|
|
Line 1: |
Line 1: |
| {{Adams | | {{Adams |
| | number = ML13255A296 | | | number = ML13025A295 |
| | issue date = 09/12/2013 | | | issue date = 01/25/2013 |
| | title = Er 05000482-13-301; June 17, 2013 - August 8, 2013; Wolf Creek Generating Station; Initial Operator Licensing Examination Report; Examination Development | | | title = IR 05000482-13-301, Wolf Creek Nuclear Operating Company - Notification of NRC Initial Operator Licensing Examination |
| | author name = Gaddy V G | | | author name = Gaddy V |
| | author affiliation = NRC/RGN-IV/DRS/OB | | | author affiliation = NRC/RGN-IV/DRS/OB |
| | addressee name = Sunseri M W | | | addressee name = Sunseri M W |
Line 10: |
Line 10: |
| | license number = NPF-042 | | | license number = NPF-042 |
| | contact person = | | | contact person = |
| | document report number = 50-482/13-301 | | | document report number = IR-13-301 |
| | document type = Letter, License-Operator Examination Report | | | document type = Letter, License-Operator Examination Report, Inspection Report |
| | page count = 17 | | | page count = 3 |
| }} | | }} |
|
| |
|
Line 19: |
Line 19: |
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter: |
| [[Issue date::September 12, 2013]] | | [[Issue date::January 25, 2013]] |
|
| |
|
| Matthew W. Sunseri, President and | | Mr. Matthew W. Sunseri, President and |
|
| |
|
| Chief Executive Officer | | Chief Executive Officer |
|
| |
|
| Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 | | Wolf Creek Nuclear Operating Company P. O. Box 411 Burlington, KS 66839 |
|
| |
|
| SUBJECT: WOLF CREEK GENERATING STATION - NRC EXAMINATION REPORT 05000482/2013301 | | SUBJECT: WOLF CREEK NUCLEAR OPERATING COMPANY - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000482/2013301 |
|
| |
|
| ==Dear Mr. Sunseri:== | | ==Dear Mr. Sunseri:== |
| On July 26, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Wolf Creek Generating Station. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on July 25, 2013, with yourself and other members of your staff. A telephonic exit meeting was conducted on August 8, 2013, with Mr. James Knapp, who was provided the NRC licensing decisions.
| | In a telephone conversation on January 9, 2013 between Ms. Jane Hartley and Duane Strickland, Chief Examiner, arrangements were made for the administration of licensing examinations at Wolf Creek during the week of July 22, 2013. |
|
| |
|
| The examination included the evaluation of six applicants for reactor operator licenses and one applicant for an instant senior reactor operator license. The license examiners determined that all seven applicants satisfied the requirements of 10 CFR Part 55 and the appropriate licenses have been issued. There were ten post examination comments submitted by your staff. Enclosure 1 contains details of this report and Enclosure 2 summarizes post examination comment resolution.
| | As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered, To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by May 3, 2013. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by May 31, 2013. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations, an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examinations and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for on-site validation of the examinations is required during the week of June 17, 2013. |
|
| |
|
| No findings were identified during this examination.
| | In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. |
|
| |
|
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
| | To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (O MB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. |
|
| |
|
| enclosure will be available electr onically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
| | This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 50 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. |
| rm/adams.html (the Public Electronic Reading Room).
| |
|
| |
|
| Sincerely,/RA/
| | The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number. |
| Vince Gaddy, Chief Operations Branch Division of Reactor Safety Docket: 50-482 License: NPF-42
| |
|
| |
|
| ===Enclosure:===
| | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be |
| 1. NRC Examination Report 05000482/2013301
| |
|
| |
|
| ===w/Attachment:===
| | available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. |
| Supplemental Information 2. NRC Post Examination Comment Resolution
| |
|
| |
|
| cc: Electronic Distribution for Wolf Creek Nuclear Generating Station
| | Thank you for your cooperation in this matter. Ms. Hartley has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Strickland at 817-200-1570 or myself at 817-200-1159. |
|
| |
|
| ML13255A296 ADAMS: No Yes SUNSI Review Complete Reviewer Initials: DGS Publicly Available Non-Sensitive Non-publicly Available Sensitive OE:OB SOE:OB SOE:OB C:PB C:OB SHedger KClayton DStrickland NOKeefe VGaddy /RA/ /RA/ /RA/ /RA/ /RA/ 9/11/13 9/10/13 9/10/13 9/11/13 9/12/13 Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION IV Docket: 50-482 License: NPF-42 Report: 05000482/2013301 Licensee: Wolf Creek Nuclear Operating Corporation Facility Wolf Creek Generating Station Location: 1550 Oxen Lane NE Burlington, Kansas Dates: June 17, 2013 - August 8, 2013 Inspectors: D. Strickland, Senior Operations Engineer K. Clayton, Senior Operations Engineer
| | Sincerely,/RA/ Vince Gaddy, Chief Operations Branch Division of Reactor Safety |
|
| |
|
| S. Hedger, Operations Engineer Approved By: Vince Gaddy, Chief Operations Branch
| | Docket: 50-482 License: NPF-42 |
|
| |
|
| Division of Reactor Safety
| | Electronic Distribution to Wolf Creek Nuclear Operating Company Electronic distribution by RIV: |
| | Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Steven.Reynolds@nrc.gov) |
| | DRP Director (Kriss.Kennedy@nrc.gov) |
| | Acting DRP Deputy Director (Barry.Westreich@nrc.gov) |
| | Acting DRS Director (Tom.Blount@nrc.gov) |
| | Acting DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Chris.Long@nrc.gov) |
| | Resident Inspector (Charles.Peabody@nrc.gov) |
|
| |
|
| =SUMMARY OF FINDINGS=
| | WC Administrative Assistant - Vacant |
| ER05000482/2013301; June 17, 2013 - August 8, 2013; Wolf Creek Generating Station; Initial
| |
|
| |
|
| Operator Licensing Examination Report; Examination Development
| | Branch Chief, DRP/B (Neil.OKeefe@nrc.gov) |
| | Senior Project Engineer, DRP/B (Leonard.Willoughby@nrc.gov) Project Engineer, DRP/B (David.You@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) |
| | Public Affairs Officer (Lara.Uselding@nrc.gov) |
| | Project Manager (Randy.Hall@nrc.gov) |
| | Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) |
| | Technical Support Assistant (Loretta.Williams@nrc.gov) |
| | Congressional Affairs Officer (Jenny.Weil@nrc.gov) |
|
| |
|
| NRC examiners evaluated the competency of six applicants for reactor operator licenses and one applicant for an instant senior reactor operator license at Wolf Creek Generating Station.
