On August 12, 2014, the NRC completed its mid-cycle performance review of Wolf Creek Generating Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2013, through June 30, 2014.
O n August 1 2 , 20 14 , t h e NRC co m p l e t ed i t s mid-c y c l e p e r f o rm a n ce r e v i e w of W o l f C r e e k G en e r a t i n g St a t i o n. T he NR C r e v i e w ed t he m o s t recent q u a r t e r l y p e r f o rm a n ce i n di ca t o r s (P Is) i n ad di t i on t o inspe c t i on resu l t s and e n f o r ce m e n t ac t i ons fr o m July 1, 2 013, t h r o u gh June 30, 2014.


This letter informs you of the NRC's assessment of Wolf Creek Generating Station during this period and its plans for future inspections at that facility.
T h i s l e tt e r i n f o r m s y ou o f t h e NRC's ass e s s ment o f W o l f C r eek G en e r a t i n g St a t i on d u r i n g t h i s p e r i od and i t s p l a n s f o r f u t u r e insp e c t i o n s a t t hat f ac ili t y.


The NRC determined that overall, Wolf Creek Generating Station was operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Wolf Creek Generating Station during the most recent quarter was within the Regulatory Response Column of the NRC
The NRC determined that overall, W o l f C r e e k G en e r a t i n g St a t i o n was operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at W o l f C r e e k G en e r a t i n g S t a t i on during the most recent quarter was within the Regulatory Response Column of the NRC
's Reactor Oversight Process (ROP) Action Matrix because of one Greater-than-Green Security Cornerstone input and one White finding in the Emergency Preparedness Cornerstone. The Security issue was described in Inspection Report 05000482/
's Reactor Oversight Process (ROP) Action Matrix because of one Greater-than-Green Security Cornerstone input and one White finding in the Emergency Preparedness Cornerstone. The Security issue was described in Inspection Report 05000482/2014405 (ADAMS ML14069A025)
2014405 (ADAMS ML14069A025)
, and the White Emergency Preparedness finding , associated with a failure to maintain adequate methods for assessing the potential consequences of a radiological emergency condition
, and the White Emergency Preparedness finding, associated with a failure to maintain adequate methods for assessing the potential consequences of a radiological emergency condition
, was described in Inspection Report 05000482/2014503 (ADAMS ML14182A628). The NRC issued a Follow
, was described in Inspection Report 05000482/2014503 (ADAMS ML14182A628)
. The NRC issued a Follow
-Up Assessment letter dated March 26, 2014, (ADAMS ML14085A376)
-Up Assessment letter dated March 26, 2014, (ADAMS ML14085A376)
to inform you of your movement from the Licensee Response Column to the Regulatory Response column of the NRC's Action Matrix
to inform you of your movement from the Licensee Response Column to the Regulatory Response column of the NRC's Action Matrix
.
.
In addition to ROP baseline inspections, the NRC plans to conduct supplemental inspection s in accordance with Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," when you inform us of your readiness for these inspections. The objectives of this inspection procedure are to provide assurance that, for risk-significant performance issues: (1) the root causes and contributing causes are understood; (2) the extent of condition and extent of cause are identified; and (3) the licensee's corrective actions are sufficient to address the root and contributing causes and prevent recurrence. These supplemental inspections will separately review your actions to address the Greater-than-Green Security Cornerstone input and White finding in the Emergency Preparedness Cornerstone
