UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 31, 2006 Mr. James H. Lash Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, Pennsylvania 15077
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - BEAVER VALLEY POWER STATION UNITS 1 AND 2
Dear Mr. Lash:
On August 9, 2006, the NRC staff completed its performance review of Beaver Valley Power Station Units 1 and 2 (Beaver Valley) for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in accordance with 10 CFR 2.390" will include the physical protection review and resultant inspection plan.
Plant performance for the most recent quarter at Beaver Valley Units 1 and 2 was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct the standard reactor oversight process (ROP) baseline inspections at your facility. In addition to the baseline inspection procedures, inspections related to the Extended Power Uprate for Units 1 and 2 and inspections related to the Unit 2 Containment Sump Modifications will be performed.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules and Practices, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs
J. H. Lash 2
document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Ronald R. Bellamy, Chief Reactor Projects Branch 7 Division of Reactor Projects Docket Nos. 50-334, 50-412 License Nos. DPR-66, NPF-73
Enclosure:
Beaver Valley Power Station, Units 1 and 2 Inspection/ Activity Plan cc w/encl:
G. Leidich, President and Chief Nuclear Officer J. Hagan, Senior Vice President of Operations and Chief Operating Officer D. Pace, Senior Vice President, Fleet Engineering J. Rinckel, Vice President, Fleet Oversight L. Myers, Executive Vice President, Special Projects R. Anderson, Vice President, FirstEnergy Nuclear Operating Company Manager, Fleet Licensing, FirstEnergy Nuclear Operating Company R. Mende, Director, Site Operations T. Cosgrove, Director, Maintenance P. Sena, Director, Engineering L. Freeland, Director, Site Performance Improvement and Manager, Regulatory Compliance D. Jenkins, Attorney, FENOC B. Sepelak, Supervisor, Nuclear Compliance M. Clancy, Mayor, Shippingport, PA D. Allard, PADEP C. OClaire, State Liaison to the NRC, State of Ohio Z. Clayton, EPA-DERR, State of Ohio Director, Utilities Department, Public Utilities Commission, State of Ohio D. Hill, Chief, Radiological Health Program, State of West Virginia J. Lewis, Commissioner, Division of Labor, State of West Virginia W. Hill, Beaver County Emergency Management Agency J. Johnsrud, National Energy Committee, Sierra Club
J. H. Lash 3
Distribution w/encl:
S. Collins, RA M. Dapas, DRA B. Holian, DRP D. Lew, DRP R. Bellamy, DRP R. Fuhrmeister, DRP A. Rosebrook, DRP B. Sosa, RI OEDO R. Laufer, NRR T. Colburn, PM, NRR R. Guzman, NRR P. Cataldo - Senior Resident Inspector P. Garrett - Resident OA DRS Director, Region I DRS Deputy Director, Region I DRS Branch Chiefs (6)
Region I Docket Room (with concurrences)
RidsNrrDipmIipb@nrc.gov Institute of Nuclear Power Operations (INPO)
SISP Review Complete: _______RRB____ (Reviewers Initials)
DOCUMENT NAME: S:\\ROP 7 Mid Cycle Review\\2006 ROP7 Mid-Cycle Letters\\BV 2006 Mid-Cycle Letter.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME ARosebrook/AAR RBellamy/RRB DATE 7/31/2006 8/29/2006 OFFICIAL RECORD COPY
Beaver Valley Inspection / Activity Plan 07/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/31/2006 09:31:36 Report 22 4
7111111B
- L.O. REQUAL PROG.(FOCUS U1)+P/F RSLT Baseline Inspections 07/31/2006 08/03/2006 1, 2 7111111B IP Licensed Operator Requalification Program 8
7111121
- CDBI (COMPONENT DESIGN BASES INSPECTION)
Baseline Inspections 07/10/2006 07/14/2006 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 07/17/2006 07/20/2006 1, 2 7111121 IP Component Design Bases Inspection 2
7111112B
- MAINTENANCE RULE Baseline Inspections 09/11/2006 09/15/2006 1, 2 7111112B IP Maintenance Effectiveness 1