| | OEMail Resource |
|
| |
|
| The licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The written examination was administered by the licensee on July 19, 2013. NRC examiners administered the operating tests on the week of July 22, 2013.
| | ADAMS: No Yes SUNSI Review Complete Reviewer Initials: DGS Publicly Available Non-Sensitive Non-publicly Available Sensitive RIV: SOE C: DStrickland VGaddy /RA/ /RA/ 1/25/13 1/25/13 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax R:\_REACTORS\_WC\2013\WC 2013301 exam notify-DGS.docx ML13025A295 |
| | |
| The examiners determined that all seven of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.
| |
| | |
| ===A. NRC-Identified and Self-Revealing Findings===
| |
| | |
| None
| |
| | |
| ===B. Licensee-Identified Violations===
| |
| | |
| None
| |
| | |
| =REPORT DETAILS=
| |
| | |
| ==OTHER ACTIVITIES (OA)==
| |
| {{a|4OA5}}
| |
| ==4OA5 Other Activities (Initial Operator License Examination)==
| |
| | |
| ===.1 License Applications===
| |
| | |
| ====a. Scope====
| |
| NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. The examiners also audited three of the license applications in detail to confirm that they accurately reflected the subject applicant's qualifications. This audit focused on the applicant's experience and on-the-job training, including control manipulations that provided significant reactivity changes.
| |
| | |
| ====b. Findings====
| |
| No findings were identified.
| |
| | |
| ===.2 Examination Development===
| |
| | |
| ====a. Scope====
| |
| NRC examiners reviewed integrated examination outlines and draft examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examination team conducted an onsite validation of the operating tests.
| |
| | |
| ====b. Findings====
| |
| No findings were identified.
| |
| | |
| NRC examiners provided outline, draft examination and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration.
| |
| | |
| NRC examiners determined that the written ex amination initially submitted by the licensee was not within the range of acceptability expected for a proposed examination.
| |
| | |
| There were 38 questions categorized as unsatisfactory per NUREG-1021 requirements, with the two most common issues being knowledge/ability mismatch or two or more distracters that were not credible. Additionally, there were 36 questions that needed editorial changes, and 26 questions that were satisfactory as originally submitted.
| |
| | |
| Consistent with the corporate notification letter sent to licensees at the start of examination development for each examinati on, future unsatisfactory examination submittals may cause the examinations to be rescheduled or cancelled. The licensee wrote Condition Report 00073742 to address these exam development issues.
| |
| | |
| ===.3 Operator Knowledge and Performance===
| |
| | |
| ====a. Scope====
| |
| On July 19, 2013, the licensee proctored the administration of the written examinations to all seven applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis and post examination comments to the NRC on August 2, 2013.
| |
| | |
| The NRC examination team administered the various portions of the operating tests to all ten applicants on the week of July 22, 2013.
| |
| | |
| ====b. Findings====
| |
| No findings were identified.
| |
| | |
| All seven applicants passed all portions of the operating test. All of the applicants passed the written examination. The final written examinations and post-examination analysis and comments may be accessed in the ADAMS system under the accession numbers noted in the attachment. Post examination comments formally submitted by the licensee are included in the Enclosure 2 of this report.
| |
| | |
| The examination team noted a generic weakness during the administration of the Job Performance Measure associated with the ability to complete a Containment Purge Isolation. Three out of seven applicants initially closed two incorrect dampers, prior to closing the correct dampers. There was also a generic weakness noted in the completion of the Job Performance Measure associated with a task on the Radiation Monitoring Panel. Two of seven operators had problems with the operation of the RM11R panel. The licensee wrote Condition Report 00072089 to address the Radiation Monitoring Panel issue.
| |
| | |
| ===.4 Simulation Facility Performance===
| |
| | |
| ====a. Scope====
| |
| The NRC examiners observed simulator performanc e with regard to plant fidelity during examination validation and administration.
| |
| | |
| ====b. Findings====
| |
| No findings were identified.
| |
| | |
| ===.5 Examination Security===
| |
| | |
| ====a. Scope====
| |
| The NRC examiners reviewed examination security during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
| |
| | |
| ====b. Findings====
| |
| No findings were identified.
| |
| | |
| ===.6 Facility Post Examination Comments===
| |
| | |
| The facility provided the NRC chief examiner with ten post administration comments on the written examination. These comments are included in Enclosure 2 to this report and in ADAMS under as Accession Number ML 13248A545.
