| ==Dear Mr. Myers:== | | ==Dear Mr. Myers:== |
|
| |
|
| The NRC staff, with technical assistance from its contractor, the Idaho National Engineering and Environmental Laboratory (INEEL), has reviewed and evaluated the information provided by The Cleveland Electric Illuminating Company in its letter dated June 28, 1996, related to the first 10-year interval inservice inspection program plan requests for relief for Perry Nuclear Power Plant, Unit No.1. Additional information was provided by letter dated February 12, 1997. | | The NRC staff, with technical assistance from its contractor, the Idaho National Engineering and Environmental Laboratory (INEEL), has reviewed and evaluated the information provided by The Cleveland Electric Illuminating Company in its {{letter dated|date=June 28, 1996|text=letter dated June 28, 1996}}, related to the first 10-year interval inservice inspection program plan requests for relief for Perry Nuclear Power Plant, Unit No.1. Additional information was provided by {{letter dated|date=February 12, 1997|text=letter dated February 12, 1997}}. |
| For Requests for Relief IR-005 and IR-021, the staff has concluded that the American Society of Mechanical Engineers (ASME) Code requirements are impractical and, therefore, the reliefs remain granted pursuant to 10 CFR 50.55a(g)(6)(1). | | For Requests for Relief IR-005 and IR-021, the staff has concluded that the American Society of Mechanical Engineers (ASME) Code requirements are impractical and, therefore, the reliefs remain granted pursuant to 10 CFR 50.55a(g)(6)(1). |
| For Requests for Relief IR-028 and IR-029, the staff has concluded that compliance with the ASME Code requirements would result in hardship without a i | | For Requests for Relief IR-028 and IR-029, the staff has concluded that compliance with the ASME Code requirements would result in hardship without a i |
Line 53: |
Line 53: |
| ==Dear Mr. Myers:== | | ==Dear Mr. Myers:== |
|
| |
|
| The NRC staff, with technical assistance from its contractor, the Idaho National Engineering and Environmental Laboratory (INEEL), has reviewed and evaluated the information provided by The Cleveland Electric Illuminating Company in its letter dated June 28, 1996, related to the first 10-year interval inservice inspection program plan requests for relief for Perry Nuclear Power Plant, Unit No.1. Additional information was provided by letter dated February 12, 1997. | | The NRC staff, with technical assistance from its contractor, the Idaho National Engineering and Environmental Laboratory (INEEL), has reviewed and evaluated the information provided by The Cleveland Electric Illuminating Company in its {{letter dated|date=June 28, 1996|text=letter dated June 28, 1996}}, related to the first 10-year interval inservice inspection program plan requests for relief for Perry Nuclear Power Plant, Unit No.1. Additional information was provided by {{letter dated|date=February 12, 1997|text=letter dated February 12, 1997}}. |
| For Requests for Relief IR-005 and IR-021, the staff has concluded that the American Society of Mechanical Engineers (ASME) Code requirements are impractical and, therefore, the reliefs remain granted pursuant to 10 CFR 50.55a(g)(6)(i). | | For Requests for Relief IR-005 and IR-021, the staff has concluded that the American Society of Mechanical Engineers (ASME) Code requirements are impractical and, therefore, the reliefs remain granted pursuant to 10 CFR 50.55a(g)(6)(i). |
| l l For Requests for Relief IR-028 and IR-029, the staff has concluded that l compliance with the ASME Code requirements would result in hardship without a compensating increase in the level of quality and safety. Additionally, the licensee's proposed alternatives will provide reasonable assurance of the operational readiness of the subject systems. Therefore, the licensee's i proposed alternatives are authorized pursuant to 10 CFR 50.55a(a)(3)(ii). : | | l l For Requests for Relief IR-028 and IR-029, the staff has concluded that l compliance with the ASME Code requirements would result in hardship without a compensating increase in the level of quality and safety. Additionally, the licensee's proposed alternatives will provide reasonable assurance of the operational readiness of the subject systems. Therefore, the licensee's i proposed alternatives are authorized pursuant to 10 CFR 50.55a(a)(3)(ii). : |
Line 85: |
Line 85: |
| 1 The NRC staff, with technical assistance from its contractor, the Idaho National Engineering and Ewironmental Laboratory (INEEL), has reviewed and i | | 1 The NRC staff, with technical assistance from its contractor, the Idaho National Engineering and Ewironmental Laboratory (INEEL), has reviewed and i |
