IR 05000261/1986007: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML20205B099
| number = ML20205B099
| issue date = 07/11/1986
| issue date = 07/11/1986
| title = Ack Receipt of 860602 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/86-07
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/86-07
| author name = Verrelli D
| author name = Verrelli D
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8608110523
| document report number = NUDOCS 8608110523
| title reference date = 06-02-1986
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 1
| page count = 1
Line 18: Line 19:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:..
      *
JUL 11 1986 Carolina' Power and Light Company ATTN: /Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:
SUBJECT: REPORT NO. 50-261/86-07 Thank you for your response of June 2,1986, to out Notice of Violation issued on May 5, 1986, concerning activities conducted at your H. B. Robinson facilit We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte
 
Sincerely, ORIGINAL S!GMm 9Y DAVID 14. VEP.RELLI David M. Verrelli, Chief Reactor Projects Branch 2 Division of Reactor Projects cc: . P. Beatty, Jr. , Manager
/ Robinson Nuclear Project Department V R. E. Morgan, Plant General Manager bcc C Resident Inspector cument Control Desk
# ate of South Carolina 8608110523 860711 PDR ADOCK 05000261 G  PDR RII
  '
RIL@
LMellen:jd PFredrickson 7/ /86 7/l0/86 ND g eol
}}
}}

Latest revision as of 02:49, 7 December 2021

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/86-07
ML20205B099
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 07/11/1986
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8608110523
Download: ML20205B099 (1)


Text

..

JUL 11 1986 Carolina' Power and Light Company ATTN: /Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT: REPORT NO. 50-261/86-07 Thank you for your response of June 2,1986, to out Notice of Violation issued on May 5, 1986, concerning activities conducted at your H. B. Robinson facilit We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte

Sincerely, ORIGINAL S!GMm 9Y DAVID 14. VEP.RELLI David M. Verrelli, Chief Reactor Projects Branch 2 Division of Reactor Projects cc: . P. Beatty, Jr. , Manager

/ Robinson Nuclear Project Department V R. E. Morgan, Plant General Manager bcc C Resident Inspector cument Control Desk

  1. ate of South Carolina 8608110523 860711 PDR ADOCK 05000261 G PDR RII

'

RIL@

LMellen:jd PFredrickson 7/ /86 7/l0/86 ND g eol