ML20213F851: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 1: | Line 1: | ||
{{Adams | |||
| number = ML20213F851 | |||
| issue date = 05/13/1987 | |||
| title = Partial Response to FOIA Requests for Documents Re Plant.App H Documents Available in Pdr.Documents Also Responsive to FOIA Requests 84-743 & 84-744 | |||
| author name = Grimsley D | |||
| author affiliation = NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) | |||
| addressee name = Devine, Dixon | |||
| addressee affiliation = GOVERNMENT ACCOUNTABILITY PROJECT | |||
| docket = 05000275, 05000323 | |||
| license number = | |||
| contact person = | |||
| case reference number = FOIA-84-741, FOIA-84-742, FOIA-84-743, FOIA-84-744 | |||
| document report number = NUDOCS 8705180015 | |||
| document type = CORRESPONDENCE-LETTERS, NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA, OUTGOING CORRESPONDENCE | |||
| page count = 6 | |||
}} | |||
=Text= | |||
{{#Wiki_filter:U.S. NUCLEAR RE!ULATCRY COMMISSCN NRc soia rEovEst kuvatasi f - ~ h, Fim A -H.EseoNsE -74/cmt Tere B Y-7R y. | |||
sE 1 I RESPONSE TO FREEDOM OF h"^' | |||
W"'" | |||
INFORMATION ACT (FOIA) REQUEST | |||
\es.e/ e 00cmET NUMBEntSlid epseel N 13 987 1 i.EQUESTER | |||
$6 Wb De PART 3.-RECORDS RELEASED OR NOT LOCATED ISee checked bones) | |||
No agency records subsect to the request have been located. | |||
No additonal agency records subsect to the request have been located Agency records subject to the request that are identified in Appe%s Y sie already avadable for public inspecten and copying in the NRC Public Document Room, 1717 H Street, N.W., Washington, DC. | |||
Agency records subject to the request that are identifed in Appendia are being made available for public inspecten and copying in the NRC Public Document Moom,1717 H Street, N W., Washington, DC in a folder under this FOIA number and requester name. | |||
The nonpropnetary versen of the proposaHsl that you agreed to accept m a telephone conversaten with a member of my staff is now being made avaiable for public inspection and coving at the NRC Pubhc Document Room,1717 H Street N W., Washington, DC,in a folder under the FOIA number and requester name. | |||
Enclosed is informaton as how you may obtain access to and the charges for copying records placed in the NRC Public Document Room,1717 H Street, N.W., Washington, DC. | |||
Agency records subject to the request are enclosed. Any apphcable charge for copes of the records provided and payment procedures are noted in the comments section. | |||
Records subject to the request have been referred to another Federal agencylies) for revew and direct response to you. | |||
In vow of NRC's response to the request, no further action a being taken on appealletter dated PART ll.A-INFORMATION WITHHELD FROM PU8LIC DISCLOSURE Certam informaton in the requested records is being wrthheld from pubhc disclosure pursuant to the FOIA enemptons desenbod in and for the reasons stated in Part it, sec-tons 8, C. and D. Any released portens c4 the documents for which only part of the record is beeng withheld are being made evaslable for public inspection and copying in tha NRC Public Document Room,1717 H Street, N.W,, Washington, DC, in a folder under the FOlA number and requester name. | |||
Comments M g it7t/ N L 7 Q w .Fe& | |||
M~74{. | |||
Qw 6 a w aparab of me-#W3 8705180015 PDR FOIA 870513 DEVINE84-741 PDR Si N 'URE. DIRECTOR PV1SION 5 RULES AND RECOROS W . | |||
T s | |||
NRC FOIM 464 :Part 0 isc | |||
- .. . -. . -. . .. - . ~ . - . . . . - - . . . - _ _ _ _ _ _ _ _ _ - | |||
e Re: F01A-84-741, F01A-84-742, F01A-84-743 and F01A-84-744 APPENDIX H RECORDS MAINTAINED AMONG PDR FILES | |||
: 1. Undated Table 3.3-5 (Continued) Table Notation. (2 pages) PDR# | |||
8409280391 | |||
