|
---|
Category:Letter
MONTHYEARIR 05000482/20244202024-10-31031 October 2024 Security Baseline Inspection Report 05000482/2024420 05000482/LER-2024-001-01, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-10-22022 October 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing ML24296B1902024-10-22022 October 2024 10 CFR 50.55a Requests for the Fifth Ten-Year Interval Inservice Testing Program 05000482/LER-2024-002, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-10-21021 October 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24283A0752024-10-0909 October 2024 Notification of Commercial Grade Dedication Inspection (05000482/2025012) and Request for Information ML24199A1712024-09-17017 September 2024 Issuance of Amendment No. 241 Revise Ventilation Filter Testing Program Criteria and Administrative Correction of Absorber in Technical Specification 5.5.11 ML24260A0712024-09-12012 September 2024 License Amendment Request for a Risk-Informed Resolution to GSI-191 IR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24248A2492024-09-0404 September 2024 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 26 Owner’S Activity Report ML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML24241A2212024-08-29029 August 2024 Notice of Enforcement Discretion for Wolf Creek Generating Station ML24240A2642024-08-27027 August 2024 Corporation - Request for Notice of Enforcement Discretion Regarding Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 05000482/LER-2024-001, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-07-0202 July 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) ML24150A0562024-05-29029 May 2024 Foreign Ownership, Control or Influence (FOCI) Information – Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML23345A1602024-05-0909 May 2024 Revision of Safety Evaluation for Amendment No. 237 Request for Deviation from Fire Protection Requirements ML24089A2622024-04-29029 April 2024 Financial Protection Levels ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24118A0022024-04-27027 April 2024 Wolf Generating Nuclear Station - 2023 Annual Radiological Environmental Operating Report ML24113A1882024-04-19019 April 2024 Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML24109A1212024-04-18018 April 2024 (WCGS) Form 5 Exposure Report for Calendar Year 2023 ML24109A1842024-04-18018 April 2024 Cycle 27 Core Operating Limits Report IR 05000482/20240012024-04-17017 April 2024 Integrated Inspection Report 05000482/2024001 ML24114A1442024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37 ML24106A1482024-04-15015 April 2024 Notification of Inspection (NRC Inspection Report 05000482/2024003) and Request for Information ML24098A0052024-04-0707 April 2024 2023 Annual Environmental Operating Report ML24089A1352024-03-29029 March 2024 10 CFR 50.46 Annual Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes ML24089A0972024-03-29029 March 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24074A3312024-03-14014 March 2024 Missed Quarterly Inspection Per 40 CFR 266 Subpart N ML24080A3452024-03-11011 March 2024 7 of the Wolf Creek Generating Station Updated Safety Analysis Report IR 05000482/20240122024-03-11011 March 2024 Fire Protection Team Inspection Report 05000482/2024012 ML24016A0702024-03-0808 March 2024 Issuance of Amendment No. 240 Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ML24068A1992024-03-0707 March 2024 Changes to Technical Specification Bases - Revisions 93 and 94 ML24066A0672024-03-0505 March 2024 4-2022-024 Letter - OI Closure to Licensee ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners ML24059A1702024-02-28028 February 2024 Annual Fitness for Duty Program Performance Report, and Annual Fatigue Report for 2023 IR 05000482/20230062024-02-28028 February 2024 Annual Assessment Letter for Wolf Creek Generating Station Report 05000482/2023006 ML24026A0212024-02-27027 February 2024 Issuance of Amendment No. 239 Modified Implementation Date of License Amendment No. 238 ML24050A0012024-02-19019 February 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) 2024-09-06
[Table view] Category:License-Operator Examination Report
MONTHYEARML24089A0972024-03-29029 March 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000482/20213012022-01-19019 January 2022 NRC Examination Report 05000482/2021301 IR 05000482/20173012018-01-11011 January 2018 NRC Examination Report 05000482/2017301 IR 05000482/20153012016-01-28028 January 2016 Er 05000482/2015301; 11/13/2015 - 12/29/2015; Wolf Creek Generating Station; Initial Operator Licensing Examination Report IR 05000482/20133012013-09-12012 September 2013 Er 05000482-13-301; June 17, 2013 - August 8, 2013; Wolf Creek Generating Station; Initial Operator Licensing Examination Report; Examination Development ML13025A2952013-01-25025 January 2013 IR 05000482-13-301, Wolf Creek Nuclear Operating Company - Notification of NRC Initial Operator