| evaluated the information provided by The Cleveland Electric Illuminating | | evaluated the information provided by The Cleveland Electric Illuminating |
| . Company in its letter dated June 28, 1996, related to the first 10-year interval inservice inspection program plan requests for relief for Perry | | . Company in its {{letter dated|date=June 28, 1996|text=letter dated June 28, 1996}}, related to the first 10-year interval inservice inspection program plan requests for relief for Perry |
| . Nuclear Power Plant, Unit No. 1. Additional information was provided by | | . Nuclear Power Plant, Unit No. 1. Additional information was provided by |
| < letter dated February 12, 1997. | | < {{letter dated|date=February 12, 1997|text=letter dated February 12, 1997}}. |
| For Requests for Relief IR-005 and IR-021, the staff has concluded that the American Society of Mechanical Engineers (ASME) Code requirements are i | | For Requests for Relief IR-005 and IR-021, the staff has concluded that the American Society of Mechanical Engineers (ASME) Code requirements are i |
| impractical and, therefore, the reliefs remain granted pursuant to 10 CFR 50.55a(g)(6)(i). , | | impractical and, therefore, the reliefs remain granted pursuant to 10 CFR 50.55a(g)(6)(i). , |
Letter Sequence Approval |
---|
|
|
MONTHYEARML20133J6221997-01-15015 January 1997 Forwards RAI to Complete Review of Licensee 960628 Submittal Re Request for Relief from ASME Code,Section XI Requirements for Plant,Unit 1 Project stage: RAI ML20141L9091997-05-27027 May 1997 Forwards SE & Technical Ltr Rept Accepting Licensee Relief Requests for First 10-yr Interval Inservice Insp Program Plan for Plant,Unit 1 Project stage: Approval 1997-01-15
[Table View] |
Similar Documents at Perry |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARPY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl1999-10-14014 October 1999 Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl ML20217F3901999-10-14014 October 1999 Discusses Request That Proprietary Document NEDE-32907P,DRF A22-0084-53, Safety Analysis Rept for Perry NPP 5% Power Uprate, Class III Dtd Sept 1999 Be Withheld.Determined Document Proprietary & Will Be Withheld ML20217G9201999-10-14014 October 1999 Discusses Utils Request for Approval of Quality Assurance Program Changes PY-CEI-NRR-2435, Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect1999-10-13013 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect ML20212K9271999-09-30030 September 1999 Refers to 990927 Meeting Conducted at Perry Nuclear Power Plant to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff ML20212J1451999-09-30030 September 1999 Forwards Order,In Response to 990505 Application PY-CEI/NRR- 2394L.Order Approves Conforming License Amend Which Will Be Issued & Made Effective When Transfer Completed ML20217E7111999-09-30030 September 1999 Documents Telcon Conducted on 990929 Between M Underwood of Oh EPA & D Tizzan of Pnpp,Re Request to Operate Pnpp Sws,As Is,Until Resolution Can Be Obtained ML20212G4161999-09-24024 September 1999 Informs of Completion of Licensing Action for Generic Ltr 98-01, Y2K Readiness of Computer Systems at Nuclear Power Plants, for Perry Nuclear Power Plant ML20212G5811999-09-23023 September 1999 Informs That Licenses for Ta Lentz,License SOP-31449,PJ Arthur,License SOP-30921-1 & Dp Mott,License SOP-31500 Are Considered to Have Expired,Iaw 10CFR50.74(a),10CFR55.5 & 10CFR55.55 PY-CEI-NRR-2432, Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-21021 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams PY-CEI-NRR-2428, Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions1999-09-16016 September 1999 Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions ML20212D0151999-09-14014 September 1999 Requests Cancellation of NPDES Permit 3II00036.Permit Has Been Incorporated in Permit 3IB00016*ED.Discharge Point Sources & Associated Fees Currently Covered Under Permit 3IB00016*ED ML20212A8371999-09-13013 September 1999 Forwards Insp Rept 50-440/99-13 on 990712-30 & Notice of Violation.Insp Included Evaluation of Engineering Support, Design Change & Modification Activities,Internal Assessment Activities & Corrective Actions ML20217A8971999-09-0909 September 1999 Forwards Insp Rept 50-440/99-09 on 990709-0825.