In addition to ROP baseline inspections, the NRC plans to conduct supplemental inspection s in accordance with Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," when you inform us of your readiness for these inspections. The objectives of this inspection procedure are to provide assurance that, for risk-significant performance issues: (1) the root causes and contributing causes are understood; (2) the extent of condition and extent of cause are identified; and (3) the licensee's corrective actions are sufficient to address the root and contributing causes and prevent recurrence. These supplemental inspections will separately review your actions to address the Greater-than-Green Security Cornerstone input and White finding in the Emergency Preparedness Cornerstone. T he NR C a l so issued a C h illi ng E f f e c t Le tt e r (C E L) (ADA M S M L1323 3 A 2 08) t o W o l f C r e e k N uc l ear O p e r a t i n g C o r p o r a t i on on A u g u s t 1 9 , 2 0 1 3. T he CE L w as issued because t he Occup a t i onal S a f e t y and H ea l t h A d mini s tr a t i on (OSHA) had issued a f i n d i n g o f d i s c r i m i n a t i on f o r r a i s i n g s a f e t y conc e r n s a g a i nst a f o r m e r e m p l o y ee of an e n g i n e e r i n g c o n tr a c t or e m p l o y ed by W o l f C r e e k N uc l e a r O p e r a t i n g C o r p or a t ion, and d ue t o t he N R C i de n t i f y i ng t h a t a c h ill ed w o r k e n v i r o n ment e x i s t ed w i t h i n y our f ac ili t y's Q uali t y A ssu rance Gr ou p. Issua n ce o f a CE L m e e t s t he NR C c r i t e r i a i n Insp e c t i on M anu a l C ha p t er (I M C) 0305, "O p e r a t i n g R eac tor Asses s m ent P r o g r a m ," f o r t he i de n t i f i ca t i on o f a c r os s-c u t ti n g t h e m e i n t he a r ea o f s a f e t y consc i ous w o r k e n v i r o n m ent (S C W E). T he NRC has a ssessed y our 3 0-day and 6-m o n t h respo nses t o t he CEL, and conduc t ed a publi c m e e t i n g i n t he R e g i on I V o ff i ce on Jan u a r y 22, 201 4 , t o d iscuss t he a c tions that y ou a r e t a k i n g t o ad d r e s s t he w o r k i n g e n v i r o n m e nt a t y our f ac ili t y. T he NRC has dec ided no t t o open a su b s t a n t i v e c r os s-cu tt i n g issue i n t he a r ea o f S C W E a t t h i s t i me because t he NR C s t a f f d oes not h a v e a conc e r n w i t h y our ac t i o n s. T h i s t h e m e w ill con t i nue t o be r e v i e w ed d u r i ng t he n e x t p er f o rmance as sess m e n t a s w e co n t i n u e t o m o ni t o r your s t a f f's a c t i ons t o en s u r e W o l f C r e e k G en e r a t i n g S t a t i on i s a w o r k p lace t h a t f o s t e r s an e n v i r o n ment w h e r e e m p l o y ees f eel f r e e , and a r e enco u r a ged, t o r a i se s a f e t y conce r n s. The NRC will conduct a follow
. The NRC also issued a Chilling Effect Letter (CEL) (ADAMS ML13233A208) to Wolf Creek Nuclear Operating Corporation on August 19, 2013. The CEL was issued because the Occupational Safety and Health Administration (OSHA) had issued a finding of discrimination for raising safety concerns against a former employee of an engineering contractor employed by Wolf Creek Nuclear Operating Corporation, and due to the NRC identifying that a chilled work environment existed within your facility's Quality Assurance Group. Issuance of a CEL meets the NRC criteria in Inspection Manual Chapter (IMC) 0305, "Operating Reactor Assessment Program," for the identification of a cross-cutting theme in the area of safety conscious work environment (SCWE). The NRC has assessed your 30-day and 6-month responses to the CEL, and conducted a public meeting in the Region IV office on January 22, 2014, to discuss the actions that you are taking to address the working environment at your facility. The NRC has decided not to open a substantive cross-cutting issue in the area of SCWE at this time because the NRC staff does not have a concern with your actions. This theme will continue to be reviewed during the next performance assessment as we continue to monitor your staff's actions to ensure Wolf Creek Generating Station is a workplace that fosters an environment where employees feel free, and are encouraged, to raise safety concerns. The NRC will conduct a follow
-up inspection to review your actions to address the CEL when you inform us of your readiness for inspection.
-up inspection to review your actions to address the CEL when you inform us of your readiness for inspection.