: 2. Undated Affidavit for PG8E to applie to amend its Diablo Anyon Power Plant (DCPP) Facility Operating License No, DPR-76 (License). (1 page) PDRf 8409280389 | |||
: 3. Undated Affidavit of Chu-Yu Liang (30 pages) PDR # 8403190119 | |||
: 4. Undated Affidavit of Faust Rosa Regarding Residential Heat Removal System. (17 pages) PDR # 8403190122 | |||
: 5. Undated Affidavit of Samuel D. Reynolds, Jr. (7 pages) PDR # | |||
8403190110 1 6. Undated Affidavit of James P. Knight. Regarding the Joint Intervenors' Motion to Augment or, in the Alternative, to Reopen the Record. (16 pages) PDR # 8403190102 j 7. Undated Affidavit of Dr. Mark Hartzman, Regarding the Joint | |||
! Intervenors' Motion to Augment or, in the Alternative, to Reopen the Record. (22 pages) PDR # 3403190106 | |||
: 8. 7/25/80 Ltr to Crouse from Reid, w/ attached Docket No. 50-346(14 pages) PDR # 8008050513 l | |||
} 9. 10/26/83 Memo for Eisenhut from Bishop re Allegations Concerning j | |||
! the Residual Heat Removal System, Diablo Canyon Units 1 and 2, I l | |||
Docket hos. 50-275 and 50-323, Allegation No. RV-83-A-0047 l l w/ attachments (10 pages) PDR# 8310310274 ! | |||
: 10. 11/25/83 Memo to Distribution (See attached) from Bishop, subject: | |||
Diablo Canyon Allegation Management - Assignment Update. | |||
(6 pages) PDR # 8312010118 | |||
, 11. 11/29/83 Memo for Attched List from Knighton re: Guidance for Preparation of the Diablo Canyon Allegations Evaluation | |||
: PDR# 8312090368 | |||
: 12. 11/30/83 Memo for attached list from Knighton, subject: Guidance for Preparation of the Diablo Canyon Allegations Evaluation. (3 pages) PDR # 8312090330 1 I | |||
3 . | |||
Re: F01A-84-741, F01A-84-742, F0lA-84-743 and F01A-84-744 APPENDIX H (Continued) | |||
RECORDS MAINTAINED AMONG PDR FILES | |||
: 13. 12/9/83 Memo for Eisenhut from Mattson, subject: Response to Diablo Canyon Allegations. (27 pages) PDR # 8501230029 | |||
: 14. 1/17/84 Memo for Novak from Houston, subject: Low Pressure Injection Flow Alarm, re: 12/9/83 memo (Mattson to Eisenhut). (5 pages) PDR # 8402030068 | |||
: 15. 1/23/84 Memo for Hayes from Ebersole, subject: Allegations Regarding Construction Practices at the Diablo Canyon Nuclear Power Station. (2 pages) PDR # 8603280174 | |||
: 16. 2/2/84 Petition Pursuant to 10 CFR 2.206 (53 pages) PDR # 1 8403060303 | |||
: 17. 2/6/84 Memo for Houston, Rubenstein and Booher from Novak, subject: Diablo Canyon ACRS Briefing on February 10, 1984 (2 pages) PDR # 8402130301, w/ attached: Advisory Committee on Reactor Safeguards Subcommittee on Diablo Canyon (3 pages) PDR # 8401250088 (288 pages) 18, 3/15/84 Memo for Novak from Houston, subject: Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Staff Affidavits in Response to the Affidavit of John H. Cooper dated 1/19/84 and to Allegation No. 177. (1 page) PDR # 8404050267 w/ attached: Affidavit of Chu-Yu Liang (30 pages) PDR # | |||
8403190119 | |||
: 19. 3/15/84 NRC Staff's Answer to Joint Intervenors' Motion to Augment or, in the Alternative, To Reopen the Record. | |||
(29pages) PDR # 8403190100 | |||
: 20. 3/29/84 Ltr to Denton from D.A. Brand, PG&E, re: Docket No. | |||
50-275, OL-DPR-76, Docket No. 50-323, Diablo Canyon Units 1 and 2, 10 CFR 2.206 Petition by GAP dated February 2, i 1984. (41 pages) PDR # 8404030051 l l | |||
: 21. 4/19/84 Memo for Knighton from Sheron, subject: Diablo Canyon Units 1 and 2 - RHR Suction Line Isolation Valves. (4 pages) PDR # 8405020415 | |||
: 22. 4/30/84 Ltr to Denton from PG&E, re: Docket No. | |||
50-275, OL-DPR-76, Docket No. 50-323, Diablo Canyon Units I and 2, 10 CFR 2.206 Petition by GAP dated March 1, 1984.(10pages) POR # 8405180261 | |||
ke: F01A-84-741, F01A-84-742, F01A-84-743 and F01A-84-744 APPENDIX (Continued)H RECORDS MAINTAINED AMONG PDR FILES | |||