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy PY-CEI-NRR-2431, Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages1999-09-0909 September 1999 Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages ML20211Q6911999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Perry Operator License Applicants During Wks of 010108 & 15.Validation of Exam Will Occur at Station During Wk of 001218 IR 05000440/19990011999-08-31031 August 1999 Requests That Page Number 4, P2 Status of EP Facilities, Equipment & Resources, of Insp Rept 50-440/99-01 Be Replaced with Encl Rev PY-CEI-NRR-2425, Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.21999-08-26026 August 1999 Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.2 PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl1999-08-19019 August 1999 Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl ML20210Q8421999-08-13013 August 1999 First Final Response to FOIA Request for Documents.Records Listed in App a Being Released in Entirety & Records Listed in App B Being Withheld in Part (Ref FOIA Exempt 5) ML20210R7861999-08-12012 August 1999 Forwards Insp Rept 50-440/99-12 on 990712-16.No Violations Noted.New Emergency Preparedness Program Staff & Mgt Personnel Were Professional & Proactive ML20210S3961999-08-11011 August 1999 Requests That Ten Listed Individuals Be Registered to Take 991006 BWR Gfes of Written Operating Licensing Exam.Two Listed Personnel Will Have Access to Exams Before Exams Are Administered PY-CEI-NRR-2423, Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready1999-08-10010 August 1999 Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready PY-CEI-NRR-2421, Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-9906301999-08-10010 August 1999 Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-990630 ML20210Q7981999-08-10010 August 1999 Informs That Intention to Utilize Sulfuric Acid in Pnpp Circulating Water Sys to Lower Ph Is Anticipated to Be Completed in Nov ML20210Q5831999-08-10010 August 1999 Requests Permission to Chemically Treat CWS for Algae Due to Cooling Water Basin Becoming Infected with Algae of Various Types PY-CEI-NRR-2422, Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 9808261999-08-10010 August 1999 Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 980826 ML20210K6331999-08-0404 August 1999 Submits Response to Requests for Addl Info to GL 92-01,Rev 1, Reactor Vessel Structural Integrity, for Perry Nuclear Plant,Unit 1 PY-CEI-NRR-2417, Forwards NP0059-007, Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval, IAW ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,Article IWA-60001999-08-0202 August 1999 Forwards NP0059-007, Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval, IAW ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,Article IWA-6000 ML20210G8411999-07-28028 July 1999 Informs That Based on Determination That Rev 14 Changes to Various Portions of Perry Nuclear Power Plant Emergency Plan Does Not Decrease Effectiveness of Licensee Emergency Plan & Meets Standard of 10CFR50.47(b),no NRC Approval Required ML20210E0661999-07-22022 July 1999 Forwards Insp Rept 50-440/99-08 on 990518-0708.No Violations Noted.Overall Conduct of Activities at Perry Facility, Conservative & Professional with Continuing Focus on Safety PY-CEI-NRR-2419, Forwards Four Copies of Rev 27 to Pnpp Security Plan,Per 10CFR50.54(p)(2).Changes Have Been Determined Not to Decrease Effectiveness of Security Plan.Rev Withheld1999-07-21021 July 1999 Forwards Four Copies of Rev 27 to Pnpp Security Plan,Per 10CFR50.54(p)(2).Changes Have Been Determined Not to Decrease Effectiveness of Security Plan.Rev Withheld PY-CEI-NRR-2415, Submits Estimate of Number of Licensing Submittal for FY00 & 01,for Pnpp,Per Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-19019 July 1999 Submits Estimate of Number of Licensing Submittal for FY00 & 01,for Pnpp,Per Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates ML20210A6441999-07-15015 July 1999 Advises That Listed Operator Licenses for Company Personnel Have Expired,As of 990715,per 10CFR50.74(a) & 10CFR55.5. Individuals Listed Have Assumed Responsibilities at Pnpp That Do Not Require Operator Licenses ML20209E5951999-07-0909 July 1999 Ltr Contract:Task Order 46, Perry Engineering & Technical Support (E&Ts) Insp, Under Contract NRC-03-98-021 ML20209D5931999-07-0101 July 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Investigation Rept 3-98-005 Issued on 990510.Corrective Actions Will Be Examined During Future Inspections ML20211A3881999-06-30030 June 1999 Supplements Re NRC Incomprehensible Enforcement Inactions.Understands That NRC Claiming Hands Tied in Matter Re Discrimination Violation at Perry Npp.Requests That NRC Take Listed Two Actions PY-CEI-NRR-2410, Submits Response to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Attachment 1 Provides Y2K Readiness Disclosure for Plant1999-06-29029 June 1999 Submits Response to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Attachment 1 Provides Y2K Readiness Disclosure for Plant PY-CEI-NRR-2413, Advises That Jk Wood Will Replace Lw Myers as Pnpp,Vice President - Nuclear,Effective 9907061999-06-29029 June 1999 Advises That Jk Wood Will Replace Lw Myers as Pnpp,Vice President - Nuclear,Effective 