Line 48: Line 45:
-cutting issues in accordance with IMC 0305.
-cutting issues in accordance with IMC 0305.


The enclosed inspection plan lists the inspections scheduled through December 31, 2015. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections scheduled to be conducted during the last nine months are tentative and may be revised based on the results of the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact your staff as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA
T he enc losed insp e c ti on p l an li s t s t he i nspec t i ons s c hed ul ed t h r o u g h December 31, 2 01 5. R o u t i ne inspec t i ons p e r f o r m ed b y r es i de n t insp e c t o r s a r e not i nc l uded i n t he i ns p e c t i on p lan. The inspec t ions sched ul ed t o be cond u c t ed d u r i n g t he last n i ne m o n t hs a r e t e n t a t i v e and m ay be r e v ised based on t he r e s u l t s o f t h e end-of-c y c l e p e r f o rmance r e v i e w. T he N R C p r o v i des t he inspec t i on p l an t o a l l ow f or t he reso l u t i on o f any scheduli ng co n f li c t s and p e rsonnel a v a il abili t y issues. T he NR C w ill con tact y our s t a f f as soon a s poss i b l e t o d iscuss c ha n g es t o t he inspec t i on p l an sho ul d c i r cu m s tances w a rr ant a n y cha n g e s. T h i s insp e c t i o n p l an does not i nc l ude secu r i t y r e l a t ed inspec t ions, w h i ch w ill be sent v i a sep a r a t e , n o n-p ubli c l y a v a il a bl e co rrespond e n c e. In response to the accident at Fukushima, the Commission issued Order EA
-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond
-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond
-Design-Basis External Events," which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond
-Design-Basis External Events," which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond
Line 56: Line 53:
The date for the onsite component at your site is being coordinated with your staff. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.
The date for the onsite component at your site is being coordinated with your staff. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.


In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact Mr. Neil F. O'Keefe at 817-200-1141 with any questions you may have regarding this letter.
I n acc o r danc e w i t h 10 CFR 2.390 o f t he NRC's R ul es o f P r ac t i c e , a copy o f t h i s l e tter w i ll be a v a il a bl e e l ec tr o ni ca ll y f o r publi c insp e c t i on i n t he NR C P ubli c Docu m e n t R oom o r f r o m t he P ubli c l y A v a il a bl e Reco r ds (PAR S) co m pon e n t o f NRC's doc u m en t s y s t e m (A DA M S). ADA M S i s access i b l e f r om t he N R C W e b s i t e a t h tt p://w w w.n r c.g o v/r ead i ng-r m/a d a m s.h tm l (t he P ubli c El ec tr o ni c R ea d i n g R o o m). Please co n t a c t Mr. Neil F. O'Keefe a t 8 1 7-2 0 0-1141 w i t h any q u e s t i ons y ou m ay h a v e r e g a r d i n g t h i s l e t t e r.


Sincerely,/RA/
Sincerely,/RA/
Troy W. Pruett, Acting Director Division of Reactor Projects Docket No.
Troy W. Pruett, Acting Director Di v i s i on of R eac t o r P r o j e c t s Docket No.
: 50-482 License No.
: 50-482 License No.
: NPF-42  
: NPF-42  
Line 66: Line 63:
Wolf Creek Generating Station Inspection/Activity Plan
Wolf Creek Generating Station Inspection/Activity Plan


SUNSI Review By: NOKeefe ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive OFFICE RIV/BC/DRP RIV/D/DRS RIV/D/DRP NAME OKeefe/dll AVegel TPruett SIGNATURE
SUNSI Review By: NOKeefe ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive OFFICE RIV/BC/DRP RIV/D/DRS RIV/D/DRP NAME OKeefe/dll AVegel TPruett SIGNATURE /RA/ /RA/VGaddy for /RA/ DATE 8/21/14 8/25/14 8/25/14 Letter to Adam from Troy W. Pruett dated September 2, 2014
/RA/ /RA/VGaddy for /RA/ DATE 8/21/14 8/25/14 8/25/14 Letter to Adam from Troy W. Pruett dated September 2, 2014


SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2014006) DISTRIBUTION
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2014006) DISTRIBUTION
Line 76: Line 72:
DRS Director (Anton.Vegel@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov
DRS Deputy Director (Jeff.Clark@nrc.gov
) Senior Resident Inspector (Charles.Peabody@nrc.gov)
) Senior Resident Inspector (Charles.Peabody@nrc.gov) Resident Inspector (Raja.Stroble@nrc.gov) Administrative Assistant (Carey.Spoon@nrc.gov) Branch Chief (Neil.O'Keefe@nrc.gov)
Resident Inspector (Raja.Stroble@nrc.gov)
Administrative Assistant (Carey.Spoon@nrc.gov)
Branch Chief (Neil.O'Keefe@nrc.gov)
Senior Project Engineer (David.Proulx@nrc.gov)
Senior Project Engineer (David.Proulx@nrc.gov)
Project Engineer, (Fabian.Thomas@nrc.gov)
Project Engineer, (Fabian.Thomas@nrc.gov)
Line 96: Line 89:
Technical Support Assistant (Loretta.Williams@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov) ROPassessment Resource@nrc.gov ROPreports@nrc.gov OEMail Resource@nrc.gov Electronic Distribution for Wolf Creek Generating Station
ROPassessment Resource@nrc.gov ROPreports@nrc.gov OEMail Resource@nrc.gov Electronic Distribution for Wolf Creek Generating Station


