MONTHYEARIR 05000482/20254012025-01-22022 January 2025 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000482/2025401 ML24283A0752024-10-0909 October 2024 Notification of Commercial Grade Dedication Inspection (05000482/2025012) and Request for Information IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) ML24106A1482024-04-15015 April 2024 Notification of Inspection (NRC Inspection Report 05000482/2024003) and Request for Information IR 05000482/20230062024-02-28028 February 2024 Annual Assessment Letter for Wolf Creek Generating Station Report 05000482/2023006 ML24018A1382024-01-18018 January 2024 Inservice Inspection Request for Information IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 IR 05000482/20220062023-03-0101 March 2023 Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2022006) ML22321A2662022-11-16016 November 2022 January 2023 Emergency Preparedness Program Inspection - Request for Information IR 05000482/20220052022-08-23023 August 2022 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2022005) ML22215A2742022-08-0202 August 2022 Inservice Inspection Request for Information ML22249A2552022-06-29029 June 2022 Request for Information for an NRC Post-Approval Site Inspection for License Renewal 05000482/2022012 ML22130A7662022-05-10010 May 2022 Notification of Inspection (NRC Inspection Report 05000482/2022003) and Request for Information IR 05000482/20224012022-05-0303 May 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000482/2022401 ML22123A2702022-05-0303 May 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000482/2022401 IR 05000482/20210062022-03-0202 March 2022 Annual Assessment Letter (Report 05000482/2021006) ML22025A3612022-01-21021 January 2022 PI&R RFI Final ML22019A0932022-01-19019 January 2022 Notification of NRC Evaluations of Changes, Tests and Experiments Inspection (05000482/2022002) and Request for Information ML21322A2952021-11-19019 November 2021 Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (05000482/2022001 and Request for Information ML21237A5212021-09-0101 September 2021 Wc Mid-Cycle Inspection Plan Transmittal Letter 2021 ML21132A1032021-05-12012 May 2021 Document Request List, Paperwork Reduction Act Statement ML21123A0412021-05-0505 May 2021 Notification of NRC Design Bases Assurance Inspection (Teams) (05000482/2021010) and Initial Request for Information IR 05000482/20190062021-03-0303 March 2021 Annual Assessment Letter (Report 05000482/2019006) ML21061A3412021-02-25025 February 2021 Request for Information: Wolf Creek Nuclear Station, Dated February 11, 2021, Inspection Report 05000482/2021002 Occupational Radiation Safety Inspection-1, 2, PI ML21026A1982021-01-26026 January 2021 Inservice Inspection Request for Information ML20104C1472020-04-13013 April 2020 Notification of Inspection (NRC Inspection Report 05000482/2020003) and Request for Information ML20099G9422020-04-0808 April 2020 Notification of NRC Biennial Problem Identification and Resolution Inspection (05000482/2020010) and Initial Request for Information ML20055E1132020-03-0303 March 2020 WC2019006 Annual Assessment Letter ML20024D7072020-01-24024 January 2020 Notification of NRC Design Bases Assurance Inspection (Programs) (05000482/2020011) and Initial Request for Information IR 05000482/20190052019-08-30030 August 2019 Updated Inspection Plan for Wolf Creek Generating Station, Report 05000482/2019005 ML19158A0782019-06-0505 June 2019 Notification of NRC Triennial Heat Sink Performance Inspection (05000482/2019003) and Request for Information IR 05000482/20180062019-03-0404 March 2019 Annual Assessment Letter for Wolf Creek Report 05000482/2018006) ML19043A9462019-02-12012 February 2019 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000482/2019002) and Request for Information IR 05000482/20180052018-08-31031 August 2018 Updated Inspection Plan for Wolf Creek Generating Station, Unit 1, (Inspection Report 05000482/2018005) IR 05000482/20170062018-03-0101 March 2018 Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2017006) ML17311A5182017-11-0101 November 2017 Notification of NRC Inspection of Implementation of Mitigation Strategies Assessment Plans (05000482/2018008) and Request for Information IR 05000482/20170052017-08-28028 August 2017 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2017005) IR 05000482/20160062017-03-0101 March 2017 Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2016006) IR 05000482/20160052016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2016005) ML16237A0732016-08-31031 August 2016 Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2016005) IR 05000482/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Wolf Creek Generating Station (NRC Physical Security Inspection Reports Number 05000482/2016401) ML16085A0532016-03-25025 March 2016 Operating Corp - Notification of NRC Triennial Heat Sink Performance Inspection (05000482/2016002) and Request for Information IR 05000482/20150062016-03-0202 March 2016 Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2015006) IR 05000482/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2015005) ML15015A1712015-01-0808 January 2015 Focused Baseline Inspection at the Wolf Creek Site for a Major Essential Service Water Modification IR 05000482/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for Wolf Creek Generating Station (NRC Physical Security Inspection Report Number 05000482/2014402) IR 05000482/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2014006) ML14231A0682014-08-19019 August 2014 Notification of Inspection (NRC Inspection Report 05000482-14-005) and Request for Information ML14063A6282014-03-0404 March 2014 Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2013001) 2025-01-22