| |
| | |
| {{a|4OA6}}
| |
| ==4OA6 Meetings, Including Exit==
| |
| | |
| The chief examiner presented the preliminary examination results to Mr. Al Camp, Plant Manager, and other members of the staff on July 25, 2013. A telephonic exit was conducted on August 8, 2013, between Mr. Duane Strickland, Chief Examiner, and Mr. James Knapp, Supervisor, Operations Training.
| |
| | |
| All proprietary information and materials used during the examination were returned to the licensee.
| |
| | |
| ATTACHMENT:
| |
| | |
| =SUPPLEMENTAL INFORMATION=
| |
| | |
| ==KEY POINTS OF CONTACT==
| |
| | |
| ===Licensee Personnel===
| |
| | |
| Al Camp, Plant Manager
| |
| Steve Henry, Operations Manager Shane Battenfield, Operations Instructor Kenneth Fredrickson, Licensing
| |
| James Knapp, Supervisor, Operations Training
| |
| Edward Ray, Manager Training
| |
| Terry Damashek, Supervisor Operations Support Training Brendan Ryan, Initial Licensing Supervising Instructor
| |
| Robert Acree, Simulator Fidelity Coordinator
| |
| George Smith, Initial Licensing Supervising Instructor
| |
| | |
| ===NRC Personnel===
| |
| Charles Peabody, Senior Resident Inspector
| |
| | |
| ==ADAMS DOCUMENTS REFERENCED==
| |
| Accession No.
| |
| : ML 13248A540- FINAL WRITTEN EXAMS (Delayed release until July 26, 2015) Accession No.
| |
| : ML 13248A545 - POST EXAM ANALYSIS
| |
| : Accession No.
| |
| : ML 13248A547 - FINAL OPERATING TEST
| |
| : NRC Review of WC Written Post-Examination Comments Note:
| |
| : A complete text of the licensee's post examination analysis and comments can be found in ADAMS under Accession Number ML13248A545.
| |
| : QUESTION 2
| |
| : Given the following plant conditions:
| |
| | |
| * The Unit is operating at 68% power
| |
| * The crew is responding to a control bank D rod inadvertent withdrawal
| |
| * The control rods are placed in manual and the withdrawal stops
| |
| * The reactor did not trip * Control rod M4 indicates 6 steps above the rest of the bank Which ONE of the following sets of parameters describes the effect of this malfunction?
| |
| : A. QPTR goes down, Delta T goes up.
| |
| : B. QPTR goes down, Delta T stays the same. C. QPTR goes up, Delta T goes up. D. QPTR goes up, Delta T stays the same.
| |
| : Key Answer:
| |
| : D
| |
| : Licensee Comments for Question 2
| |
| :
| |
| : Q2 The stem does not specify a time frame, thus the Applicant is left with two options, both an initial effect and a long term or steady state effect of the stem conditions. | |
| : Therefore the Applicants could interpret 'D' as correct based on the textbook theory (GFES) or 'C' as correct based on actual plant response.
| |
| : Request:
| |
| : Accept two correct answers for Q2.
| |
| : It is acceptable per NUREG 1021; section
| |
| : ES-403 D.1.c to accept two correct answers.
| |
| : Context:
| |
| : Answer 'D' states that QPTR goes up, and Delta T remains the same.
| |
| : This was the correct answer based on a reactor core power tilt from the misaligned rod, and that turbine load is not being changed.
| |
| : Distractor 'C' states that QPTR goes up and Delta T goes up.
| |
| : This answer is correct based on actual plant operation.
| |
| : When plant power is stable, we operate the turbine in open-loop control, which results in a fixed turbine control valve position.
| |
| : The positive reactivity addition results in an increase in RCS temperature. | |
| : The increase in RCS temperature increases SG pressure.
| |
| : The increase in SG pressure results in a higher steam flow and higher power.
| |
| : There is some negative offset due to the smaller Cp at higher temperatures affecting delta-T, but this is nearly insignificant.
| |
| : This effect is demonstrated by actual plant behavior during dilutions to maintain reactor power.
| |
| : Although this is very small and not visible on analog indications, our control band at full power is 3 MWt (0.1%).
| |
| : Therefore the Applicants witnessed this plant response multiple times during their time on shift.
| |
| : The effect would be much larger depending on the actual amount of rod withdrawal prior to placing rods in manual.
| |
| | |
| - 2 -
| |
| : NRC Resolution of Question 2
| |
| :
| |
| : WC recommended that response C be accepted for this question based on plant response for a small positive reactivity addition they had experienced in the plant.
| |
| : In addition, answer D was the expected correct answer based on classroom theory taught to the applicants. | |
| : The non-
| |
| specified time frame, initial response vs. a longer term response, lead the applicants to choose a different answer.
| |
| : The NRC Region IV staff ag rees with this position and therefore both answer C and answer D are accepted for this question in accordance with
| |
| : ES-403 D.1.c.
| |
| : QUESTION 9
| |
| : Given the following plant conditions:
| |
| * A large LOCA has occurred * RCS is at saturation with system pressure matching Containment pressure
| |
| * RHR train flows are: 'A' flow is 3350gpm, 'B' flow is 3150 gpm
| |
| * RWST is 8% and dropping slowly What is the expected configuration for the Residual Heat Removal Pumps under these conditions AND what parameter is used to determine subsequent RHR pump configuration?
| |
| : A. Operating at rated flow of both pumps.
| |
| : RCS Pressure is > 325 psig
| |
| : B. Operating at rated flow of both pumps. RCS Hot Leg Temperature > 360F and at least One RHR Pump Running
| |
| : C. Operating at near run out conditions.