990706 PY-CEI-NRR-2403, Submits Response to RAI Re GL 96-05 Program at Plant1999-06-29029 June 1999 Submits Response to RAI Re GL 96-05 Program at Plant ML20196H9641999-06-29029 June 1999 Confirms 990615 Telcon Request with J Lieberman for Addl Time to Respond to Enforcement Action 99-012.FirstEnergy Has 60 Days to Respond to EA PY-CEI-NRR-2412, Forwards Perry Nuclear Plant Simulator Four Yr Test Rept & NRC Form 474, Simulation Facility Certification, Which Describes Tests Conducted from June 1995-19991999-06-28028 June 1999 Forwards Perry Nuclear Plant Simulator Four Yr Test Rept & NRC Form 474, Simulation Facility Certification, Which Describes Tests Conducted from June 1995-1999 ML20211A3991999-06-28028 June 1999 Submits Concerns Re Proposed Changes to Enforcement Policy. Believes That NRC Existing Regulations & Policies Provide Adequate Controls & That NRC Not Administering Consistent Enforcement Policies in Response to Discriminatory Actions ML20196A6601999-06-16016 June 1999 Forwards Master Decommissioning Trust Agreements Revised After 1990 for Ohio Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & Pennsylvania Power Co Re Bvnps,Units 1 & 2,DBNPS,Unit 1 & Perry Unit 1 PY-CEI-NRR-2405, Informs NRC That Pnpp Staff Has Implemented Formal Industry Position on Severe Accident Mgt1999-06-14014 June 1999 Informs NRC That Pnpp Staff Has Implemented Formal Industry Position on Severe Accident Mgt ML20195H9051999-06-10010 June 1999 Forwards Two License Renewal Applications Consisting of NRC Form 398 & NRC Form 396 for Bk Carrier,License OP-30997 & Jt Steward,License OP-30564-1 ML20212H5841999-06-10010 June 1999 Responds to NRC Notice of Level III Violation Received by K Wierman.Corrective Actions:K Wierman Has Been Dismissed from Position at Perry NPP PY-CEI-NRR-2408, Forwards Rev 4 to Pump & Valve Inservice Testing Program Plan, Incorporating Changes to Program to Implement Second Ten Yr Insp Interval1999-06-10010 June 1999 Forwards Rev 4 to Pump & Valve Inservice Testing Program Plan, Incorporating Changes to Program to Implement Second Ten Yr Insp Interval ML20195G6741999-06-10010 June 1999 Forwards Insp Rept 50-440/99-03 on 990407-0517.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy PY-CEI-NRR-2407, Responds to NRC Re Violations Noted in Investigations Rept 3-98-005.Corrective Actions:Initiated Internal Investigation Into Matter to Discover Party Responsible for Falsification of Training Records1999-06-0909 June 1999 Responds to NRC Re Violations Noted in Investigations Rept 3-98-005.Corrective Actions:Initiated Internal Investigation Into Matter to Discover Party Responsible for Falsification of Training Records 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217F3901999-10-14014 October 1999 Discusses Request That Proprietary Document NEDE-32907P,DRF A22-0084-53, Safety Analysis Rept for Perry NPP 5% Power Uprate, Class III Dtd Sept 1999 Be Withheld.Determined Document Proprietary & Will Be Withheld ML20217G9201999-10-14014 October 1999 Discusses Utils Request for Approval of Quality Assurance Program Changes ML20212K9271999-09-30030 September 1999 Refers to 990927 Meeting Conducted at Perry Nuclear Power Plant to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff ML20212J1451999-09-30030 September 1999 Forwards Order,In Response to 990505 Application PY-CEI/NRR- 2394L.Order Approves Conforming License Amend Which Will Be Issued & Made Effective When Transfer Completed ML20212G4161999-09-24024 September 1999 Informs of Completion of Licensing Action for Generic Ltr 98-01, Y2K Readiness of Computer Systems at Nuclear Power Plants, for Perry Nuclear Power Plant ML20212A8371999-09-13013 September 1999 Forwards Insp Rept 50-440/99-13 on 990712-30 & Notice of Violation.Insp Included Evaluation of Engineering Support, Design Change & Modification Activities,Internal Assessment Activities & Corrective Actions ML20217A8971999-09-0909 September 1999 Forwards Insp Rept 50-440/99-09 on 990709-0825.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211Q6911999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Perry Operator License Applicants During Wks of 010108 & 15.Validation of Exam Will Occur at Station During Wk of 001218 IR 05000440/19990011999-08-31031 August 1999 Requests That Page Number 4, P2 Status of EP Facilities, Equipment & Resources, of Insp Rept 50-440/99-01 Be Replaced with Encl Rev ML20210Q8421999-08-13013 August 1999 First Final Response to FOIA Request for Documents.Records Listed in App a Being Released in Entirety & Records Listed in App B Being Withheld in Part (Ref FOIA Exempt 5) ML20210R7861999-08-12012 August 1999 Forwards Insp Rept 50-440/99-12 on 990712-16.No Violations Noted.New Emergency Preparedness Program Staff & Mgt Personnel Were