Page 1 of 2 08/22/2014 14:03:38Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteWolf CreekInspection / Activity Plan 09/01/2014
Page 1 of 2 08/22/2014 14:03:38 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteWolf CreekInspection / Activity Plan 09/01/2014
-12/31/2015EXAM-INITIAL OPERATOR EXAM 51 INITIAL EXAM WC(11/2015)
-12/31/2015EXAM-INITIAL OPERATOR EXAM 5 1 INITIAL EXAM WC(11/2015)
X0254910/19/2015 10/23/2015 1 INITIAL EXAM WC(11/2015)
X02549 10/19/2015 10/23/2015 1 INITIAL EXAM WC(11/2015)
X0254911/16/201511/20/2015 INSP-BIENNIAL REQUAL INSPECTION 31 IPLicensed Operator Requalification Program7111111B10/06/2014 10/10/2014 EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION 41 IPFire Protection [Triennial]7111105T10/20/2014 10/24/2014 1 IPFire Protection [Triennial]7111105T11/03/201411/07/2014 EP-1-EP PERFORMANCE INDICATORS 11 IP71151-EP0111/17/201411/21/2014 1 IP71151-EP0211/17/201411/21/2014 1 IP71151-EP0311/17/201411/21/2014 EP-2-EP PROGRAM INSPECTION 11 IPAlert and Notification System Testing711140211/17/201411/21/2014 1 IPEmergency Preparedness Organization Staffing and Augmentation System711140311/17/201411/21/2014 1 IPEmergency Action Level and Emergency Plan Changes711140411/17/201411/21/2014 1 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140511/17/201411/21/2014 RS 13 PI-RADIATION SAFETY 21 IPRadiological Hazard Assessment and Exposure Controls71124.0103/02/2015 03/06/2015 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0303/02/2015 03/06/2015 1 IP71151-OR01 03/02/2015 03/06/2015 1 IP71151-PR01 03/02/2015 03/06/201571111.08-INSERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P03/09/2015 03/20/2015 RS 24-RADIATION SAFETY 21 IPOccupational ALARA Planning and Controls71124.0206/22/2015 06/26/2015 1 IPOccupational Dose Assessment71124.0406/22/2015 06/26/2015 EB1-17T-WC PERMANENT PLANT MODS & 50.59 11 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T07/06/2015 07/17/2015 EP-2-HAB EXERCISE INSPECTION 51 IPEmergency Action Level and Emergency Plan Changes711140411/16/201511/20/2015 1 IPExercise Evaluation - Hostile Action (HA) Event711140711/16/201511/20/2015 EP-3-EP PERFORMANCE INDICATORS 21 IP71151-EP0111/16/201511/20/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
X0254911/16/201511/20/2015 INSP-BIENNIAL REQUAL INSPECTION 3 1 IP Licensed Operator Requalification Program7111111B 10/06/2014 10/10/2014 EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION 4 1 IP Fire Protection [Triennial]7111105T 10/20/2014 10/24/2014 1 IP Fire Protection [Triennial]7111105T11/03/201411/07/2014 EP-1-EP PERFORMANCE INDICATORS 1 1 IP71151-EP0111/17/201411/21/2014 1 IP71151-EP0211/17/201411/21/2014 1 IP71151-EP0311/17/201411/21/2014 EP-2-EP PROGRAM INSPECTION 1 1 IP A lert and Notification System Testing711140211/17/201411/21/2014 1 IP Emergency Preparedness Organization Staffing and Augmentation System711140311/17/201411/21/2014 1 IP Emergency Action Level and Emergency Plan Changes711140411/17/201411/21/2014 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies711140511/17/201411/21/2014 RS 13 PI-RADIATION SAFETY 2 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/02/2015 03/06/2015 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/02/2015 03/06/2015 1 IP71151-OR01 03/02/2015 03/06/2015 1 IP71151-PR01 03/02/2015 03/06/201571111.08-INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 03/09/2015 03/20/2015 RS 24-RADIATION SAFETY 2 1 IP Occupational ALARA Planning and Controls71124.02 06/22/2015 06/26/2015 1 IP Occupational Dose Assessment71124.04 06/22/2015 06/26/2015 EB1-17T-WC PERMANENT PLANT MODS & 50.59 1 1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 07/06/2015 07/17/2015 EP-2-HAB EXERCISE INSPECTION 5 1 IP Emergency Action Level and Emergency Plan Changes711140411/16/201511/20/2015 1 IP Exercise Evaluation - Hostile Action (HA) Event711140711/16/201511/20/2015 EP-3-EP PERFORMANCE INDICATORS 2 1 IP71151-EP0111/16/201511/20/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.


Page 2 of 2 08/22/2014 14:03:38Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteWolf CreekInspection / Activity Plan 09/01/2014
Page 2 of 2 08/22/2014 14:03:38 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteWolf CreekInspection / Activity Plan 09/01/2014
-12/31/2015 EP-3-EP PERFORMANCE INDICATORS 21 IP71151-EP0211/16/201511/20/2015 1 IP71151-EP0311/16/201511/20/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
-12/31/2015 EP-3-EP PERFORMANCE INDICATORS 2 1 IP71151-EP0211/16/201511/20/2015 1 IP71151-EP0311/16/201511/20/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}
}}

Revision as of 12:27, 9 July 2018

Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2014006)
ML14239A622
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/02/2014
From: Pruett T W
NRC/RGN-IV/DRP
To: Heflin A C
Wolf Creek
O'Keefe N F
References
IR-2014-006
Download: ML14239A622 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011

-4511 September 2, 2014 Adam C. Heflin, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR WOLF CREEK GENERATING STATION (REPORT 0500482/2014006)

Dear Mr. Heflin:

O n August 1 2 , 20 14 , t h e NRC co m p l e t ed i t s mid-c y c l e p e r f o rm a n ce r e v i e w of W o l f C r e e k G en e r a t i n g St a t i o n. T he NR C r e v i e w ed t he m o s t recent q u a r t e r l y p e r f o rm a n ce i n di ca t o r s (P Is) i n ad di t i on t o inspe c t i on resu l t s and e n f o r ce m e n t ac t i ons fr o m July 1, 2 013, t h r o u gh June 30, 2014.

