROPreports Resource A. Dimitriadis, DRS S. Barr, DRS R. Kahler, NSIR/EPD S. LaVie, NSIR/EPD i Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION I Docket Nos.: 50-334, 50-412 License Nos.: DPR-66, NPF-73 Report No.: 05000334/2014502 and 05000412/2014502 Licensee: FirstEnergy Nuclear Operating Company (FENOC) Facility: Beaver Valley Power Station, Units 1 and 2 Location: Shippingport, PA 15077 Dates: June 16-20, 2014 Inspectors: S. Barr, Senior Emergency Preparedness Inspector, Division of Reactor Safety (DRS), Region I (Lead) E. Burket, Emergency Preparedness Inspector, DRS, Region I B. Fuller, Senior Operations Inspector, DRS, Region I T. Hedigan, Operations Inspector, DRS, Region I J. Nance, Senior Resident Inspector (Acting), Beaver Valley J. Laughlin, Emergency Preparedness Specialist, NSIR Approved By: Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety ii Enclosure

SUMMARY OF FINDINGS

IR 05000334/2014502, 05000412/2014502; 06/16/2014 06/20/2014; Beaver Valley Power Station, Units 1 and 2; Exercise Evaluation Hostile Action (HA) Event; Exercise Evaluation Scenario Review; Performance Indicator Verification. This report covers an announced inspection conducted by four Region I-based inspectors, one Headquarters-based inspector, and one resident inspector. No findings were identified during the inspection. The nuclear power reactors is described in NUREG-5.

Cornerstone: Emergency Preparedness

No findings were identified.

REPORT DETAILS

REACTOR SAFETY

Cornerstone:

Emergency Preparedness (EP) 1EP7 Exercise Evaluation Hostile Action Event (71114.07 1 Sample)

a. Inspection Scope

Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix E,Section IV.F.2.j, requires in part that nuclear power reactor licensees, in each eight calendar year exercise cycle, provide the opportunity for their emergency response organization (ERO) to demonstrate proficiency in the key skills necessary to respond to a hostile action (HA) directed at the plant site. FirstEnergy Nuclear Operating Company (FENOC) designed the June 17, 2014, Beaver Valley EP exercise to satisfy that requirement, and the U.S. Nuclear Regulatory Commission (NRC) inspected the Beaver Valley HA event exercise to assess FENOC ability to effectively implement the Beaver Valley Emergency Plan during an HA event. This overall exercise inspection activity represented the completion of one sample on a biennial cycle. The exercise evaluation consisted of the following review and assessment: The adequacy of the FENOC Beaver Valley EROs performance in the biennial full-participation exercise regarding the implementation of the planning standards described in 10 CFR 50.47(b) (4), (5), (9), and (10), which are: emergency classification; offsite notification; radiological assessment; onsite protective actions, and public protective action recommendations, respectively.

The overall adequacy of FENOC emergency response facilities with regard to Emergency Plan commitments. The facilities assessed were the Control Room Simulator, the Alternative Facility (AF), the Central Alarm Station (CAS), the local law enforcement Incident Command Post (ICP), and the Emergency Operations Facility (EOF).

A review of other performance areas, such as the FENOC ERO: recognition of abnormal plant conditions; command and control, including interactions with site security staff; intra- and inter-facility communications; prioritization of mitigating activities; utilization of repair and field monitoring teams; interface with offsite agencies, including local law enforcement agencies; staffing and procedure adequacy; and the overall implementation of the Beaver Valley Emergency Plan and their implementing procedures.

A review of past performance issues from the last NRC Beaver Valley exercise inspection report and recent FENOC Beaver Valley EP drill reports, to determine the effectiveness of licensee corrective actions as demonstrated during the June 17, 2014, exercise and to ensure compliance with 10 CFR 50.47(b)(14).

-exercise critiques, to evaluate FENOC self-assessment of its Beaver Valley ERO performance during the June 17, 2014, exercise and to ensure compliance with 10 CFR Part 50, Appendix E, Section IV.F.2.g. The inspectors reviewed the documents listed in the attachment to this report.

b. Findings

No findings were identified. 1EP8 Exercise Evaluation Scenario Review (71114.08 1 Sample)

a. Inspection Scope

Prior to the June 17, 2014, EP exercise, the NRC inspectors conducted an in-office review of the exercise objectives and scenario, which FENOC had submitted to the NRC, to determine if the exercise would test major elements of the Beaver Valley Emergency Plan as required by 10 CFR 50.47(b)(14). This overall exercise inspection activity represented the completion of one sample on a biennial cycle. The inspectors reviewed the documents listed in the attachment to this report.

b. Findings

No findings were identified.

OTHER ACTIVITIES (OA)

4OA1 Performance Indicator Verification (71151

3 Samples)

a. Inspection Scope

The inspectors reviewed data for the Beaver Valley EP Performance Indicators (PI), which are: (1) Drill and Exercise Performance (DEP) (EP01); (2) ERO Drill Participation (EP02); and (3) Alert and Notification System (ANS) Reliability (EP03). The last NRC EP PI inspection at Beaver Valley was conducted in the third calendar quarter of 2013, so the inspectors reviewed supporting documentation from EP drills and tests from the third calendar quarter of 2013 through the first calendar quarter of 2014, to verify the accuracy of the reported PI data. The review of these PIs was conducted in accordance with NRC Inspection Procedure 71151, using the acceptance criteria documented in NEI 99-. This inspection activity represented the completion of three samples.

b. Findings

No findings were identified.

4OA6 Meetings, including Exit

On June 19, 2014, the inspectors presented the results of this inspection to Mr. E. Larson, Site Vice President, and other members of the FENOC staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report.

ATTACHMENT

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

E. Larson, Site Vice President
S. Sawtschenko, Emergency Preparedness Manager

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

None.

LIST OF DOCUMENTS REVIEWED

Section 1EP7: Exercise Evaluation

Hostile Action (HA) Event

Miscellaneous

Beaver Valley Power Station Emergency Preparedness Plan, Revision 30 Emergency Preparedness Plan Implementing Procedures, Table of Contents Revision 155 Beaver Valley Power Station 2014 Evaluated Exercise Scenario Package Condition Reports documented in the Beaver Valley Power Station June 17, 2014, Evaluated Exercise Report, dated July 16, 2014

Section 1EP8: Exercise Evaluation

Scenario Review

Miscellaneous

Beaver Valley Power Station Emergency Preparedness Plan, Revision 30 Beaver Valley Power Station 2014 Evaluated Exercise Scenario Package 1/2-EPP-IP-7.2, Administration of Emergency Preparedness Plan, Drills and Exercises, Revision 3

Section 4OA1: Performance Indicator (PI) Verification

Miscellaneous

1/2-ADM-1111, NRC EPP Performance Indicator Instructions, Revision 9 DEP PI data, July 2013
March 2014 ERO Drill Participation PI data, July 2013
March 2014 ANS Reliability PI data, July 2013
March 2014
Attachment

LIST OF ACRONYMS

ADAMS Agencywide Documents Access and Management System
AF Alternative Facility
ANS Alert Notification System
CAS Central Alarm Station
CFR Code of Federal Regulations
DEP Drill and Exercise Performance
EOF Emergency Operations Facility
EP Emergency Preparedness
EPP Emergency Preparedness Plan
ERO Emergency Response Organization
FENOC First Energy Nuclear Operating Company
HA Hostile Action
ICP Incident Command Post
NEI Nuclear Energy Institute
NRC Nuclear Regulatory Commission
PAR Protective Action Recommendation
PI Performance Indicator
RSPS Risk Significant Planning Standard