Annual Assessment Letter for Beaver Valley Power Station, Unit Nos. 1 and 2 (Report 05000334/2016006 and 05000412/2016006) with Report 22
ML17058A277
Person / Time
Site: Beaver Valley
Issue date: 03/01/2017
From: Silas Kennedy
NRC/RGN-I/DRP/PB6
To: Richey M
FirstEnergy Nuclear Operating Co
Kennedy S
References
IR 2016006
Download: ML17058A277 (6)


Text

rch 1, 2017

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (REPORT 05000334/2016006 AND 05000412/2016006)

Dear Mr. Richey:

The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Beaver Valley Power Station, Unit Nos. 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016, through December 31, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Beaver Valley Power Station, Unit Nos. 1 and 2, during the most recent quarter was within the Licensee Response Column because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Beaver Valley Power Station, Unit Nos. 1 and 2.

The enclosed inspection plan lists the inspections scheduled through December 31, 2018.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

In addition to normal baseline inspections, the NRC will be performing Inspection Procedure 60855.1, Operation of an ISFSI at Operating Plants and TI-192, Inspection of the Licensees Interim Compensatory Measures Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5046 with any questions you have regarding this letter.

Sincerely,

/RA/

Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects Docket Nos 50-334 and 50-412 License Nos DPR-66 and NPF-73 Enclosure:

Beaver Valley Power Station Inspection/Activity Plan

ML17058A277 SUNSI Non-Sensitive Publicly Available Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME MHenrion/MH SKennedy/SK DATE 2/24/17 2/27/17

Page 1 of 3 Beaver Valley 01/31/2017 08:34:43 Inspection / Activity Plan Report 22 01/01/2017 - 12/31/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - RAD SAFETY INSPECTION 1 1, 2 03/06/2017 03/10/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/06/2017 03/10/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/06/2017 03/10/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/06/2017 03/10/2017 IP 71124.04 Occupational Dose Assessment 71124 - HP INSPECTION 1 1, 2 05/01/2017 05/05/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 05/01/2017 05/05/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 05/01/2017 05/05/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 05/01/2017 05/05/2017 IP 71124.04 Occupational Dose Assessment 7111108P - U2 INSERVICE INSPECTION 1 2 05/01/2017 05/12/2017 IP 7111108P Inservice Inspection Activities - PWR EP - EP PROGRAM INSPECTION 2 1, 2 06/19/2017 06/23/2017 IP 7111402 Alert and Notification System Testing 1, 2 06/19/2017 06/23/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 06/19/2017 06/23/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 06/19/2017 06/23/2017 IP 71151 Performance Indicator Verification 71152B - PI&R BIENNIAL 5 1, 2 06/05/2017 06/09/2017 IP 71152B Problem Identification and Resolution 1, 2 06/19/2017 06/23/2017 IP 71152B Problem Identification and Resolution 10/8EXAM - BEAVER VALLEY 2 INITIAL EXAM 6 2 10/09/2017 10/13/2017 U01938 FY18-BV2 INITIAL OPERATOR LICENSING EXAM 2 11/06/2017 11/17/2017 U01938 FY18-BV2 INITIAL OPERATOR LICENSING EXAM 7111111B - BV2 REQUAL INSP WITH P/F RESULTS 2 2 08/14/2017 08/18/2017 IP 7111111A Licensed Operator Requalification Program - Annual Review 2 08/14/2017 08/18/2017 IP 7111111B Licensed Operator Requalification Program 71124 - HP INSPECTION 1 1, 2 08/07/2017 08/11/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 08/07/2017 08/11/2017 IP 71124.04 Occupational Dose Assessment 1, 2 08/07/2017 08/11/2017 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 08/07/2017 08/11/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences ISFSI - ISFSI LOADING CAMPAIGN INSPECTION 1 1, 2 09/25/2017 09/29/2017 IP 60855 Operation Of An ISFSI This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 3 Beaver Valley 01/31/2017 08:34:43 Inspection / Activity Plan Report 22 01/01/2017 - 12/31/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ISFSI - ISFSI LOADING CAMPAIGN INSPECTION 1 1, 2 09/25/2017 09/29/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 71124 - HP INSPECTION 1 1, 2 10/16/2017 10/20/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/16/2017 10/20/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 10/16/2017 10/20/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 10/16/2017 10/20/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 10/16/2017 10/20/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 7111121M - DESIGN BASES ASSURANCE INSPECTION 6 1, 2 10/30/2017 11/03/2017 IP 7111121M Component Design Bases Inspection (Teams)

1, 2 11/13/2017 11/17/2017 IP 7111121M Component Design Bases Inspection (Teams)

71124 - RAD SAFETY INSP 1 1, 2 01/22/2018 01/26/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 01/22/2018 01/26/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 7111111B - BV1 REQUAL INSP W/ P/S RESULTS 2 1 04/09/2018 04/13/2018 IP 7111111A Licensed Operator Requalification Program - Annual Review 1 04/09/2018 04/13/2018 IP 7111111B Licensed Operator Requalification Program 8/13EXAM - BEAVER VALLEY 1 INITIAL EXAM 5 1 07/16/2018 07/20/2018 U01961 FY18-BEAVER VALLEY 1 INITIAL OPERATOR LICENSING EXAM 1 08/13/2018 08/24/2018 U01961 FY18-BEAVER VALLEY 1 INITIAL OPERATOR LICENSING EXAM 71124 - RAD SAFETY INSP 1 1, 2 04/23/2018 04/27/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 04/23/2018 04/27/2018 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 04/23/2018 04/27/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/23/2018 04/27/2018 IP 71124.04 Occupational Dose Assessment U1 ISI - UNIT 1 INSERVICE INSPECTION 1 1 04/23/2018 05/04/2018 IP 7111108P Inservice Inspection Activities - PWR EP - EP EXERCISE INSPECTION 4 1, 2 06/11/2018 06/15/2018 IP 7111401 Exercise Evaluation 71124.06 - REMP 1 1, 2 07/09/2018 07/13/2018 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 07/09/2018 07/13/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Beaver Valley 01/31/2017 08:34:43 Inspection / Activity Plan Report 22 01/01/2017 - 12/31/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 7111105X - TRIENNIAL FIRE PROTECTION 4 1, 2 07/23/2018 07/27/2018 IP 7111105X Fire Protection - NFPA 805 (Triennial)

1, 2 08/06/2018 08/10/2018 IP 7111105X Fire Protection - NFPA 805 (Triennial)

U2 ISI - UNIT 2 INSERVICE INSPECTION 2 2 10/08/2018 10/19/2018 IP 7111108P Inservice Inspection Activities - PWR 71124 - RAD INSTRUMENTATION 1 1, 2 10/29/2018 11/02/2018 IP 71124.05 Radiation Monitoring Instrumentation 71124.08 - RADWASTE 1 1, 2 11/05/2018 11/09/2018 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124 - RAD SAFETY INSPECTION 1 1, 2 12/10/2018 12/14/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 12/10/2018 12/14/2018 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 12/10/2018 12/14/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 12/10/2018 12/14/2018 IP 71124.04 Occupational Dose Assessment 1, 2 12/10/2018 12/14/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.