T h i s l e tt e r i n f o r m s y ou o f t h e NRC's ass e s s ment o f W o l f C r eek G en e r a t i n g St a t i on d u r i n g t h i s p e r i od and i t s p l a n s f o r f u t u r e insp e c t i o n s a t t hat f ac ili t y.

The NRC determined that overall, W o l f C r e e k G en e r a t i n g St a t i o n was operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at W o l f C r e e k G en e r a t i n g S t a t i on during the most recent quarter was within the Regulatory Response Column of the NRC

's Reactor Oversight Process (ROP) Action Matrix because of one Greater-than-Green Security Cornerstone input and one White finding in the Emergency Preparedness Cornerstone. The Security issue was described in Inspection Report 05000482/2014405 (ADAMS ML14069A025)

, and the White Emergency Preparedness finding , associated with a failure to maintain adequate methods for assessing the potential consequences of a radiological emergency condition

, was described in Inspection Report 05000482/2014503 (ADAMS ML14182A628). The NRC issued a Follow

-Up Assessment letter dated March 26, 2014, (ADAMS ML14085A376)

to inform you of your movement from the Licensee Response Column to the Regulatory Response column of the NRC's Action Matrix

.

In addition to ROP baseline inspections, the NRC plans to conduct supplemental inspection s in accordance with Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," when you inform us of your readiness for these inspections. The objectives of this inspection procedure are to provide assurance that, for risk-significant performance issues: (1) the root causes and contributing causes are understood; (2) the extent of condition and extent of cause are identified; and (3) the licensee's corrective actions are sufficient to address the root and contributing causes and prevent recurrence. These supplemental inspections will separately review your actions to address the Greater-than-Green Security Cornerstone input and White finding in the Emergency Preparedness Cornerstone. T he NR C a l so issued a C h illi ng E f f e c t Le tt e r (C E L) (ADA M S M L1323 3 A 2 08) t o W o l f C r e e k N uc l ear O p e r a t i n g C o r p o r a t i on on A u g u s t 1 9 , 2 0 1 3. T he CE L w as issued because t he Occup a t i onal S a f e t y and H ea l t h A d mini s tr a t i on (OSHA) had issued a f i n d i n g o f d i s c r i m i n a t i on f o r r a i s i n g s a f e t y conc e r n s a g a i nst a f o r m e r e m p l o y ee of an e n g i n e e r i n g c o n tr a c t or e m p l o y ed by W o l f C r e e k N uc l e a r O p e r a t i n g C o r p or a t ion, and d ue t o t he N R C i de n t i f y i ng t h a t a c h ill ed w o r k e n v i r o n ment e x i s t ed w i t h i n y our f ac ili t y's Q uali t y A ssu rance Gr ou p. Issua n ce o f a CE L m e e t s t he NR C c r i t e r i a i n Insp e c t i on M anu a l C ha p t er (I M C) 0305, "O p e r a t i n g R eac tor Asses s m ent P r o g r a m ," f o r t he i de n t i f i ca t i on o f a c r os s-c u t ti n g t h e m e i n t he a r ea o f s a f e t y consc i ous w o r k e n v i r o n m ent (S C W E). T he NRC has a ssessed y our 3 0-day and 6-m o n t h respo nses t o t he CEL, and conduc t ed a publi c m e e t i n g i n t he R e g i on I V o ff i ce on Jan u a r y 22, 201 4 , t o d iscuss t he a c tions that y ou a r e t a k i n g t o ad d r e s s t he w o r k i n g e n v i r o n m e nt a t y our f ac ili t y. T he NRC has dec ided no t t o open a su b s t a n t i v e c r os s-cu tt i n g issue i n t he a r ea o f S C W E a t t h i s t i me because t he NR C s t a f f d oes not h a v e a conc e r n w i t h y our ac t i o n s. T h i s t h e m e w ill con t i nue t o be r e v i e w ed d u r i ng t he n e x t p er f o rmance as sess m e n t a s w e co n t i n u e t o m o ni t o r your s t a f f's a c t i ons t o en s u r e W o l f C r e e k G en e r a t i n g S t a t i on i s a w o r k p lace t h a t f o s t e r s an e n v i r o n ment w h e r e e m p l o y ees f eel f r e e , and a r e enco u r a ged, t o r a i se s a f e t y conce r n s. The NRC will conduct a follow

-up inspection to review your actions to address the CEL when you inform us of your readiness for inspection.