| |
| : RCS Pressure is > 325 psig
| |
| : D. Operating at near run out conditions.
| |
| : RCS Hot Leg Temperature > 360F and at least One RHR Pump Running
| |
| : Key Answer:
| |
| : A
| |
| : Licensee Comments for Question 9
| |
| :
| |
| : Q9
| |
| : The question should be deleted because it contains information in the stem that was unclear and confused the Applicants, which is listed as a reason to accept post-exam changes
| |
| | |
| per
| |
| : ES-403 D.1.b.
| |
| : Request:
| |
| : Delete Q9 from the exam.
| |
| : It is acceptable per NUREG 1021; section,
| |
| : ES-403 D.1.b to delete a question with an unclear stem that confused the Applicant or did not provide all the
| |
| | |
| necessary information.
| |
| : Context:
| |
| : Stem:
| |
| : Post-exam feedback indicated that the Applicants thought RHR flows were low based on plant conditions, expecting a higher flow rate.
| |
| : They also commented that "near run out" is a vague term.
| |
| : Several expressed confusion since RCS pressure was already less than 325 psig and incapable of repressurization.
| |
| : Additionally, the Applicants were unsure as to plant lineup
| |
| - 3 - status due to the "RWST dropping" slowly. | |
| : This could be due to a leak on the tank, ECCS
| |
| alignment, check valve problem, or containment spray alignment issue.
| |
| : NRC Resolution of Question 9:
| |
| : At WC, actual RHR flows in this configuration is not indicated on the RHR pump flow meters.
| |
| : Additional RHR flow from operating the SIP's and CCP's in the piggy-back mode must be added to the RHR pump flow meters to obtain actual fl ow.
| |
| : The RHR pump flows given in the stem was not realistic.
| |
| : In addition, due to the Large Break LOCA in progress, there was no expectation of RCS pressure increasing to >325 psig.
| |
| : Based on multiple confusing conditions given in the stem, the NRC Region IV staff agrees with this position and therefore this question was deleted from the written examination in accordance with
| |
| : ES-403 D.1.b.
| |
| : QUESTION 10
| |
| : Given the following plant conditions:
| |
| * PRT conditions are normal for 100% power
| |
| * The Unit was operating at 100% power when the turbine tripped * The reactor failed to automatically trip but was manually tripped * All other systems operated as expected
| |
| * The Emergency procedures have been performed and the plant stabilized
| |
| * It was noted that on the transient RCS pressure reached 2370 psig Which ONE of the following represents the expected status of the PRT AND the actions that must be taken to restore it to normal limits?
| |
| : A. PRT Pressure - 40 psig - High Vent excess pressure to the Gas Decay tanks.
| |
| : B. PRT Pressure - 14 psig - High Recirc through the RCDT Hx and reduce pressure.
| |
| : C. PRT Temperature - 220°F - High Recirc through the RCDT Hx and vent excess pressure to the Gas Decay tanks.
| |
| : D. PRT Temperature - 220°F - High Add water to cool the tank and drain to the RCDT to maintain level.
| |
| : Key Answer:
| |
| : A
| |
| : Licensee Comments for Question 10
| |
| :
| |
| : Q10
| |
| : The stem lacked some operational validity in that the PRT high temp would have been reached and the stem lacked info on the duration that the PORV was open.
| |
| : Because the stem
| |
| | |
| did not provide all the necessary info, per
| |
| : NUREG-1021 Section
| |
| : ES-403 D.1.b, it should be deleted from the examination.
| |
| : Request:
| |
| : Delete Q10 from the exam.
| |
| : It is acceptable per NUREG 1021; Section
| |
| : ES-403 D.1.b to delete a question with an unclear stem that confused the Applicant or did not provide all the
| |
| | |
| necessary information.
| |
| - 4 -
| |
| : Context:
| |
| : Stem:
| |
| : Post-examination feedback indicated that the Applicants could not discern the amount of time that the PORV was open from the stem conditions and could not determine the amount of mass and energy added to the PRT.
| |
| : They expected the PRT to be in alarm for both pressure and temperature for any significant PORV operation.
| |
| : They stated that there was not enough information to answer the question.
| |
| : The amount of PORV cycling is dependent on the timing of the manual reactor trip relative to the turbine trip.
| |
| : All that can be discerned from the stem is that the PORV cycled.
| |
| : NRC Resolution of Question 10
| |
| :
| |
| : The stem of the question did not provide operational validity.
| |
| : Actual expected plant conditions should be given, not expect the applicants to determine plant conditions based on incomplete information.
| |
| : Based on incomplete and confusing conditions given in the stem, the NRC Region IV staff agrees with this position and, therefore, this question was deleted from the written examination in accordance with
| |
| : ES-403 D.1.b.
| |
| : QUESTION 22
| |
| : Given the following plant conditions:
| |
| * A Large Break LOCA has occurred
| |
| * All RCP's are stopped
| |
| * ECCS and ESF systems functioned as designed * RCS pressure equals Containment pressure * The operating crew is ready to transition out of EMG E-0, REACTOR TRIP OR SAFETY
| |
| : INJECTION
| |
| : RCP #1 Seal Leakoff is . . .
| |
| : A. NOT OCCURRING.
| |
| : B. OCCURRING and flowing to the Pressurizer Relief Tank.
| |
| : C. OCCURRING and flowing to the Reactor Coolant Drain Tank.
| |
| : D. OCCURRING and flowing to the Volume Control Tank.
| |
| : Key Answer:
| |
| : B
| |
| : Licensee Comments for Question 22
| |
| :
| |
| : Q22
| |
| : It is proposed to delete the question due to a stem that did not provide all the necessary information.