Professional & Proactive ML20210K6331999-08-0404 August 1999 Submits Response to Requests for Addl Info to GL 92-01,Rev 1, Reactor Vessel Structural Integrity, for Perry Nuclear Plant,Unit 1 ML20210G8411999-07-28028 July 1999 Informs That Based on Determination That Rev 14 Changes to Various Portions of Perry Nuclear Power Plant Emergency Plan Does Not Decrease Effectiveness of Licensee Emergency Plan & Meets Standard of 10CFR50.47(b),no NRC Approval Required ML20210E0661999-07-22022 July 1999 Forwards Insp Rept 50-440/99-08 on 990518-0708.No Violations Noted.Overall Conduct of Activities at Perry Facility, Conservative & Professional with Continuing Focus on Safety ML20209E5951999-07-0909 July 1999 Ltr Contract:Task Order 46, Perry Engineering & Technical Support (E&Ts) Insp, Under Contract NRC-03-98-021 ML20209D5931999-07-0101 July 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Investigation Rept 3-98-005 Issued on 990510.Corrective Actions Will Be Examined During Future Inspections ML20196H9641999-06-29029 June 1999 Confirms 990615 Telcon Request with J Lieberman for Addl Time to Respond to Enforcement Action 99-012.FirstEnergy Has 60 Days to Respond to EA ML20195G6741999-06-10010 June 1999 Forwards Insp Rept 50-440/99-03 on 990407-0517.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20207G3921999-06-0808 June 1999 Forwards Notice of Consideration of Approval of Transfer of License DPR-58 & Issuance of Conforming Amend & Opportunity for Hearing Re 990505 Application ML20207B7341999-05-26026 May 1999 Forwards Correction of Typo in TS Table 3.3.6.1-1 for Plant, Unit 1 DD-99-08, Informs That to Extent That Union of Concerned Scientists Requests Commission Undertake Formal Review of DD-99-08 & Hold Meeting to Directly Receive View on Decision,Request Denied.With Certificate of Svc.Served on 9905211999-05-20020 May 1999 Informs That to Extent That Union of Concerned Scientists Requests Commission Undertake Formal Review of DD-99-08 & Hold Meeting to Directly Receive View on Decision,Request Denied.With Certificate of Svc.Served on 990521 ML20207B1251999-05-20020 May 1999 Discusses Investigation Rept 3-98-007 on 981210 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $110,000 IR 05000440/19980181999-05-14014 May 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-440/98-18 on 981110 ML20206Q5181999-05-14014 May 1999 Responds to to SL Hiatt Re Fee Exemption Granted to Firstenergy Nuclear Operating Co,Operator of Perry Nuclear Plant.Action Consistent with Longstanding Policy & Practice,As Well as Legal Requirements ML20196F8081999-05-12012 May 1999 Partially Deleted Ltr Referring to Investigation Case 3-1998-007 Re Determination Whether Recipient Discriminated Against Radiation Protection Supervisor at Perry for Providing Testimony as Witness in DOL Hearing ML20206Q0171999-05-12012 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Management Created ML20206S5381999-05-12012 May 1999 Forwards Insp Rept 50-440/99-07 on 990412-16.No Violations Noted.Insp Consisted of Selective Exam of Procedures & Representative Records,Interviews with Personnel & Observation of Activities in Progress ML20206Q2111999-05-10010 May 1999 Discusses Investigation Rept 3-98-005,completed on 990129 & Forwards NOV & OI Rept Synopsis.Circumstances Surrounding Apparent Falsification of Training Records for Individuals Assigned Position in Er Organization Were Investigated ML20196A2961999-05-10010 May 1999 Discusses Investigation Rept 3-98-005 Conducted on 990129 Re Circumstances Surrounding Apparent Falsification of Training Records for Individuals Assigned Positions in Emergency Response Organization & Forwards NOV & Synopsis ML20206H3981999-05-0606 May 1999 Forwards Insp Rept 50-440/99-06 on 990303-04 & 0412-16.No Violations Noted.Inservice Insp Activities Effectively Implemented with Several Aspects Demonstrating Good Safety Focus ML20206N3161999-05-0606 May 1999 Responds to Ltr to NRC on Continued Events Re Transfer of Generation Assets Between Dl & Firstenergy.Info Will Be Considered as NRC Monitor Pending License Transfer Application of Bvps,Units 1 & 2 & Pnpp ML20206H6731999-05-0505 May 1999 Confirms Discussion Between Members of NRC & Recipient Re Meeting Scheduled for 990520 in Lisle,Il to Discuss Operational Issues & Related Topics of Interest to Licensed Operators at Nuclear Power Plants Located in Region III ML20206G6901999-05-0303 May 1999 Forwards Insp Rept 50-440/99-02 on 990225-0406.