Forwards Requalification Exam Rept 50-261/OL-87-03 on 871214-17.Results of Exam Will Be Used in Assigning Overall Program Rating After Administration of Next Requalification Exam
ML20148G761
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 01/12/1988
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20148G765 List:
References
NUDOCS 8801270026
Download: ML20148G761 (2)


Text

. _ _ _ _ _ _ . __ ___ _ -____________.

1E January 12, 1988 Carolina' Power and Light Company ATTN: Mr. E. E. Utley, Senior Executive Vice President Power Supply and Engineering and Construction

-411 Fayetteville Street Raleigh, NC -27602 Gentleman:

SUBJECT:

REQUALIFICATION EXAMINATION REPORT - 50 261/0L-87-03 During the week of December 14, 1987, the NRC administered requalification examinations to employees of your company who operate the H. B. Robinson Steam Electric Plant. At the conclusion of the examination, any generic findings that evolved as a result of the examination were discussed with those members of your staff identified in the enclosed Examination Report.

A copy of the examinations and answer key is provided in enclosure 2.

A:semmary of the examination results is provided in enclosure 3.

Due to an insufficient number of operators evaluated, an overall program rating cannot be assigned based on this examination, however, the requalification program, in the interim, is considered to be rated satisfactory. The results of this examination will be used in assigning an overall program rating after the administration of the next NRC requalification examination.

As a result of this evaluation NRC observed one operator performed in an unsatisfactory manner on the operating test. For the individual with unsatisfactory results, the facility should take corrective action as required by its NRC approved requalification program.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this letter and the enclosures.will be placed in the NRC Public' Document Room.

Should you have any questions concerning this examination, please contact Mr. John Munro at 404/331-5594 or Mr. Charles Casto at 404/331-4180.

Sincerely, (ORIGINAL SIGNED BY M. c. SHYMLOCK FOR) 8801270026 880112 PDR ALOCK 05000261 Caudle A. Julian, chief V PDR Operations Branch Civision of Reactor Safety

Enclosures:

1. Exam Report No. 50-261/0L-87-03
2. R0/SR0 Exam Questions & Answer Key
3. Requal Program Evaluation Report cc (See Page 2) l \

t

.2-E G

m . _ ._. _ . ._ _ - . _ . .

II i

n

. Carolina' Power and Light Company January' 12, 1988 cc w/encls: 1. & 3' J. L. Harness,. Corporate Training Dir.

R. E. Morgan, Plant Manager cc w/encis: 1, 2, & 3 C. Bethea, Site. Training Director bec.w/ enc 1 1:

G. Requa, Project Manager NRR

'P. Fredrickson, Section Chief DRP

0. Casto, 0L Examiner State of South. Carolina

< ~

bec w/encls 1, 2, & 3 Senior Resident ~ Inspector - Robinson Operator Licensing Branch, DLPQ:NRR Document Control Desk 4

+

RI RI RII RII Shaw o Cas o 01/st/88 01//t/88 01// t/8 01//t/ 8

.