[Table view] Category:Letter
MONTHYEARIR 05000482/20243012025-01-30030 January 2025 Notification of NRC Initial Operator Licensing Examination 05000482/2024301 ML25023A0442025-01-24024 January 2025 Acknowledgement of Response to U.S. Nuclear Regulatory Commission Inspection Report 05000482/2024003 and Disputed Non Cited Violation IR 05000482/20254012025-01-22022 January 2025 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000482/2025401 ML25010A3692025-01-14014 January 2025 Regulatory Audit in Support of Review of License Amendment and Exemption Requests for Risk-Informed Resolution to GSI-191 ML25006A0942025-01-0606 January 2025 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24366A1612024-12-31031 December 2024 Operating Corporations (Wcnocs) Contest Response to Non-Cited Violation 2024003-01 - NRC Inspection Report 05000482/2024003 ML24352A4382024-12-17017 December 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b Commissioners IR 05000482/20240142024-12-17017 December 2024 Comprehensive Engineering Team Inspection Report 05000482/2024014 ML24352A0322024-12-17017 December 2024 Notification of Post Approval Site Inspection for License Renewal and Request for Information ML24347A0122024-12-12012 December 2024 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) 05000482/LER-2024-002-01, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-12-11011 December 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve IR 05000482/20244022024-12-0505 December 2024 Security Baseline Inspection Report 05000482/2024402 ML24337A0132024-12-0202 December 2024 Cycle 27 Core Operating Limits Report, Revision 1 ML24337A1232024-12-0202 December 2024 License Amendment Request to Modify the Implementation Date of License Amendment No. 239 ML24332A1262024-11-27027 November 2024 Notice of Intent to Contest Non-Cited Violation (NCV) 05000482/2024003-01, and Request for Additional Time to Provide Wolf Creek Nuclear Operating Corporation’S (WCNOC) NCV Response ML24306A2192024-11-0101 November 2024 Results of the Steam Generator Tube Inservice Inspection During the 26th Refueling Outage to Reflect TSTF-577 Reporting Requirements IR 05000482/20240032024-11-0101 November 2024 Integrated Inspection Report 05000482/2024003 ML24295A3792024-11-0101 November 2024 Integrated Inspection Report 05000482/2024003 IR 05000482/20244202024-10-31031 October 2024 Security Baseline Inspection Report 05000482/2024420 ML24296B1902024-10-22022 October 2024 10 CFR 50.55a Requests for the Fifth Ten-Year Interval Inservice Testing Program 05000482/LER-2024-001-01, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-10-22022 October 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing 05000482/LER-2024-002, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-10-21021 October 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24283A0752024-10-0909 October 2024 Notification of Commercial Grade Dedication Inspection (05000482/2025012) and Request for Information ML24199A1712024-09-17017 September 2024 Issuance of Amendment No. 241 Revise Ventilation Filter Testing Program Criteria and Administrative Correction of Absorber in Technical Specification 5.5.11 ML24260A0712024-09-12012 September 2024 License Amendment Request for a Risk-Informed Resolution to GSI-191 IR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24248A2492024-09-0404 September 2024 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 26 Owner’S Activity Report ML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML24241A2212024-08-29029 August 2024 Notice of Enforcement Discretion for Wolf Creek Generating Station ML24240A2642024-08-27027 August 2024 Corporation - Request for Notice of Enforcement Discretion Regarding Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 05000482/LER-2024-001, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-07-0202 July 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) ML24150A0562024-05-29029 May 2024 Foreign Ownership, Control or Influence (FOCI) Information – Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML23345A1602024-05-0909 May 2024 Revision of Safety Evaluation for Amendment No. 237 Request for Deviation from Fire Protection Requirements ML24089A2622024-04-29029 April 2024 Financial Protection Levels ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24118A0022024-04-27027 April 2024 Wolf Generating Nuclear Station - 2023 Annual Radiological Environmental Operating Report ML24113A1882024-04-19019 April 2024 Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML24109A1842024-04-18018 April 2024 Cycle 27 Core Operating Limits Report 2025-01-06
[Table view] |
Text
March 1, 2017
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2016006)
Dear Mr. Heflin:
On February 16, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance assessment of Wolf Creek Generating Station, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016, through December 31, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
The NRC determined the performance at Wolf Creek Generating Station during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
Although plant performance was within the Licensee Response Column, the NRC has not yet finalized the significance of one or more findings in the Security cornerstone. The final safety significance determination(s) may affect the NRCs assessment of plant performance and the enclosed inspection plan.