| |
| : If seal flows are normal, then distractor 'A' is correct.
| |
| : If seal flow is excessive, then answer 'B' is correct.
| |
| : Both 'C' & 'D' are incorrect under all conditions.
| |
| : Because answers 'A' &
| |
| 'B' are mutually exclusive, deletion is recommended rather than accepting two answers.
| |
| : Request:
| |
| : Delete Q22 from the exam.
| |
| : It is acceptable per NUREG 1021; section
| |
| : ES-403 D.1.b to delete a question with an unclear stem that confused the Applicant or did not provide all the necessary information.
| |
| : It is acceptable per NUREG 1021; section
| |
| : ES-403 D.1.c to delete a question with two answers that are mutually exclusive.
| |
| - 5 -
| |
| : Context:
| |
| : Answer 'B' is that seal return is occurring and flowing to the PRT.
| |
| : This is normally the case following
| |
| : CIS-A with the RCS pressurized.
| |
| : However, the stem indicates that a large break
| |
| : LOCA is in progress with RCS equal to Containment pressure.
| |
| : The relief valve to the PRT, BG-
| |
| : 21, lifts at 150 psig, which is unlikely unless seal injection flow is excessive.
| |
| : Distractor 'A' is that seal return is not occurring.
| |
| : Based on plant conditions in the stem, #1 seal leakoff is unlikely to be occurring.
| |
| : Since the stem states that RCS and Containment pressure are matched, there is insufficient pressure to lift the relief.
| |
| : Seal injection continues, but the flow is diverted to the low pressure RCS, especially since the #1 seal faces are likely closed.
| |
| : The only way to provide enough backpressure to lift the relief is for seal injection flow to be so large that the thermal barrier labyrinth seals to provide the backpressure.
| |
| : NRC Resolution of Question 22
| |
| :
| |
| : The amount of seal injection flow following a Large Break LOCA determines whether or not seal leakoff is occurring.
| |
| : This information was not given in the stem.
| |
| : The possible correct answers are mutually exclusive, based on the assumption the applicant uses.
| |
| : Based on not giving the value for seal injection in the stem, the NRC Region IV staff agrees with this position and, therefore, this question was deleted from the written examination in accordance with
| |
| : ES-403
| |
| : D.1.c.
| |
| : QUESTION 33
| |
| : Why is it worse for an Anticipated Transient Without Scram event to occur at low power at the Beginning Of Life (BOL) conditions?
| |
| : A. The additional burnable poisons provide LESS heat conduction at lower power; therefore, the fuel pin outer clad temperatures are HIGHER.
| |
| : B. The Power Coefficient is LESS NEGATIVE at lower power; therefore, it provides MINIMUM negative feedback.
| |
| : C. The higher SG pressures at lower power remove heat from the RCS at a LOWER RATE; therefore, RCS temperatures RISE to a higher level.
| |
| : D.
| |
| : The high boron concentration causes the emergency boration to be LESS EFFECTIVE; therefore, taking a LONGER time to achieve adequate Shutdown Margin (SDM).
| |
| : Key Answer:
| |
| : B
| |
| : Licensee Comments for Question 33
| |
| :
| |
| : Q33 The stem is unclear.
| |
| : The stem doesn't ask for the "principal" reason why an ATWS is worse at low power at BOL vs. EOL, thus answer 'D' could also be argued as correct.
| |
| : Request:
| |
| : Accept two correct answers fo
| |
| r Q33.
| |
| : It is acceptable per NUREG 1021; Section
| |
| : ES-403 D.1.c to accept two correct answers.
| |
| | |
| - 6 -
| |
| : Context:
| |
| : Answer 'B' is correct due to the small value of the power coefficient.
| |
| : This is predominantly due to the moderator temperature coefficient (MTC) being only slightly negative or slightly positive under BOL conditions.
| |
| : Therefore, the RCS heatup following turbine trip will not significantly reduce reactor power.
| |
| : Distractor 'D' is that the higher boron concentration makes emergency boration less effective.
| |
| : Although this is not the principal success path in EMG
| |
| : FR-S1, RESPONSE TO NUCLEAR PWR GENERATION/ATWS, it is a secondary action to add negative reactivity that is always performed.
| |
| : NRC Resolution of Question 33
| |
| :
| |
| : There are multiple reasons why an ATWS is worse at low power BOL.
| |
| : The stem did not ask for the major reason, leaving more than 1 correct reason.
| |
| : NRC Region IV staff agrees that both B and D responses are correct and therefore both answer B and answer D are accepted for this question in accordance with
| |
| : ES-403 D.1.c.
| |
| : QUESTION 38
| |
| : Given the following plant conditions:
| |
| * The Unit has experienced a steamline break
| |
| * None of the main steam isolation valves can be closed * EMG C-21, UNCONTROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS, has been implemented
| |
| : Which ONE of the following describes the reason for performing Attachment B, Main Steam Header Isolation - Local?
| |
| : A. Isolation of both steam supply lines to the TDAFP is allowed, regardless of the status of the other sources of feed flow to the SGs, since no secondary heat sink is intact.
| |
| : B. To restore integrity to at least one SG in order to transition to EMG E-2, FAULTED STEAM GENERATOR ISOLATION, via the foldout page.
| |
| : C. Valves are closed in any order to restore integrity to all SGs as early as possible. | |
| : D. The Operator is allowed to place the Condenser Steam Dump valves to CLOSE only if the selected valve is NOT accessible for local isolation.