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20206G6401999-05-0303 May 1999 Forwards Safety Evaluation Authorizing Relief Requests IR-032 to IR-035 & IR-037 to IR-040 Re Implementation of Subsections IWE & Iwl of ASME Section XI for Containment Insp.Relief Requests IR-36 & IR-41 Withdrawn ML20206D4701999-04-30030 April 1999 Informs That on 990428,FirstEnergy Submitted Post Exam Results of Weld Overlay Repair for Feedwater Nozzle to safe-end Weld at Perry Nuclear Power Plant,Unit 1 (Pnpp) ML20206E2111999-04-29029 April 1999 Discusses Alternative Proposed by Licensee on 990325 & 990401 to ASME BPV Code,Section XI Repair Requirements Along with Separate Alternative to Ultrasonic Exam Acceptance Criteria.Forwards SE Approving Proposed Alternatives ML20205P4041999-04-15015 April 1999 Discusses GL 95-07 Issued by NRC on 950817 & Licensee Responses Submitted on 951016,960213 & 960624 for Perry NPP, Unit 1.Forwards Safety Evaluation Concluding That Licensee Adequately Addressed Actions Requested in GL 95-07 ML20205P0281999-04-12012 April 1999 Provides Individual Exam Results for Applicants Who Took Mar 1999 Initial License Exam.Information Considered Proprietary in Accordance with 10CFR2.790.Without Encls ML20205J5331999-04-0606 April 1999 Ack Receipt of Denying Request from NRC That Addl Info Be Provided Prior to Informal Public Hearing Held on 990222 Re River Bend Station & Perry Nuclear Power Plant 10CFR2.206 Petitions ML20205K5211999-04-0505 April 1999 Forwards Notice of Withdrawal of 970409 LAR on Refueling Interlocks,In Response to Util .Amend Request Will Be Replaced in Future by Similar Request,Based on Approved STS Change Traveler,Number TSTF-225 ML20196K8461999-04-0202 April 1999 Forwards Insp Rept 50-440/99-05 on 990301-05.No Violations Noted.Informs That Licensee Use of 10-Minute Rule & 4-Hour Rule Remains Under NRC Review.Expresses Re Practice Revising Unavailability Criteria on Recurrent Basis ML20205G3891999-03-31031 March 1999 Forwards Safety Evaluation Re Second ten-year Inservice Testing Program Relief Requests.Proposed Alternatives in Relief Requests VR-6,PR-3 & PR-6 May Be Authorized.Relief Request VR-8 Denied ML20205G0441999-03-26026 March 1999 Advises of Planned Insp Effort Resulting from Perry PPR Review,Which Was Completed on 990202.Overall,performance at Perry Was Acceptable ML20205F0011999-03-25025 March 1999 Responds to Re Safety of Perry Nuclear Power Plant & That Plant Operating with Limited Leaks in Three Fuel Rods for Several Months.Informal Public Hearing Re Leaks at Perry Facility Held in Rockville,Md on 990222 ML20205C1611999-03-25025 March 1999 Discusses GL 96-05 Issued on 960918 & Firstenergy 961118, 970317 & 980930 Responses to GL 96-05 Indicating Intent to Implement Provisions of JOG Program on MOV Periodic Verification at Perry Npp.Forwards RAI Re GL 96-05 Program ML20204D8891999-03-17017 March 1999 Forwards Insp Rept 50-440/99-04 on 990222-26.No Violations Noted.Insp Focused on Radiological Planning for Spring 1999 Refueling Outage,On Assessments of Radiation Protection Program & on Radiological Training for General Employees ML20204E7791999-03-17017 March 1999 Forwards Insp Rept 50-440/99-01 on 990113-0224.Non-cited Violation Was Identified ML20207H9921999-03-11011 March 1999 Informs That Requirements to Pay Fee Under 10CFR170 for Review of Pilot Plant Application for Use of Revised Accident Source Term Methodology for Perry Nuclear Power Plant Unit 1,waived for Reasons Stated ML20207K1991999-03-0404 March 1999 Forwards List of Names of Those Individuals & Their Organizational Affiliation as Appropriate,Who Spoke at Informal Public Hearing Re Petitions Filed Pursuant to 10CFR2.206 for River Bend & Perry Plants on 990222 ML20203F8501999-02-11011 February 1999 Forwards Fr Notice to Be Published on 990219 Re Informal 10CFR2.206 Public Hearing Including Video Teleconferencing 1999-09-09
[Table view] |
Text
!
l 0 0 May 27, 1997 Mr. Lew W. Myers i Vice President - Nuclear, Perry l Centerior Service Company P.O. Box 97, A200 Perry, OH 44081
SUBJECT:
FIRST 10-YEAR INTERVAL INSPECTION PROGRAM PLAN REQUESTS FOR RELIEF, PERRY NUCLEAR POWER PLANT, UNIT N0. 1 (TAC NO. M95898)
Dear Mr. Myers:
The NRC staff, with technical assistance from its contractor, the Idaho National Engineering and Environmental Laboratory (INEEL), has reviewed and evaluated the information provided by The Cleveland Electric Illuminating Company in its [[letter::PY-CEI-NRR-2067, Responds to follow-up to RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, Ampacity Derating,Chemical Composition & Radiant Energy Heat Shield|letter dated June 28, 1996]], related to the first 10-year interval inservice inspection program plan requests for relief for Perry Nuclear Power Plant, Unit No.1. Additional information was provided by letter dated February 12, 1997.
For Requests for Relief IR-005 and IR-021, the staff has concluded that the American Society of Mechanical Engineers (ASME) Code requirements are impractical and, therefore, the reliefs remain granted pursuant to 10 CFR 50.55a(g)(6)(1).
