Forwards Insp Rept 50-261/87-04 on 870211-0310.No Violation or Deviation Identified
ML20205N628
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 03/24/1987
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20205N630 List:
References
NUDOCS 8704030070
Download: ML20205N628 (2)


See also: IR 05000261/1987004

Text

by

,

a

M

MAR 241987

Docket No. 50-261

,

License No. DPR-23

Carolina Power and Light Company

vnTTN: Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering-

and Construction

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT: INSPECTION REPORT NO. 50-261/87-04

This refers to the Nuclear Regulatory Commission (NRC)-inspection conducted by

Harry E. P. Krug on February 11 - March 10,1987. The inspection included a

review of activities authorized for your H. B. Robinson facility. At the

conclusion of the inspection, the findings were discussed with those members of

your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were

identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

ORIGINAL SIGNED BY Ig

HUGH C. DANCE

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosure: (See page 2)

0704030070 870324

PDR

O ADOCK 05000261 t

PDR

I ( p c/

. .. ..

'

,O y

O MAR 2 41987

Carolina Power and Light Company 2-

-

j

.

t

1-

Enclosure:

i NRC Inspection Report

cc

I.w/P.encl:

Beatty, Jr., Vice President

3

,_JobinsonNuclearProjectDepartment

.

ur. E. Morgan, Plant General Manager

bec w/ encl:

LWC Resident Inspector

Document Control Desk

'

State of North Carolina

.

?

.

l

l

l

,

2

i

RII60bh RII

-YLSMellen:er PEFredrickson

03/t//87 03/ /87

i

,_ _ _ _ . , _ . _ . - _ _ _ - .

-

- .- -. _ _

-

_ _ . - . - _ . - __ _ _ - - _ _ - _ ._ _ . . _ , - _ _ _