As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspect s were revised. All cross

-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310. Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross

-reference in IMC 0310 during the mid

-cycle assessment review and evaluated for cross

-cutting themes and potential substantive cross

-cutting issues in accordance with IMC 0305.

T he enc losed insp e c ti on p l an li s t s t he i nspec t i ons s c hed ul ed t h r o u g h December 31, 2 01 5. R o u t i ne inspec t i ons p e r f o r m ed b y r es i de n t insp e c t o r s a r e not i nc l uded i n t he i ns p e c t i on p lan. The inspec t ions sched ul ed t o be cond u c t ed d u r i n g t he last n i ne m o n t hs a r e t e n t a t i v e and m ay be r e v ised based on t he r e s u l t s o f t h e end-of-c y c l e p e r f o rmance r e v i e w. T he N R C p r o v i des t he inspec t i on p l an t o a l l ow f or t he reso l u t i on o f any scheduli ng co n f li c t s and p e rsonnel a v a il abili t y issues. T he NR C w ill con tact y our s t a f f as soon a s poss i b l e t o d iscuss c ha n g es t o t he inspec t i on p l an sho ul d c i r cu m s tances w a rr ant a n y cha n g e s. T h i s insp e c t i o n p l an does not i nc l ude secu r i t y r e l a t ed inspec t ions, w h i ch w ill be sent v i a sep a r a t e , n o n-p ubli c l y a v a il a bl e co rrespond e n c e. In response to the accident at Fukushima, the Commission issued Order EA

-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond

-Design-Basis External Events," which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond

-design-basis external event. Additionally, the Commission issued Order EA

-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," which requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. This audit includes an onsite component in order for the NRC to evaluate licensee plans for complying with the Orders, as described in site-specific submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site.

The date for the onsite component at your site is being coordinated with your staff. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.

I n acc o r danc e w i t h 10 CFR 2.390 o f t he NRC's R ul es o f P r ac t i c e , a copy o f t h i s l e tter w i ll be a v a il a bl e e l ec tr o ni ca ll y f o r publi c insp e c t i on i n t he NR C P ubli c Docu m e n t R oom o r f r o m t he P ubli c l y A v a il a bl e Reco r ds (PAR S) co m pon e n t o f NRC's doc u m en t s y s t e m (A DA M S). ADA M S i s access i b l e f r om t he N R C W e b s i t e a t h tt p://w w w.n r c.g o v/r ead i ng-r m/a d a m s.h tm l (t he P ubli c El ec tr o ni c R ea d i n g R o o m). Please co n t a c t Mr. Neil F. O'Keefe a t 8 1 7-2 0 0-1141 w i t h any q u e s t i ons y ou m ay h a v e r e g a r d i n g t h i s l e t t e r.

Sincerely,/RA/

Troy W. Pruett, Acting Director Di v i s i on of R eac t o r P r o j e c t s Docket No.