For Requests for Relief IR-028 and IR-029, the staff has concluded that compliance with the ASME Code requirements would result in hardship without a i
compensating increase in the level of quality and safety. Additionally, the licensee's proposed alternatives will provide reasonable assurance of the operational readiness of the subject systems. Therefore, the licensee's proposed alternatives are authorized pursuant to 10 CFR 50.55a(a)(3)(ii).
The staff's safety evaluation is included as Enclosure 1. Enclosure 2 is INEEL's Technical Letter Report.
Sincerely, Original signed by:
Gail H. Marcus, Director k N< # 34' f h" h @
Project Directorate III-3 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-440
Enclosures:
- 1. Safety Evaluation
- 2. Technical Letter Report cc w/encls: See next page i DISTRIBUTION: PD3-3 R/F GGrant, RIII EAdensam (EGAl)
Docket File RLatta 0GC GBagchi i TMcLellan PUBLIC THarris (TLH3, SE only)
JRoe ACRS hulrhL;J i DOCUMENT NAME: G:\ PERRY \PRYTKM.ISI To receive a copy of this document, indicate in the box:
- C" = Copy without enclosures "E" = Copy with enclosures "N", = No copy 0FFICE PD33-LA lE OGC mA044Ql / /4TD33-PM lE PD33-D_. _
( NAME CBoyle a d V#1NMc/S4/ JHopkins A// GMarcus (#t' '
DATE 05/0/970 5//9/97 C 05//3/97 /// 5/27/97 9706030157 970527
- PDR ADOCK 05000440 l
G PDR l
, . - - , , - _ . - . - ...~ .. _...~_. - - . - . . - - - . _ - - . - - - . . . .
i May 27, 1997 Mr. Lew W. Myers Vice President - Nuclear, Perry Centerior Service Company P.O. Box 97, A200 l Perry, OH 44081 SUBJECT. FIRST 10-YEAR INTERVAL INSPECTION PROGRAM PLAN REQUESTS FOR ;
RELIEF, PERRY NUCLEAR POWER PLANT, UNIT NO 1 (TAC NO. M95898) i
Dear Mr. Myers:
The NRC staff, with technical assistance from its contractor, the Idaho National Engineering and Environmental Laboratory (INEEL), has reviewed and evaluated the information provided by The Cleveland Electric Illuminating Company in its [[letter::PY-CEI-NRR-2067, Responds to follow-up to RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, Ampacity Derating,Chemical Composition & Radiant Energy Heat Shield|letter dated June 28, 1996]], related to the first 10-year interval inservice inspection program plan requests for relief for Perry Nuclear Power Plant, Unit No.1. Additional information was provided by letter dated February 12, 1997.
For Requests for Relief IR-005 and IR-021, the staff has concluded that the American Society of Mechanical Engineers (ASME) Code requirements are impractical and, therefore, the reliefs remain granted pursuant to 10 CFR 50.55a(g)(6)(i).
l l For Requests for Relief IR-028 and IR-029, the staff has concluded that l compliance with the ASME Code requirements would result in hardship without a compensating increase in the level of quality and safety. Additionally, the licensee's proposed alternatives will provide reasonable assurance of the operational readiness of the subject systems. Therefore, the licensee's i proposed alternatives are authorized pursuant to 10 CFR 50.55a(a)(3)(ii). :
The staff's safety evaluation is included as Enclosure 1. Enclosure 2 is INEEL's Technical Letter Report.
Sincerely, j Original signed by:
Gail H. Marcus, Director Project Directorate III-3 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-440
Enclosures:
- 1. Safety Evaluation
- 2. Technical Letter Report cc w/encls: See next page i DISTRIBUTION: PD3-3 R/F GGrant, RIII EAdensam (EGA1) ,
Docket File RLatta OGC GBa9 11 l PUBLIC JRoe ACRS TMcLellan i THarris (TLH3, SE only) l DOCUMENT NAME: G:\ PERRY \PRYTKM.ISI l To receive a copy of tNo document. Indcate in the box:
l
- C* = Copy without enclosures *E' = Copy with enclosures "N*, = No copy l OFFICE PD33-LA lE OGC nu14AI0l//#-PD33-PM E PD33-D. _
[
NAME CBoyle d46 VMfGMcA%/ JHopkins & GMarcus W' 05/l;;1/97(I 0 05//3/97 ///
DATE 5/t9/97 5/27/97 0FFICIAL RECORD COPY l
,vn,, -.. - - - , , - - , , - - - g
Men p h UNITED STATES g y NUCLEAR RE2ULATORY COMMISSION .
