Response to Request for Additional Information Regarding Spring 2023 180-Day Steam Generator Tube Inspection Report
ML24101A275
Person / Time
Site: Beaver Valley
Issue date: 04/10/2024
From: Blair B
Vistra Operations Company
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML24101A274 List:
References
EPID L-2024-LRO-0006, L-24-055
Download: ML24101A275 (1)


Text

L-24-055 April 10, 2024 A TIN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 Beaver Valley Power Station Barry N. Blair Site Vice President P.O. Box 4 200 State Route 3016 Shippingport, PA 15077 724.682.5234 Response to Request for Additional Information Regarding Spring 2023 180-Day Steam Generator Tube Inspection Report (EPID: L-2024-LRO-0006)

By letter dated October 31, 2023 (Accession No. ML23305A095), Energy Harbor Nuclear Corp. submitted information summarizing the results of the steam generator (SG) inspections performed at Beaver Valley Power Station (BVPS), Unit No. 2, during the spring 2023 refueling outage (2R23). By email dated February 14, 2024, the Nuclear Regulatory Commission (NRC) staff requested additional information to complete its review of the report.

Effective March 1, 2024, the facility operating license for BVPS was transferred from Energy Harbor Nuclear Generation LLC (owner) and Energy Harbor Nuclear Corp. (operator) to Energy Harbor Nuclear Generation LLC (owner) and Vistra Operations Company LLC (operator) (Accession No ML24057A092). Upon completion of this license transfer, Vistra Operations Company LLC (VistraOps) assumed the responsibility for all licensing actions under NRC review at the time of the transfer and requested that the NRC continue its review of these actions (Accession No ML24054A498). The VistraOps response to the NRC request is attached.

There are no regulatory commitments contained in this submittal. If there are any questions, or if additional information is required, please contact Mr. Jack Hicks, Senior Manager, Licensing, at (254) 897-6725 or jack.hicks@luminant.com.

Sincerely, Barry N. Blair

Beaver Valley Power Station, Unit No. 2 L-24-055 Page2

Enclosures:

A.Westinghouse Affidavit B.Non-Proprietary Response to Request for Additional Information (Public)

C.Proprietary Response to Request for Additional Information (Non-Public) cc: NRC Region I Administrator NRC Resident Inspector NRC Project Manager Director BRP /DEP Site BRP /DEP Representative