ML20148C975

From kanterella
Jump to navigation Jump to search
Conveys Results & Conclusions Re NRR Regulatory Effectiveness Review on 871207-11.Purpose of Program to Assure That Safeguards Implemented at Licensed Power Reactors Meet NRC Performance Objectives.Rept Withheld
ML20148C975
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 01/19/1988
From: Varga S
Office of Nuclear Reactor Regulation
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8801250300
Download: ML20148C975 (4)


Text

._ - -_- - _ -._ -_ ._. -- - . . . . . . .

$EGilM E0RMATON JAN 191988 Docket No. 50-261 Carolina Power and Light Company ATTN: E. E. Utley, Senior Executive Vice President P.O. Box 1551 Raleigh, North Carolina 2760?

Gentlemen:  ;

SUBJECT:

H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 REGULATORY EFFECTIVENESS REVIEW This letter conveys the results and conclusions of the Regulatory Effective- l ness Review (RER) conducted by the NRC's Office of Nuclear Reactor Regula-tion at H. B. Robinson Steam Electric Plant, Unit 2 from December 7 - 11, 1987.

The RER team was composed of NRC personnel assisted by members of the U.S. Army Special Forces. The purpose of the RER program is to assure.that safeguards implemented at licensed power reactors meet NRC performance objectives and that NRC safeguards regulations adequately ~ support those objectives. ,

The RER findings are documented in the enclosed report (Part I, Safeguards 1 Systems Effectiveness Review, and Part II, Safety / Safeguards. Interface Review).

i Part III of the report (Vital Area Definition) will be forwarded later under separate cover. These enclosures, which contain Safeguards Information of a '

I type specified in 10 CFR 73.21, will not be placed in the Public Document Room, and must be protected against unauthorized disclosure.-

The enclosed report does not convey any new regulatory requirement. However, the findings have been considered with respect to your ability to meet the general performance objective and requirements of 10 CFR 73.55(a). With the exception of those findings categorized as "General Observations," we believe that correction of identified weaknesses could result in a substantial l increase in the overall protection of the public health and safety. If-you elect not to correct some weaknesses it would be appreciated if your response included a discussion of why you believe corrective action is not warranted.

Please respond within 45 days after receiving this letter.

8801250300 830119 ADOCK 05 1 fDR UPON REMOVAL 0F ATTACHMENT THIS DOCUMENT 13:

0EC70N:TfR70{LLlE'Dy Document Transmitted Herewith Contains SAFEGUARDS INFORMATION

$[H8%Ils NF0;WTOk,

. CarolinaPowerandLight[{ hf gg'  !

Some of the items identified by.the team may be potential enforcement findings. Any enforcement actions will be identified by Region II.

Following review of your response, NRC may propose a backfit in accordance

, with 10 CFR 50.109, if appropriate, for significant, uncorrected items identified by the team that are not enforcement findings.

The reporting and/or record keeping requirements contained in this letter affect fewer than 10 respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, d

Steven A. Varga, Director Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Enclosures:

1. Safeguards Systems Effectiveness Review, Part I
2. Safety / Safeguards Interface Review Part II cc w/ enclosures:

D. McGuire, Region II R. M. Latta l cc w/o enclosures:

See next page l

I k

, h} '

DISTRIBUTION W/0 ENCLOSURES DISTRIBUTION WENCLOSURES CBuracker (2) R. Keimig, RI Warren J. R. Creed, RIII 00rrik L. A. Yandell, RIV DPickett R. Scarano, RV RHsu H. B.. Robinson Corr. File JGibson RDube RErickson JPartlow PAnderson KEccleston EAddnsam.

BBoger SVarga . . . , .

!l Docket -F,iles 50-2619~~

"RSGB'rf~ ~

DRIS rf ATillman (lRC. PD2-LCCRu PDR

\ nY OFC:R$GB :RSGB :RSGB :RSGB :RSGB

^ ' :RSGB W :R$GB

_g g 4 ...____.4.....____..

NAME:CBura r : Warren :00rrik :DPic ett :RHsul :JGibson :RDube V DATE:// ///87  :(2/21/87 : I////8% : I / 0/8% : 19/D/87 :/2/2887 : I / u/8%

~

/

OFC:RI :R$ :PDII-1 :PDII PDII-1 O: :NRR/AD l -'

4 NAME: ATill n RE snJ t P( son celeston EAde

..__....____.____.__,..._________..____..__.....__...__.....__h_87_

DATE:fMh87  : l/l'/8T : k/ N/87 J/iT/87 : I/II/87 :/ //  : / /87

_.___.\

, , MTW OFC: R/MP  :  :  :  :  :  :

..)__........___________...__...._____..___...______...__....______..

N Vega  :  :  :  :  :  :

DATE:f//"/87 0FFICIAL RECORD COPY SW MDS MOR"ATIO!!

Mr. E. E. Utley Carolina Power & Light Company H. B. Robinson 2 cc:

Mr. R. E. Jones, General Counsel Mr. Dayne H. Brown, Chief Carolina Power & Light Company Radiation Protection Branch P. O. Box 1551 Division of Facility Services Raleigh, North Carolina 27602 Department of Human Resources 701 Barbour Drive Raleigh, North Carolina 27603-2008 Mr. McCuen Morrell, Chairman Darlington County Board of Supervisors Mr. Robert P. Gruber County Courth0use Executive Director Darlington, South Carolina 29535 Public Staff - NCUC P.O. Box 29520 Mr. H. A. Cole Raleigh, North Carolina 27626-0520 Special Deputy Attorney General State of North Carolina P.O. Box 629 i Raleigh, North Carolina 27602 Mr. D. E. Hollar Associate General Counsel Carolina Power and Light Company P.O. Box 1551 Raleigh, North Carolina 27602 l'.S. Nuclear Regulatory Comission Resident Inspector's Office H. B. Robinson Steam Electric Plant Route 5, Box 413

, y Hartsville, South Catolina 29550 .

_ Regional Administrator, ' legion II ,

U.S. l'uclear Regulatory Comission Suite 2900

+ 101 Marietta' Street '

_7 Atlanta, Georgia 30303 , i Mr. R. Morgan i General Manager l H. B. Robinson Steam Electric Plant Post Office Box 790 Hartsville, South Carolina 29550 Mr. Avery Upchurch, Chairmar.

Triangle J Council of Governments .

100 Park Drive Post Office Box 12276 '

Research Triangle Park, NC 2/709 l A 7