Licensing Examination IR 05000482/20123012012-02-23023 February 2012 Er 05000482-12-301, on January 18, 2012 - February 15, 2012, Wolf Creek Generating Station, Retake Operator Licensing Examination Report IR 05000482/20110012011-10-18018 October 2011 Er 05000482-11-001; August 26, 2011 - September 22, 2011; Wolf Creek Generating Station; Initial Operator Licensing Examination Report; Examination Development IR 05000482/20093022010-02-11011 February 2010 Er 05000482-09-302; December 14, 2009 - January 6, 2010; Wolf Creek Generating Station; Initial Operator Licensing Examination Report; Identification and Resolution of Problems IR 05000482/20093012009-10-20020 October 2009 Er 05000482-09-301; August 31 - October 2, 2009; Wolf Creek Generating Station; Initial Operator Licensing Examination Report IR 05000482/20063012006-04-0303 April 2006 Er 05000482-06-301; 03/03-09/2006; Wolf Creek Nuclear Generating Station; Initial Operator Licensing Examination Report ML0409200332004-03-30030 March 2004 Generic Fundamentals Section of the Written Operator Licensing Examination WO 02-0037, Preparation and Scheduling of Operator Licensing Examinations2002-07-11011 July 2002 Preparation and Scheduling of Operator Licensing Examinations 2024-03-29
[Table view] Category:Inspection Report
MONTHYEARIR 05000482/20244202024-10-31031 October 2024 Security Baseline Inspection Report 05000482/2024420 IR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 IR 05000482/20240012024-04-17017 April 2024 Integrated Inspection Report 05000482/2024001 IR 05000482/20240122024-03-11011 March 2024 Fire Protection Team Inspection Report 05000482/2024012 IR 05000482/20230062024-02-28028 February 2024 Annual Assessment Letter for Wolf Creek Generating Station Report 05000482/2023006 IR 05000482/20230042024-01-11011 January 2024 Integrated Inspection Report 05000482/2023004 IR 05000482/20233012023-12-19019 December 2023 NRC Examination Report 05000482/2023301 IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 IR 05000482/20234202023-07-12012 July 2023 Security Baseline Inspection Report 05000482/2023420 - Cover Letter IR 05000482/20230022023-07-11011 July 2023 Integrated Inspection Report 05000482/2023002 IR 05000482/20234012023-06-21021 June 2023 Security Baseline Inspection Report 05000482/2023401 ML23111A0662023-04-20020 April 2023 (Cover Letter Only) Wolf Creek Generating Station Special Inspection Reactive Report 05000482-20220502 IR 05000482/20230012023-04-19019 April 2023 Integrated Inspection Report 05000482/2023001 IR 05000482/20220062023-03-0101 March 2023 Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2022006) IR 05000482/20234022023-02-0606 February 2023 Security Baseline Inspection Report 050004822023402 ML23017A2092023-01-18018 January 2023 Emergency Preparedness Biennial Exercise Inspection URI Closure Report IR 05000482/20220042023-01-17017 January 2023 Integrated Inspection Report 05000482/2022004 ML22333A7132022-12-0202 December 2022 License Renewal Phase 1 Report IR 05000482/20220032022-10-25025 October 2022 Integrated Inspection Report 05000482/2022003 IR 05000482/20224032022-08-31031 August 2022 NRC Security Baseline Inspection Report 05000482/2022403 IR 05000482/20220052022-08-23023 August 2022 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2022005) IR 07200079/20224042022-08-0404 August 2022 NRC Security Inspection Report 07200079/2022404 (Cover Letter) IR 05000482/20220022022-07-25025 July 2022 Integrated Inspection Report 05000482/2022002 IR 05000482/20224022022-06-29029 June 2022 Security Baseline Inspection Report 05000482/2022402 - Public IR 05000482/20220102022-05-0505 May 2022 Biennial Problem Identification and Resolution Inspection Report 05000482/2022010 IR 05000482/20224012022-05-0303 May 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000482/2022401 IR 05000482/20220012022-04-25025 April 2022 Integrated Inspection Report 05000482/2022001 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2022001 IR 05000482/20210062022-03-0202 March 2022 Annual Assessment Letter (Report 05000482/2021006) IR 05000482/20210042022-01-19019 January 2022 Integrated Inspection Report 05000482/2021004 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2021002 IR 05000482/20213012022-01-19019 January 2022 NRC Examination Report 05000482/2021301 IR 05000482/20210112021-12-0101 December 2021 Temporary Instruction 2515/194 Report 05000482/2021011 IR 05000482/20214202021-11-15015 November 2021 Inspection Report Cover Letter FOF 05000482/2021420 IR 05000482/20210032021-11-0505 November 2021 Integrated Inspection Report 05000482/2021003 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2021001, WC2021003 IR Ch IR 05000482/20210102021-09-0909 September 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000482/2021010 IR 05000482/20210022021-08-0909 August 2021 Integrated Inspection Report 05000482/2021002 IR 05000482/20214022021-07-27027 