: 23. 5/9/84 Ltr to Knighton from Schuyler, re: Docket No. | |||
50-275, OL-DPR-76, Docket No. 50-323, Diablo Canyon Units 1 and 2, SSER 21 and 22 Item 100-Painting Inside Containment. (5 pages) PDR # 8405140406 | |||
: 24. 5/21/84 Ltr to Schuyler from Knighton subject: Diablo Canyon - | |||
RHR Suction Line Isolation Valves. (4 pages) | |||
PDR # 8406040115 | |||
: 25. 5/22/84 Ltr to Document Control Msk from Shiffer, re: Docket No. | |||
50-275, OL-DPR-76, Diablo Canyon Unit 1, Licensee Event Report 83-034/0lT-1 Improper Wiring - RHR Pump Centrol Circuit. (3 pages) POR i 8405300098 | |||
: 26. 5/24/84 Ltr to Knighton from Scouyler, re: Docket No. 50-275, OL-DPR-76, RHR System Low Flow Alarm. (2 pages) | |||
PDR # 8405300276 | |||
: 27. 5/31/84 Ltr to Hans Schierling from Thomas Devine, GAP (2 pages) w/ attached Affidavit (54 pages) PDR # 8406250316 | |||
: 28. 6/6/E4 Ltr to Knighton from Scttuyler, re: Occket No 50-275, OL-DPR-76 RHR System Lcw Flow Alarm. (1 page) | |||
PDR # 8406110183 | |||
: 29. 6/8/84 Ltr to Knighton from Schuyler, re: Cocket No. 50-275, OL-DPR-76, Docket 50-323, Diablo Canyon Units 1 and 2 Request for Additional Initial Test. (12 pages) | |||
, POR # 8406120458 30, 7/2/84 Ltr to Knighton from J.0. Schuyler, re: Docket No. 50-275 OL-DPR-76 Diablo Canyon Unit 1. RHR System Low Flow Alarm (2pages) PDR # 8407090213 | |||
: 31. 7/3/84 Memo for Denton from Eisenhut, subject: Diablo Can Unit 1 - Full Power License Matters and Schedule (yon 5pages) | |||
PDR # 8407230278 | |||
: 32. 7/10/84 Memo to Novak from Houston, subject: Diablo Canyon Nuclear Power Plant, Units 1 and 2 - SER Supplement No. | |||
: 24. (9 pages) IDR # 8408290207 t | |||
Re: F0IA-84-741, F01A-84-742, F01A-84-743 and F01A-84-744 APPENDIX f-(Continued) l RECORDS MAINTAINED AMONG PDR FILES | |||
: 33. 7/10/84 Memo for hovak from Houston, subject: Diablo Canyon Nuclear Power Plant, Units 1 and 2 - SER Supplement No. | |||
26.(25pages) PDR k E408290207 | |||
: 34. 7/31/84 Ltr to Knighton from Schuyler re: Docket No. 50-323, Diablo Canyon Unit 2 Internal Review Program Summary and Status Report. (49 pages) PDR i 8408060126 | |||
. 35. 7/31/84 Ltr to Knighton from Schuyler re: Docket No. 50-323, Diablo Car. yon Unit 2, l' nit 2 Specific Design Aspects. (5 pages) PDR # 8408070278 | |||
] 36. '1/10/84 Memo for Eernero, Bishop, Grace Thompson, and Vollmer from Eisenhut, subject: Diablo Canyon Unit 2 - Licensing andReviewStatus.(2peges) PDR # 8410020068 | |||
: 37. 9/10/E4 Meeting Notice Distributton. (3pages) PDR # 8409190150 | |||
] | |||
: 38. 9/21/84 Ltr to Denton from Brand, re: Docket No 50-275, | |||
; OL-DPR-76 Diablo Canyon Unit 1 License Amendment Request 84-10FeedwaterBypassYalves.(1page) PDR # 8409280387 | |||
: 39. 9/25/84 Ltr to Schuyler from Krdghton, subject: NRC Site Visit Regarding RHR S Test. (9 pages)ystem and Natural Circulation / Boron Mixing PDR e 8410150621 ' | |||
: 40. 10/3/84 Memo for Bernero, Grace., Speis, Thompson, and Vollmer from Eisenhut, subject: DiabloCanyonUnit2 Review.(8 papos) PDR 8410240359 l | |||
: 41. 10/6/34 Ltr to Eisenhut from $chuyler, re: Docket No. 50-323 l DiabloCanyonUnit2DesignReview.(12pages) j PDR # 8310170471 | |||
; 42. 10/19/84 Memo for Attached list from Knighton, subdect: ' Technical Specifications for Diablo Canyon Unit 2. (2 pages) | |||
; PDR i 8410310246 i 43. 11/2/84 Ltr to Knighton fron Shlffer, re: Docket No. 50-323 Diablo Canyon Unit 2. Allegation Review Program Status Report. (176pages) PDR # 8411150035 i | |||
1 l | |||
f | |||
Re: FOIA-84-741, F01A-84-742 F0!A-84-743 and F01A-84-744 APPENDIX Fi | |||
; (Continued) i RECORDS MAINTAINED AMONG PDR FILES | |||
: 44. 11/30/84 Distribution for Memo dtd 11/30/84 (4 pages) PDR i 8501070463 45, 12/10/84 Memo for Knighton from Sheron, subject: Diablo Canyon Allegations. (2 pages) PDR # 8412140319 | |||
