ML20207T553

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-261/87-02 on 870217-18.No Violations or Deviations Noted
ML20207T553
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/27/1987
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20207T554 List:
References
NUDOCS 8703240124
Download: ML20207T553 (2)


See also: IR 05000261/1987002

Text

_ _ __ -

. - - - _ _ - .

'

3; .-

FEB 2 71987

l

h

I

l Docket'No. 50-261  :

~

License No. DPR-23- ,

. Cprolina Power an'd Light Company L

WTTN: Mr. E. E. Utley .

I

-Senior Executive Vice President

Power Supply and Engineering ,

and Construction

P. O. Box 1551

Raleigh, NC 27602 ,

Gentlemen:  !

h SUBJECT: NRC INSPECTION REPORT NO. 50-261/87-02

This refers to the Nuclear Regulatory Comission (NRC) inspection conducted by  !

W. M. Sartor on February 17-18, 1987. The inspection included a review of

activities authorized for your H. B. Robinson facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures l'

and representative records, interviews with personnel, ' and observation of

activities in progress.  !

Within the scope of the inspection, no violations or deviations were i

identified, i

In accordance with Section 2.790 of the NRC's " Rules of Practice " Part 2

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be'placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

l

,

'

i David M. Verrelli, Chief '

Reactor Projects Branch 2

Division of Reactor Projects i

Enclosure:

Inspection Report l

cc w/ encl: (Seepage 2)

O l

LL of

c.

I

L

. ..

Carolina Power and Light Company '2

cc w/ encl:

W. P. Beatty, Jr. , Vice President

Robinson Nuclear Project Department

  1. . E. Morgan, Plant General Manager

bec w/ encl:

M C Resident Inspector

Document Control Desk

State of North Carolina

Rll Rll q h

R}  ;

or TD er DCollins (Fredrickson

2/21/87 2/ /87 2/21787 2/x/87

_ _ -