50-482 License No.
NPF-42

Enclosure:

Wolf Creek Generating Station Inspection/Activity Plan

SUNSI Review By: NOKeefe ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive OFFICE RIV/BC/DRP RIV/D/DRS RIV/D/DRP NAME OKeefe/dll AVegel TPruett SIGNATURE /RA/ /RA/VGaddy for /RA/ DATE 8/21/14 8/25/14 8/25/14 Letter to Adam from Troy W. Pruett dated September 2, 2014

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2014006) DISTRIBUTION

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Steven.Reynolds@nrc.gov)

Acting DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Michael.Hay@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov

) Senior Resident Inspector (Charles.Peabody@nrc.gov) Resident Inspector (Raja.Stroble@nrc.gov) Administrative Assistant (Carey.Spoon@nrc.gov) Branch Chief (Neil.O'Keefe@nrc.gov)

Senior Project Engineer (David.Proulx@nrc.gov)

Project Engineer, (Fabian.Thomas@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

RIV State Liaison Officer (Bill.Maier@nrc.gov)

Project Manager (Fred.Lyon@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

R4DRPBC@nrc.gov R4DRSBC@nrc.gov Director, DIRS, NRR (Scott.Morris@nrc.gov)

Deputy Director, DIRS, NRR (Allen.Howe@nrc.gov)

Acting Director, DORL, NRR (Louise.Lund@nrc.gov

) Acting Deputy Director, DORL (Michael.Markley@nrc.gov)

Director, NSIR/DPR (Rob.Lewis@nrc.gov)

Chief, PLB IV, DORL, NRR (Eric.Oesterle@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (Anthony.Bowers@nrc.gov) ROPassessment Resource@nrc.gov ROPreports@nrc.gov OEMail Resource@nrc.gov Electronic Distribution for Wolf Creek Generating Station

Page 1 of 2 08/22/2014 14:03:38 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteWolf CreekInspection / Activity Plan 09/01/2014

-12/31/2015EXAM-INITIAL OPERATOR EXAM 5 1 INITIAL EXAM WC(11/2015)

X02549 10/19/2015 10/23/2015 1 INITIAL EXAM WC(11/2015)

X0254911/16/201511/20/2015 INSP-BIENNIAL REQUAL INSPECTION 3 1 IP Licensed Operator Requalification Program7111111B 10/06/2014 10/10/2014 EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION 4 1 IP Fire Protection [Triennial]7111105T 10/20/2014 10/24/2014 1 IP Fire Protection [Triennial]7111105T11/03/201411/07/2014 EP-1-EP PERFORMANCE INDICATORS 1 1 IP71151-EP0111/17/201411/21/2014 1 IP71151-EP0211/17/201411/21/2014 1 IP71151-EP0311/17/201411/21/2014 EP-2-EP PROGRAM INSPECTION 1 1 IP A lert and Notification System Testing711140211/17/201411/21/2014 1 IP Emergency Preparedness Organization Staffing and Augmentation System711140311/17/201411/21/2014 1 IP Emergency Action Level and Emergency Plan Changes711140411/17/201411/21/2014 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies711140511/17/201411/21/2014 RS 13 PI-RADIATION SAFETY 2 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/02/2015 03/06/2015 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/02/2015 03/06/2015 1 IP71151-OR01 03/02/2015 03/06/2015 1 IP71151-PR01 03/02/2015 03/06/201571111.08-INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 03/09/2015 03/20/2015 RS 24-RADIATION SAFETY 2 1 IP Occupational ALARA Planning and Controls71124.02 06/22/2015 06/26/2015 1 IP Occupational Dose Assessment71124.04 06/22/2015 06/26/2015 EB1-17T-WC PERMANENT PLANT MODS & 50.59 1 1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 07/06/2015 07/17/2015 EP-2-HAB EXERCISE INSPECTION 5 1 IP Emergency Action Level and Emergency Plan Changes711140411/16/201511/20/2015 1 IP Exercise Evaluation - Hostile Action (HA) Event711140711/16/201511/20/2015 EP-3-EP PERFORMANCE INDICATORS 2 1 IP71151-EP0111/16/201511/20/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 2 08/22/2014 14:03:38 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteWolf CreekInspection / Activity Plan 09/01/2014

-12/31/2015 EP-3-EP PERFORMANCE INDICATORS 2 1 IP71151-EP0211/16/201511/20/2015 1 IP71151-EP0311/16/201511/20/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.