The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. On June 30, 2016, the NRC completed a Problem Identification and Resolution inspection at Wolf Creek Generating Station, (Agencywide Documents Access and Management System (ADAMS) Accession No.
ML16222A733), which identified safety conscious work environment challenges in the Security Department. This inspection plan includes an in-depth problem identification and resolution sample that the NRC plans to perform during the week of August 28, 2017, to assess the Security Departments progress in improving the safety conscious work environment.
.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 817-200-1141 with any questions you have regarding this letter.
Sincerely,
/RA/
Nicholas H. Taylor, Chief Projects Branch B Division of Reactor Projects Docket No.: 50-482 License No.: NPF-42 Enclosure:
Wolf Creek Generating Station Inspection/Activity Plan
SUNSI Review:
ADAMS:
Non-Publicly Available Non-Sensitive Keyword:
By: NTaylor/dll Yes No Publicly Available Sensitive NRC-002 OFFICE RIV/DRP:C DRS:D DRP:DD NAME NTaylor AVegel RLantz SIGNATURE
/RA/
/RA/
/RA/
DATE 2/23/17 2/23/17 2/23/17
Wolf Creek Inspection / Activity Plan 01/01/2017 - 12/31/2018 Unit Number Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title Page 1 of 2 02/23/2017 11:49:24
INIT EXA
- INITIAL EXAM
10/16/2017 10/20/2017 X02597 INITIAL EXAM WOLF CREEK (11/2017)
11/06/2017 11/10/2017 X02597 INITIAL EXAM WOLF CREEK (11/2017)
EB1-21N
- WC DESIGN BASIS INSPECTION PROGRAMS
05/08/2017 05/26/2017 IP 7111121N Component Design Bases Inspection (Programs)
RS 13 PI
- RADIATION SAFETY
05/08/2017 05/12/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
05/08/2017 05/12/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation
05/08/2017 05/12/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness
05/08/2017 05/12/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences
RS 24
- RADIATION SAFETY
06/12/2017 06/16/2017 IP 71124.02 Occupational ALARA Planning and Controls
06/12/2017 06/16/2017 IP 71124.04 Occupational Dose Assessment
EB2-05T
- TRIENNIAL FIRE PROTECTION INSPECTION
10/02/2017 10/06/2017 IP 7111105T Fire Protection [Triennial]
10/16/2017 10/20/2017 IP 7111105T Fire Protection [Triennial]
EP-2
- BIENNIAL EP EXERCISE INSPECTION
11/13/2017 11/17/2017 IP 7111401 Exercise Evaluation
11/13/2017 11/17/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes
EP-3
- EP PERFORMANCE INDICATOR VERIFICATION
11/13/2017 11/17/2017 IP 71151-EP01 Drill/Exercise Performance
11/13/2017 11/17/2017 IP 71151-EP02 ERO Readiness
11/13/2017 11/17/2017 IP 71151-EP03 Alert & Notification System Reliability
RS 12PI
- RAD SAFETY
04/02/2018 04/06/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
04/02/2018 04/06/2018 IP 71124.02 Occupational ALARA Planning and Controls
04/02/2018 04/06/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness
04/02/2018 04/06/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences
7111108
- INSERVICE INSPECTION
04/02/2018 04/13/2018 IP 7111108P Inservice Inspection Activities - PWR
INSP
- BRQ INSPECTION
06/04/2018 06/08/2018 IP 7111111B Licensed Operator Requalification Program This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Wolf Creek Inspection / Activity Plan 01/01/2017 - 12/31/2018 Unit Number Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title Page 2 of 2 02/23/2017 11:49:24
EB1-21M
- WC DESIGN BASES INSPECTION TEAMS
07/16/2018 08/03/2018 IP 7111121M Component Design Bases Inspection (Teams)
RS 5678
- RAD SAFETY
08/20/2018 08/24/2018 IP 71124.05 Radiation Monitoring Instrumentation
08/20/2018 08/24/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment
08/20/2018 08/24/2018 IP 71124.07 Radiological Environmental Monitoring Program
08/20/2018 08/24/2018 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
EP-1
- EP PROGRAM INSPECTION
09/17/2018 09/21/2018 IP 7111402 Alert and Notification System Testing
09/17/2018 09/21/2018 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System
09/17/2018 09/21/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes
09/17/2018 09/21/2018 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies
09/17/2018 09/21/2018 IP 71151-EP01 Drill/Exercise Performance
09/17/2018 09/21/2018 IP 71151-EP02 ERO Readiness
09/17/2018 09/21/2018 IP 71151-EP03 Alert & Notification System Reliability Comments:
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.