. o 2 WASHINGTON, D.C. 30866-0001 l 4
- ,o May 27, 1997 Mr. Lew W. Myers Vice President - Nuclear, Perry Centerior Service Company
- P.O. Box 97, A200 i
Perry, OH 44081
SUBJECT:
FIRST 10-YEAR INTERVAL INSPECTION PROGRAM PLAN REQUESTS FOR
- RELIEF, PERRY NUCLEAR POWER PLANT, UNIT NO. 1 (TAC NO. M95898)
Dear Mr. Myers:
1 The NRC staff, with technical assistance from its contractor, the Idaho National Engineering and Ewironmental Laboratory (INEEL), has reviewed and i
evaluated the information provided by The Cleveland Electric Illuminating
. Company in its [[letter::PY-CEI-NRR-2067, Responds to follow-up to RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, Ampacity Derating,Chemical Composition & Radiant Energy Heat Shield|letter dated June 28, 1996]], related to the first 10-year interval inservice inspection program plan requests for relief for Perry
. Nuclear Power Plant, Unit No. 1. Additional information was provided by
< letter dated February 12, 1997.
For Requests for Relief IR-005 and IR-021, the staff has concluded that the American Society of Mechanical Engineers (ASME) Code requirements are i
impractical and, therefore, the reliefs remain granted pursuant to 10 CFR 50.55a(g)(6)(i). ,
1 For Requests for Relief IR-028 and IR-029, the staff has concluded that compliance with the ASME Code requirements would result in hardship without a compensating increase in the level of quality and safety. Additionally, the licensee's proposed alternatives will provide reasonable assurance of the operational readiness of the subject systems. Therefore, the licensee's 1
proposed alternatives are authorized pursuant to 10 CFR 50.55a(a)(3)(ii).
1 The staff's safety evaluation is included as Enclosure 1. Enclosure 2 is
- INEEL's Technical Letter Report.
- Sincerely, Y w Gail H. Marcus, Director j Project Directorate III-3 Division of Reactor Projects III/IV '
Office of Nuclear Reactor Regulation Docket No. 50-440
Enclosures:
- 1. Safety Evaluation
- 2. Technical Letter Report cc w/encis: See next page 1
l l
.L. Myers Perry Nuclear Power Plant Centerior Service Company Unit Nos. I and 2 cc:
Jay E. Silberg, Esq. Donna Owens, Director Shaw, Pittman, Potts & Trowbridge Ohio Department of Comerce 2300 N Street, N. W. Division of Industrial Compliance Washington, D. C. 20037 Bureau of Operations & Maintenance 6606 Tussing Road Mary E. O'Reilly P.O. Box 4009 Centerior Energy Corporation Reynoldsburg, Ohio 43068-9009 300 Madison Avenue Toledo, Ohio 43652 Mayor, Village of North Perry North Perry Village Hall Residetit Inspector's Office 4778 Lockwood Road U. S. Nuclear Regulatory Comission Nor3 Perry Village, Ohio 44081 Parmly at Center Road Perry, Ohio 44081 Attorney General Department of Attorney General Regional Administrator, Region III 30 East Broad Street U. S. Nuclear Regulatory Comission Columbus, Ohio 43216 l 801 Warrenville Road Lisle, Illinois 60532-4531 Radiological Health Program Ohio Department of Health Lake County Prosecutor P.O. Box 118 Lake County Administration Bldg. Columbus, Ohio 43266-0118 l 105 Main Street
! Painesville, Ohio 44077 Ohio Environmental Protection Agency Sue Hiatt DERR--Compliance Unit OCRE Interim Representative ATTN: Mr. Zack A. Clayton 8275 Munson P.O. Box 1049 l Mentor, Ohio 44060 Columbus, Ohio 43266-0149 j l
Terry J. Lodge, Esq. Chairman 618 N. Michigan Street, Suite 105 Perry Township Board of Trustees Toledo, Ohio 43624 3750 Center Rd., Box 65 l Perry, Ohio 44081 l Ashtabula County Prosecutor l 25 West Jefferson Street State of Ohio l Jefferson, Ohio 44047 Public Utilities Comission East Broad Street Henry L. Hegrat Columbus, Ohio 43266-0573 Regulatory Affairs Manager Cleveland Electric Illuminating Co. Richard D. Brandt, Plant Manager l Perry Nuclear Power Plant Cleveland Electric Illuminating Co.
i P. O. Box 97, A210 Perry Nuclear Power Plant
! Perry, Ohio 44081 P.O. Box 97, SB306 Perry, Ohio 44081 James R. Williams Chief of Staff Roy P. Lessy, Jr., Esq.
Ohio Emergency Management Agency Andrew G. Berg, Esq.
- 2855 West Dublin Granville Road Akin, Gump, Strauss, Hauer & l
! Columbus, Ohio 43235-2206 Feld, L.L.P. i
- Suite 400 l Mayor, Village of Perry 1333 New Hampshire Avenue, NW.
4203 Har>er Street Washington, D.C. 20036 Perry, Otto 44081
.- - -