7112102
- OCC RAD SAFETY - ALARA Baseline Inspections 10/02/2006 10/06/2006 1, 2 7112102 IP ALARA Planning and Controls 1
7111108P
- UNIT 2 INSERVICE INSPECTION Baseline Inspections 10/10/2006 10/20/2006 2
7111108P IP Inservice Inspection Activities - PWR 1
TI-166
- UNIT 2 CONTAINMENT SUMP MODIFICATIONS Safety Issues 10/23/2006 10/27/2006 2
2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
2 TI-169
- MSPI VERIFICATION Safety Issues 11/01/2006 12/15/2006 1, 2 2515/169 IP Mitigating Systems Performance Index Verification 1
71004
- POWER UPRATE - EC/FAC Other Routine 12/04/2006 12/08/2006 1, 2 71004 IP Power Uprate 1
7112103
- OCC RAD SAFETY - INSTRUMENTS Baseline Inspections 12/11/2006 12/15/2006 1, 2 7112102 IP ALARA Planning and Controls 6
TRI FIRE
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 01/22/2007 01/26/2007 1
7111105T IP Fire Protection [Triennial]
Baseline Inspections 02/05/2007 02/09/2007 1
7111105T IP Fire Protection [Triennial]
1 71114
- EP PRGM INSP Baseline Inspections 02/05/2007 02/09/2007 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 02/05/2007 02/09/2007 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 02/05/2007 02/09/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 02/05/2007 02/09/2007 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 02/05/2007 02/09/2007 1, 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 02/05/2007 02/09/2007 1, 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 02/05/2007 02/09/2007 1, 2 71151-EP03 IP Alert & Notification System 1
7112101
- OCC RAD SAFETY Baseline Inspections 03/05/2007 03/09/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas 4
- PI&R Baseline Inspections 03/26/2007 03/30/2007 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 04/09/2007 04/13/2007 1, 2 71152B IP Identification and Resolution of Problems This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Beaver Valley Inspection / Activity Plan 07/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/31/2006 09:31:36 Report 22 3
7111111B
- LO REQUAL. PROG.(FOCUS U2)+P/F RVW Baseline Inspections 05/28/2007 07/06/2007 1, 2 7111111B IP Licensed Operator Requalification Program 1
7112201
- PUB RAD SAFETY - RETS Baseline Inspections 05/14/2007 05/18/2007 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 4
7111117B
- MODS AND 50.59 Baseline Inspections 06/04/2007 06/08/2007 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 06/04/2007 06/08/2007 1, 2 7111117B IP Permanent Plant Modifications 1
7112203
- PUB RAD SAFETY - REMP Baseline Inspections 07/09/2007 07/13/2007 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 3
11/12EXM
- U1 OPERATOR LICENSING INITIAL EXAM Not Applicable 10/15/2007 10/19/2007 1
U01685 FY08 - BEAVER VALLEY 1 INITIAL OPERATOR EXAM Not Applicable 11/12/2007 11/23/2007 1
U01685 FY08 - BEAVER VALLEY 1 INITIAL OPERATOR EXAM 1
TI-166
- CONTAINMENT SUMP MODIFICATIONS - UNIT 1 Safety Issues 10/15/2007 10/19/2007 1
2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
1 7112102
- OCC RAD SAFETY - ALARA Baseline Inspections 10/29/2007 11/02/2007 1, 2 7112102 IP ALARA Planning and Controls 2
7111107
- HEAT SINK INSP Baseline Inspections 11/05/2007 11/09/2007 1, 2 7111107B IP Heat Sink Performance 6
7111121
- CDBI Baseline Inspections 01/14/2008 01/18/2008 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 01/28/2008 02/01/2008 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 02/04/2008 02/08/2008 1, 2 7111121 IP Component Design Bases Inspection 1
7112101
- OCC RAD SAFETY - ACCESS Baseline Inspections 02/25/2008 02/29/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas 1
7112102
- OCC RAD SAFETY - ALARA Baseline Inspections 03/24/2008 03/28/2008 1, 2 7112102 IP ALARA Planning and Controls This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.