UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 September 1. 2010 Mr. Paul Harden Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P. O. Box 4 Shippingport, PA 15077

SUBJECT:

MID CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN BEAVER VALLEY UNITS 1 AND 2

Dear Mr. Harden:

On August 11, 2010, the NRC staff completed its performance review of Beaver Valley Units 1 and 2 for the first half of calendar year 2010 assessment cycle. Our technical staff reviewed performance indicators (Pis) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter of 2010 at Beaver Valley Units 1 and 2 was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all Pis indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuolls nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice,n a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).

P. Harden 2 As you may know, the NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible.

Please contact me at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

~~.\I~

Ronald R. Bellamy, Ph.D., Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-334,50-412 License Nos: DPR-66, NPF-73

Enclosure:

Beaver Valley Units 1 and 2 Inspection/Activity Plan cc w/enels: Distribution via ListServ I

P. Harden 2 As you may know, the NRC is currently evaluating the scope and frequency of aU the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible.

Please contact me at 61 0~337 -5200 with any questions you may have regarding this leHer or the inspection plan.

Sincerely, Ronald R Bellamy, Ph.D., Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-334,50-412 License Nos: DPR-66, NPF-73

Enclosure:

Beaver Valley Units 1 and 2 Inspection/Activity Plan cc w/encls: Distribution via ListServ Distribution w/encl:

M. Dapas, Acting RA N. McNamara, SLO D. Lew, Acting DRA D. Tifft, SLO J. Clifford, ORP D. Screnci, PAD R. Bellamy, DRP N. Sheehan, PAO G. Barber, DRP R. Barkley, ORA C.Newport,DRP John Thompson, NRR L Trocine, RI OEDO RidsNrrDirslpab@nrc.gov D. Werkheiser. SRI, ORP RidsNrrPMBeaver Valley Resource E. Bonney, RI, ORP RidsNrr OorlLpl1-1 Resource P. Garrett, OA. DRP ROPreportsResources@nrc.gov DRS Director DRS Deputy Director DRS Branch Chiefs (6)

SUNSI Review Complete: RRB (Reviewer's Initials) ML102440639 DOCUMENT NAME: S:\ROP-11 Mrd-Cycle Review\Branch 6\Bv\BV ROP-11 MC Cover Ltr.Doc After declaring this document "An Official Agency Record" it will be released to the Public.

To receive a OOfPJ of this document, Indicate in tlla box; "C* K Copy without attachmen!!encloS'Jre "E" = Copy wilh attachment/enclosure "N": No copy RJlDRP SBarberl RRB for 08/24/10 OFFICIAL RECORD COPY

Page 1 of2 '.,' , ,,Beaver Valley 08/30/2010 14:45:15 Inspection I Activity Plan Report 22 07/01/2010

  • 12/31/2011 Planned Dates Start End Title 08f16EXM
  • U2 INITIAL OPERATOR LICENSING EXAM 4 07/12/2010 07/16/2010 U01821 FY*10 BEAVER VALLEY UNIT 2 INITIAL OPERATOR LICENSING EXAM 08/1612010 08/20f2010 U01821 FY-10 BEAVER VAllEY UNIT 2 INITIAL OPERATOR LICENSING EXAM 71124 - PUB RAD SAFETY - RADWASTE 1 1.2 06/28/2010 07/02f2010 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling. Storage. and Transportation TI179 - 25151T1179 NSTS VERIFICATION 1 1.2 06128/2010 01102/2010 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 71124 - OCC RAD SAFETY
  • OCC RAD SAFETY 1 1 1011712010 10/22/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/17/2010 10/22/2010 IP 71124.02 Occupational ALARA Planning and Controls 10/17/2010 10/2212010 IP 71124.04 Occupational Dose Assessment 1.2 10/17/2010 10/2212010 IP 71151 Performance Indicator Verification 71124 - OCC RAD SAFETY 1 1.2 02/1412011 0211812011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1,2 02/14/2011 02/1S/2011 IP 71124.02 Occupational ALARA Planning and Controls 7111108P - U2 INSERVICE INSPECTION 1 2 03/14/2011 03/25/2011 IP 7111108P Inservice Inspection Activities - PWR 71124 -oce RAD SAFETY 1,2 03121/2011 03/2512011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1,2 03/21/2011 03/25/2011 IP 71124.02 Occupational ALARA Planning and Controls 1,2 03/21/2011 03/25/2011 IP 71124.04 Occupational Dose Assessment 711111B - BV2 REQUAL lNSP WI P/F RESULTS 3 1.2 06127/2011 07/01/2011 IP 7111111B L1censed Operator Requaiification Program EP PROGR
  • EP PROGRAM INSPECTION 1 1.2 05/16/2011 05/2012011 IP 7111402 Alert and Notification System Testing 1.2 05/16/2011 05/20/2011 lP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1.2 05/16/2011 05/20/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 1.2 05/1612011 05/20/2011 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1,2 05/16/2011 05/20/2011 IP 71151-EP01 Drill/Exercise Performance his report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of2 Beaver Valley 08/30/2010 14:45:15 Inspection I Activity Plan Report 22 07/01/2010 - 12/31/2011 Planned Dates Start End Title EP PROGR - EP PROGRAM INSPECTION 1.2 05/16/2011 05/20/2011 IP 71151-EP02 ERO Drill Participation 1.2 05/16/2011 05/20/2011 IP 71151-EP03 Alert & Notification System 7111121 - COBI 6 1.2 05/23/2011 05/28/2011 IP 7111121 Component Design Bases Inspection 1.2 0610612011 06/10/2011 IP 7111121 Component Design Bases Inspection 1.2 06/1312011 06/17/2011 IP 7111121 Component Design Bases Inspection 71124 - EFFLUENTS 1.2 06120/2011 06/2412011 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 71124 - OCC RAO SAFETY - REMP 1 1.2 07/18/2011 07/2212011 IP 71124.07 Radiological Environmental Monitoring Program TI-177 - MANAGING GAS ACCUMULATION IN ECCS 3 1.2 07118/2011 07/22/2011 IP 25151177 Managing Gas Accumulation In Emergency Core Cooling. Decay Heat Removal & Containment Spray System 71152B - PI&R 4 08/29/2011 09/02/2011 IP 711528 Identification and Resolution of Problems 1.2 09/12/2011 0911612011 IP 71152B Identification and Resolution of Problems his report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.