: 46. 1/11/85 Ltr to Knighton from Shiffer, re: Docket No. 50-323 Diablo Canyon Unit 2, RHR Low Flow Alarm System. (1 page) | |||
PDR # 8501170049 | |||
) 47. 1/11/85 Memo for Kirsch, Vollmer, Grace, Speis, Thompson and Bernero from Eisenhut, subject: Diablo Canyon Unit 2 Review. (6 pages) PDR # 8501160245 I | |||
i I | |||
) | |||
i l | |||
l | |||
) | |||
i f | |||
GOVERNMENT ACCOUNTADill1Y PROJECT Institute for Pokey Studies 1901 Que Street N.W., Washington. D.C 20009 (202)234 9382 September 13, 1984 Director FREEDOM 07 gygg Office of Administration U.S. Nuclear Regulatory Coct:aission ( ACI REQUESI N Washington, D.C. 20555 ' | |||
b ~8 k-7 yf To Whom It May Concern: W 9"/7 '8 h Pursuant to the Freedom of Information Act (FOIA), 5 U.S.C. 9552, the Government Accountability Project (GAP) requests copies of any and all agency remrds and informat ion, including but not limited to notes, letters, memoranda, u afts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview reports, procedures, instructions, files, graphs, engineering analyses, charts, maps, photographs, agreements, handwritten notes, studies, data sheets, notebooks, books, telephone messages, computations, voice recordings, any other data compila-tions, interha and/or final reports, status reports, and any other records relevant to and/or generated in connection with the August 20, 1984 directors.'. decision under 10 C.F.R. 2.206 in r esponse to various petitions filed pursuant to 10 C.F.R. 2.206 by the Covernment Accountability Project (GAP) on behalf of the San Louis Obispo, Mothers for Peace. We request that each responsive document be identified by the allegation number (s) to which it may relate. | |||
If any of the materials covered by this request have been destroyed and/or removed, please provide all surrounding documentation, including but not limited to a description of the action (s) taken, relevant date(s), and justification (s) for the action (s). | |||
GAP requests that fees be waived, because " findings information can be considered as primarily benefitting the general public," 5 U.S.C. E552(a)(4)(A). GAP is a non-profit, non-partisan public interest organization concerned with honest and open government. Through legal representation, advice, national conferences, films, publications and public outreach, the project promotes whistleblowers as agents of government accountability. We are requesting the above information as part of an on-going monitoring project on the adequacy of the NRC's efforts to protect public safety and he.alth at nuclear power plants. | |||
For any documents or portions that you deny due to the specific FOIA exemption, please provide an index itemizing and describing the documents or portions of documents withheld. The index should provide a detailed justification of your grounds for claiming each exemption, explaining why each exemption is relevant to the document or portion of the document withheld. This index is required under Vaughn v. Rosen(I), 484 F.2d. 820 (D.C. Cir.1973), cert. denied, 415 U.S. 977 (1974) . | |||
We look forward to your response to this request within ten days. | |||
l h4l-Thomas Devine Cr tal Dixon Legal Director Legal Intern | |||
+ | |||
M. -T . | |||
GOVERNMENT ACCOUNTADIUTY PROJECT Institute for Pohcy 5tudies 100tCve Street N W . Woshington D C. 20000 (202) 234E i>- i. . .. , u u . , n . ,, , 6 b nu September 13 , 1984 Director FREEDOM OF INFogg Of fice of Administration ACT REQUES U.S. Nuclear Regulatory Commission Washington, D.C. 20555 h[$ g 2 g y { | |||
To Whom It May Concern: | |||
Get 'd 9 e< ' | |||