| |
| : Key Answer:
| |
| : B
| |
| : Licensee Comments for Question 38
| |
| :
| |
| : Q38
| |
| : It is proposed to delete this question due to an unclear stem.
| |
| : EMG C-21 step 1 attempts to isolate one Steam Generator.
| |
| : Attachment B is entered in response to the inability to isolate one Steam Generator and directs the Operator to isolate the Main Steam Header.
| |
| | |
| - 7 -
| |
| : Request:
| |
| : Delete Q38 from the exam.
| |
| : It is acceptable per NUREG 1021; section
| |
| : ES-403 D.1.b to delete a question with an unclear stem that confused the Applicant or did not provide all the necessary information.
| |
| : Context:
| |
| : Stem asks for an answer that is not supported by the background document.
| |
| : There is no information in the background document of EMG C-21 to support the answer provided.
| |
| : Performance of Attachment B will not result in one or more intact steam generators.
| |
| : Other:
| |
| : TNA 2013-1345-1, Condition Report
| |
| : 00072233 and Procedure Change Request 58807
| |
| | |
| were written.
| |
| : NRC Resolution of Question 38
| |
| :
| |
| : This question was written with the expectation that an attempt would be made in Attachment B to locally close the MSIV's.
| |
| : Due to the replacem ent of WC MSIV's with a different model valve, there is no procedural step or method to locally close the MSIV's.
| |
| : Based on there being no clear answer, the NRC Region IV staff agrees with this position and therefore this question was deleted from the written examination.
| |
| : QUESTION 65
| |
| : In addition to a Record Dose Dosimeter (RDD), which ONE of the following describes a
| |
| : MINIMUM acceptable monitoring method for personnel entering a 'Locked High Radiation Area'?
| |
| : A. A radiation monitoring device that continuously monitors the radiation dose rate in the area AND alarms when the dose rate alarm setpoint is reached.
| |
| : B. Radiation monitoring device that continuously transmits dose rate AND cumulative dose to a remote receiver.
| |
| : C. Self-reading dosimeter AND continuous surveillance by radiation protection, via a closed circuit television with a means of communication with each person in the area.
| |
| : D. Self-reading dosimeter AND an operable area radiation monitor for the general area.
| |
| : Key Answer:
| |
| : C
| |
| : Licensee Comments for Question 65
| |
| :
| |
| : Q65 Distractor 'B' could also be argued as correct based on an unclear stem not based on actual plant practices.
| |
| : Request:
| |
| : Accept two correct answers fo
| |
| r Q65.
| |
| : It is acceptable per NUREG 1021; Section
| |
| : ES-403 D.1.c to accept two correct answers.
| |
| | |
| - 8 -
| |
| : Context:
| |
| : It is proposed that distractor 'B' should be accepted in addition to answer 'C' based on a question with an unclear stem that confused the Applicants based on actual plant practices.
| |
| : Answer 'C' is correct in that a self-reading dosimeter and continuous surveillance by RP with a
| |
| | |
| means of communication.
| |
| : The justification for distractor 'B' being incorrect was that it does not contain the reference to the device being monitored by Health Physics nor communications.
| |
| : However these conditions are implied since the only remote monitoring system at Wolf Creek is Teledose, which reads out at the RADs camera console at Access Control, with various options for local communication
| |
| (radio, Gaitronics, etc.).
| |
| : In order to obtain Teledose dosimetry, the RADs console operator must check it out to the individual.
| |
| : The RADs console operator will not let the individual leave until it is verified that the device is communicating with the console and the means of field communication are established with the individual (radio, Gaitronics, or direct coverage by the
| |
| : HP lead in the field.)
| |
| : By simply obtaining the dosimetry, the field operator has met the requirements since the other requirements are part of that process.
| |
| : NRC Resolution of Question 65
| |
| :
| |
| : Actual plant practices for entry into a 'Locked High Radiation Area' are similar to response B, while the proposed answer C is described in procedure
| |
| : AP 25A-200.
| |
| : Due to the confusion to the applicants based on actual practice compared to procedural description,
| |
| : NRC Region IV staff agrees that both B and C responses are correct and therefore both answer B and answer C are accepted for this question in accordance with
| |
| : ES-403 D.1.c.