July 2021 NRC Security Baseline Inspection Report 05000482/2021402 (Cover Letter Without Enclosure) IR 05000482/20210012021-05-0505 May 2021 Integrated Inspection Report 05000482/2021001 IR 05000482/20190062021-03-0303 March 2021 Annual Assessment Letter (Report 05000482/2019006) IR 05000482/20214012021-02-26026 February 2021 NRC Security Inspection Report 05000482/2021401 IR 05000482/20200042021-02-0909 February 2021 Integrated Inspection Report 05000482/2020004 IR 05000482/20200132020-12-0303 December 2020 Traditional Enforcement Follow-Up Inspection Report 05000482/2020013 IR 05000482/20200122020-11-19019 November 2020 Triennial Fire Protection Inspection Report 05000482/2020012 IR 05000482/20200032020-11-12012 November 2020 Integrated Inspection Report 05000482/2020003 IR 05000482/20204102020-09-29029 September 2020 Security Baseline Inspection Report 05000482/2020410 IR 05000482/20200022020-08-12012 August 2020 Integrated Inspection Report 05000482/2020002 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2020001 IR 05000482/20200102020-08-0303 August 2020 Biennial Problem Identification and Resolution Inspection Report 05000482/2020010 IR 05000482/20200112020-05-21021 May 2020 Design Basis Assurance Inspection (Programs) Inspection Report 05000482/2020011 2024-09-10
[Table view] |
See also: IR 05000482/2013301
Text
UNITE D S TATE S
NUC LEAR RE GULATOR Y C OMMI S SI ON
R E G IO N I V
1600 EAST LAMAR BLVD
AR L I NGTON , TEXAS 7 601 1- 4511
January 25, 2013
Mr. Matthew W. Sunseri, President and
Chief Executive Officer
Wolf Creek Nuclear Operating Company
P. O. Box 411
Burlington, KS 66839
SUBJECT: WOLF CREEK NUCLEAR OPERATING COMPANY - NOTIFICATION OF NRC
INITIAL OPERATOR LICENSING EXAMINATION 05000482/2013301
Dear Mr. Sunseri:
In a telephone conversation on January 9, 2013 between Ms. Jane Hartley and Duane
Strickland, Chief Examiner, arrangements were made for the administration of licensing
examinations at Wolf Creek during the week of July 22, 2013.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power
Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for
Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will
discuss with your staff any changes that might be necessary before the examinations are
administered,
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by May 3, 2013. The written examinations, operating tests, and supporting reference
materials identified in Attachment 3 to ES-201 will be due by May 31, 2013. Pursuant to Title 10,
Section 55.40(b)(3), of the Code of Federal Regulations, an authorized representative of the
facility licensee shall approve the outlines, examinations, and tests before they are submitted to
the NRC for review and approval. All materials shall be complete and ready-to-use. We
request that any personal, proprietary, sensitive unclassified, or safeguards information in your
response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examinations and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled. In addition, your support
for on-site validation of the examinations is required during the week of June 17, 2013.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
M. Sunseri -2-
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver
requests (if any) (OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act
of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on February 28, 2013. The public reporting burden
for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the
time for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRCs Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Ms. Hartley has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
procedures and guidelines, please contact Mr. Strickland at 817-200-1570 or myself at
817-200-1159.
Sincerely,
/RA/
Vince Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket: 50-482
License: NPF-42
Electronic Distribution to Wolf Creek Nuclear Operating Company
M. Sunseri -3-
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Steven.Reynolds@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
Acting DRP Deputy Director (Barry.Westreich@nrc.gov)
Acting DRS Director (Tom.Blount@nrc.gov)
Acting DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Chris.Long@nrc.gov)
Resident Inspector (Charles.Peabody@nrc.gov)
WC Administrative Assistant - Vacant
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)
Senior Project Engineer, DRP/B (Leonard.Willoughby@nrc.gov)
Project Engineer, DRP/B (David.You@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Randy.Hall@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
R:\_REACTORS\_WC\2013\WC 2013301 exam notify-DGS.docx ML13025A295
ADAMS: No Yes SUNSI Review Complete Reviewer Initials: DGS
Publicly Available Non-Sensitive
Non-publicly Available Sensitive
RIV: SOE C:
DStrickland VGaddy
/RA/ /RA/
1/25/13 1/25/13
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax