ML20209F735

From kanterella
Jump to navigation Jump to search
Requests That Liquid Samples Spiked W/Radionuclides Be Radiochemically Analyzed for tritium,Sr-89,Sr-90 & Ir-55 within 60 Days as Part of NRC Confirmatory Measurements Program
ML20209F735
Person / Time
Site: Brunswick, Robinson, 05000000
Issue date: 08/29/1986
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8609120244
Download: ML20209F735 (2)


Text

Orifn0L]

AUG 2 91986 arolina Power and Light Company ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT:

DOCKET NOS. 50-325, 50-324, AND 50-261 As part of the NRC Confirmatory Measurements Program, liquid samples spiked with radionuclides will be sent to the Brunswick and Robinson facilities for radiochemical analyses. These samples are to' be analyzed for tritium, strontium-89, strontium-90, and iron-55 in accordance with your approved procedures for analysis of liquid waste samples. If routine analyses of this type are normally performed by a vendor, this vendor should be used to analyze the spiked samples. The spiked samples, with instructions, will be sent under separate cover from the Department of Energy's Radiological and Environmental Sciences Laboratory within approximately thirty days.

We request that the analyses be completed as soon as practicable, but no later than 60 days from receipt of the samples. Results should be sent to:

U. S. Nuclear Regulatory Commission, Region II, ATTN: Mr. P. G. Stoddart. Our evaluation of your results will be discussed with your staff and documented in our next inspection report for this area. Spiked samples will be sent to you on an annual basis as part of our routine inspection program.

If you have any questions regarding this program, please contact. Mr. Phillip G.

Stoddart by telephone at (404) 331-2689.

Sincerely David M. Verrelli, Chief Reactor Projects Branch 2 Division of Reactor Projects cc: (See page 2) 8609120244 860829 PDR ADOCK 05000261 P PDR t

12o\ -.

Carolina Power and Light Company 2 cc: P. W. Howe, Vice President dC. Brunswick Nuclear R. Dietz, Plant Project General Manager dG. P. Beatty, Jr. , Manager v Robinson Nuclear Project Department k R. E. Morgan, Plant General Manager dC.E.Robertson,ChemistrySupervisor,

\ Environmental and Radiation Control AJ. A. Eaddy, Chemistry and Environmental Supervisor hR.E. Smith,ManagerChemistryand Health Physics bec: NRC Resident Inspector V Document Control Desk State of North Carolina 1

RII RII RII S Sh hIjk &MC- }Il, inn SAdamovitz PStfddart DCollins trcMFredrickson 8/7//86 8/J//86 89.f/86 8/.26/86

.. . _- _ . _ -_.