| |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARIR 05000482/20244202024-10-31031 October 2024 Security Baseline Inspection Report 05000482/2024420 ML24296B1902024-10-22022 October 2024 10 CFR 50.55a Requests for the Fifth Ten-Year Interval Inservice Testing Program 05000482/LER-2024-001-01, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-10-22022 October 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing 05000482/LER-2024-002, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-10-21021 October 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24283A0752024-10-0909 October 2024 Notification of Commercial Grade Dedication Inspection (05000482/2025012) and Request for Information ML24199A1712024-09-17017 September 2024 Issuance of Amendment No. 241 Revise Ventilation Filter Testing Program Criteria and Administrative Correction of Absorber in Technical Specification 5.5.11 ML24260A0712024-09-12012 September 2024 License Amendment Request for a Risk-Informed Resolution to GSI-191 IR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML24248A2492024-09-0404 September 2024 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 26 Owner’S Activity Report ML24241A2212024-08-29029 August 2024 Notice of Enforcement Discretion for Wolf Creek Generating Station ML24240A2642024-08-27027 August 2024 Corporation - Request for Notice of Enforcement Discretion Regarding Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 05000482/LER-2024-001, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-07-0202 July 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) ML24150A0562024-05-29029 May 2024 Foreign Ownership, Control or Influence (FOCI) Information – Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML23345A1602024-05-0909 May 2024 Revision of Safety Evaluation for Amendment No. 237 Request for Deviation from Fire Protection Requirements ML24089A2622024-04-29029 April 2024 Financial Protection Levels ML24118A0022024-04-27027 April 2024 Wolf Generating Nuclear Station - 2023 Annual Radiological Environmental Operating Report ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24113A1882024-04-19019 April 2024 Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML24109A1842024-04-18018 April 2024 Cycle 27 Core Operating Limits Report ML24109A1212024-04-18018 April 2024 (WCGS) Form 5 Exposure Report for Calendar Year 2023 IR 05000482/20240012024-04-17017 April 2024 Integrated Inspection Report 05000482/2024001 ML24114A1442024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37 ML24106A1482024-04-15015 April 2024 Notification of Inspection (NRC Inspection Report 05000482/2024003) and Request for Information ML24098A0052024-04-0707 April 2024 2023 Annual Environmental Operating Report ML24089A0972024-03-29029 March 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24089A1352024-03-29029 March 2024 10 CFR 50.46 Annual Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes ML24074A3312024-03-14014 March 2024 Missed Quarterly Inspection Per 40 CFR 266 Subpart N IR 05000482/20240122024-03-11011 March 2024 Fire Protection Team Inspection Report 05000482/2024012 ML24080A3452024-03-11011 March 2024 7 of the Wolf Creek Generating Station Updated Safety Analysis Report ML24016A0702024-03-0808 March 2024 Issuance of Amendment No. 240 Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ML24068A1992024-03-0707 March 2024 Changes to Technical Specification Bases - Revisions 93 and 94 ML24066A0672024-03-0505 March 2024 4-2022-024 Letter - OI Closure to Licensee ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners IR 05000482/20230062024-02-28028 February 2024 Annual Assessment Letter for Wolf Creek Generating Station Report 05000482/2023006 ML24059A1702024-02-28028 February 2024 Annual Fitness for Duty Program Performance Report, and Annual Fatigue Report for 2023 ML24026A0212024-02-27027 February 2024 Issuance of Amendment No. 239 Modified Implementation Date of License Amendment No. 238 ML24050A0012024-02-19019 February 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) 2024-09-06
[Table view] Category:License-Operator Examination Report
MONTHYEARML24089A0972024-03-29029 March 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000482/20213012022-01-19019 January 2022 NRC Examination Report 05000482/2021301 IR 05000482/20173012018-01-11011 January 2018 NRC Examination Report 05000482/2017301 IR 05000482/20153012016-01-28028 January 2016 Er 05000482/2015301; 11/13/2015 - 12/29/2015; Wolf Creek Generating Station; Initial Operator Licensing Examination Report IR 05000482/20133012013-09-12012 September 2013 Er 05000482-13-301; June 17, 2013 - August 8, 2013; Wolf Creek Generating Station; Initial Operator Licensing Examination Report; Examination Development ML13025A2952013-01-25025 January 2013 IR 05000482-13-301, Wolf Creek Nuclear Operating Company - Notification of NRC Initial Operator Licensing Examination IR 05000482/20123012012-02-23023 February 2012 Er 05000482-12-301, on January 18, 2012 - February 15, 2012, Wolf Creek Generating Station, Retake Operator Licensing Examination Report IR 05000482/20110012011-10-18018 October 2011 Er 05000482-11-001; August 26, 2011 - September 22, 2011; Wolf Creek Generating Station; Initial Operator Licensing Examination Report; Examination Development IR 05000482/20093022010-02-11011 February 2010 Er 05000482-09-302; December 14, 2009 - January 6, 2010; Wolf Creek Generating Station; Initial Operator Licensing Examination Report; Identification and Resolution of Problems IR 05000482/20093012009-10-20020 October 2009 Er 05000482-09-301; August 31 - October 2, 2009; Wolf Creek Generating Station; Initial Operator Licensing Examination Report IR 05000482/20063012006-04-0303 April 2006 Er 05000482-06-301; 03/03-09/2006; Wolf Creek Nuclear Generating Station; Initial Operator Licensing Examination Report ML0409200332004-03-30030 March 2004 Generic Fundamentals Section of the Written Operator Licensing Examination WO 02-0037, Preparation and Scheduling of Operator Licensing Examinations2002-07-11011 July 2002 Preparation and Scheduling of Operator Licensing Examinations 2024-03-29
[Table view] Category:Inspection Report
MONTHYEARIR 05000482/20244202024-10-31031 October 2024 Security Baseline Inspection Report 05000482/2024420 IR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 IR 05000482/20240012024-04-17017 April 2024 Integrated Inspection Report 05000482/2024001 IR 05000482/20240122024-03-11011 March 2024 Fire Protection Team Inspection Report 05000482/2024012 IR 05000482/20230062024-02-28028 February 2024 Annual Assessment Letter for Wolf Creek Generating Station Report 05000482/2023006 IR 05000482/20230042024-01-11011 January 2024 Integrated Inspection Report 05000482/2023004 IR 05000482/20233012023-12-19019 December 2023 NRC Examination Report 05000482/2023301 IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 IR 05000482/20234202023-07-12012 July 2023 Security Baseline Inspection Report 05000482/2023420 - Cover Letter IR 05000482/20230022023-07-11011 July 2023 Integrated Inspection Report 05000482/2023002 IR 05000482/20234012023-06-21021 June 2023 Security Baseline Inspection Report 05000482/2023401 ML23111A0662023-04-20020 April 2023 (Cover Letter Only) Wolf Creek Generating Station – Special Inspection Reactive Report 05000482-20220502 IR 05000482/20230012023-04-19019 April 2023 Integrated Inspection Report 05000482/2023001 IR 05000482/20220062023-03-0101 March 2023 Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2022006) IR 05000482/20234022023-02-0606 February 2023 Security Baseline Inspection Report 050004822023402 ML23017A2092023-01-18018 January 2023 Emergency Preparedness Biennial Exercise Inspection URI Closure Report IR 05000482/20220042023-01-17017 January 2023 Integrated Inspection Report 05000482/2022004 ML22333A7132022-12-0202 December 2022 License Renewal Phase 1 Report IR 05000482/20220032022-10-25025 October 2022 Integrated Inspection Report 05000482/2022003 IR 05000482/20224032022-08-31031 August 2022 NRC Security Baseline Inspection Report 05000482/2022403 IR 05000482/20220052022-08-23023 August 2022 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2022005) IR 07200079/20224042022-08-0404 August 2022 NRC Security Inspection Report 07200079/2022404 (Cover Letter) IR 05000482/20220022022-07-25025 July 2022 Integrated Inspection Report 05000482/2022002 IR 05000482/20224022022-06-29029 June 2022 Security Baseline Inspection Report 05000482/2022402 - Public IR 05000482/20220102022-05-0505 May 2022 Biennial Problem Identification and Resolution Inspection Report 05000482/2022010 IR 05000482/20224012022-05-0303 May 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000482/2022401 IR 05000482/20220012022-04-25025 April 2022 Integrated Inspection Report 05000482/2022001 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2022001 IR 05000482/20210062022-03-0202 March 2022 Annual Assessment Letter (Report 05000482/2021006) IR 05000482/20210042022-01-19019 January 2022 Integrated Inspection Report 05000482/2021004 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2021002 IR 05000482/20213012022-01-19019 January 2022 NRC Examination Report 05000482/2021301 IR 05000482/20210112021-12-0101 December 2021 Temporary Instruction 2515/194 Report 05000482/2021011 IR 05000482/20214202021-11-15015 November 2021 Inspection Report Cover Letter FOF 05000482/2021420 IR 05000482/20210032021-11-0505 November 2021 Integrated Inspection Report 05000482/2021003 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2021001, WC2021003 IR Ch IR 05000482/20210102021-09-0909 September 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000482/2021010 IR 05000482/20210022021-08-0909 August 2021 Integrated Inspection Report 05000482/2021002 IR 05000482/20214022021-07-27027 July 2021 NRC Security Baseline Inspection Report 05000482/2021402 (Cover Letter Without Enclosure) IR 05000482/20210012021-05-0505 May 2021 Integrated Inspection Report 05000482/2021001 IR 05000482/20190062021-03-0303 March 2021 Annual Assessment Letter (Report 05000482/2019006) IR 05000482/20214012021-02-26026 February 2021 NRC Security Inspection Report 05000482/2021401 IR 05000482/20200042021-02-0909 February 2021 Integrated Inspection Report 05000482/2020004 IR 05000482/20200132020-12-0303 December 2020 Traditional Enforcement Follow-Up Inspection Report 05000482/2020013 IR 05000482/20200122020-11-19019 November 2020 Triennial Fire Protection Inspection Report 05000482/2020012 IR 05000482/20200032020-11-12012 November 2020 Integrated Inspection Report 05000482/2020003 IR 05000482/20204102020-09-29029 September 2020 Security Baseline Inspection Report 05000482/2020410 IR 05000482/20200022020-08-12012 August 2020 Integrated Inspection Report 05000482/2020002 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2020001 IR 05000482/20200102020-08-0303 August 2020 Biennial Problem Identification and Resolution Inspection Report 05000482/2020010 IR 05000482/20200112020-05-21021 May 2020 Design Basis Assurance Inspection (Programs) Inspection Report 05000482/2020011 2024-09-10
[Table view] |
Text
January 25, 2013
Mr. Matthew W. Sunseri, President and
Chief Executive Officer
Wolf Creek Nuclear Operating Company P. O. Box 411 Burlington, KS 66839
SUBJECT: WOLF CREEK NUCLEAR OPERATING COMPANY - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000482/2013301
Dear Mr. Sunseri:
In a telephone conversation on January 9, 2013 between Ms. Jane Hartley and Duane Strickland, Chief Examiner, arrangements were made for the administration of licensing examinations at Wolf Creek during the week of July 22, 2013.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered, To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by May 3, 2013. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by May 31, 2013. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations, an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examinations and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for on-site validation of the examinations is required during the week of June 17, 2013.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (O MB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Ms. Hartley has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Strickland at 817-200-1570 or myself at 817-200-1159.
Sincerely,/RA/ Vince Gaddy, Chief Operations Branch Division of Reactor Safety
Docket: 50-482 License: NPF-42
Electronic Distribution to Wolf Creek Nuclear Operating Company Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Steven.Reynolds@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
Acting DRP Deputy Director (Barry.Westreich@nrc.gov)
Acting DRS Director (Tom.Blount@nrc.gov)
Acting DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Chris.Long@nrc.gov)
Resident Inspector (Charles.Peabody@nrc.gov)
WC Administrative Assistant - Vacant
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)
Senior Project Engineer, DRP/B (Leonard.Willoughby@nrc.gov) Project Engineer, DRP/B (David.You@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Randy.Hall@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
ADAMS: No Yes SUNSI Review Complete Reviewer Initials: DGS Publicly Available Non-Sensitive Non-publicly Available Sensitive RIV: SOE C: DStrickland VGaddy /RA/ /RA/ 1/25/13 1/25/13 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax R:\_REACTORS\_WC\2013\WC 2013301 exam notify-DGS.docx ML13025A295