Pursuant to the Freedom of Information Act (F01A), 5 U.S.C. 9552, the Government Accountability Project (CAP) requests copies of any and all agency records and informat ion, including but not limited to notes, letters, memoranda, draf ts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview reports, procedures, instructions, files, graphs, engineering analyses, charts, maps, photographs, agreements, handwritten notes, studies, data sheets, notebook:2, books, telephone messages, computations, voice recordings, and any other records relevant to and/or generated in connection with the interim directors' decision under 10 C.F.R. 2.206 in response to July 27,1984, July 29,1984, July 30,1984, and July 31, 1984 petitions filed under 10 C.F.R. 2.206 on behalf of Timothy O'Neill and James McDermott. We request that each responsive document be indenti-fied by the allegation number (s) to which it may relate. | |||
If any of the materials covered by this request have been destroyed and/or removed, please provide all surrounding documentation, including but not limited to a description of the action (s) taken, relevant date(s), and justification (s) for the action (s). | |||
GAP requests that fees be waived, because " findings information can be considered as primarily benefitting the general public," 5 U.S.C. 8552(a)(4)(A). GAP is a non-profit, non-partisan public interest organization concerned with honest and open government. Through legal representation, advice, national conferences, films, publications and public outreach, the project promotes whistleblowers as agents of government accountability. We are requesting the above information as part of an on-going monitoring project on the adequacy of the NRC's efforts to protect public safety and health at nuclear power plants. | |||
For any documents or portions that you deny due to the specific FOIA exemption, please provide an index itemizing and describing the documents or portions of , j documents withheld. The index should provide a detailed justification of your grounds for claiming each exemption, explaining why such exemption is relevant to the document or portion of the document withheld. This index is required under Vaughn v. Rosen(I), 484 F.2d 820 (D.C. Cir.1973), cert. denied, 415 U.S. 977 (1974: | |||
We look forward to your response to this request within ten days. I Your truly, Thomas Devine O CnMW Crystal Dixon Legal Director Legal Intern I | |||
l | |||
%5c,%'f0f85 . | |||
. GOVERNMENT ACCOUNTADIUTY PROJECT Institute for Pohcy Studies l 1901 Que Street. N W.. Woshington. D.C. 20009 (202)234 9382 September 13, 1984 Director Office of Administration FREEDOM OF INFORMATX)N U.S. Nuclear Regulatory Commission ACT REQUEST Washington DC 20555 hM gY-Jg To Whom It May Concern: | |||
9 -/ 7 - 7 Pursuant to the Freedom of Information Act (FOIA), 5 U.S.C. $552, the Government Accountability Project (GAP) request copies of any and all agency records and information, including but not limited to notes, letters, memoranda, draf ts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview reports, procedures, instructions, files, graphs, engineering analyses, charts, maps, photo-graphs, agreements, handwritten notes, studies, data sheets, notebooks, books, tele-phone messages, computations, voice recordings, any other data compilations, interim and/or final reports,-status reports, and any other records relevant to and/or generated in connection with the Safety Evaluation Report related to the operation of the Diablo Canyon Nuclear Power Plant, Unit I and 2, NUREG-0675, Supplement No. 26, which provided the NRC Staff's further findings on whistleblower charges. We request that each responsive document be identified by the allegation number (s) to which it may relate. | |||
If any of the materials covered by this request have been destroyed and/or removed, please provide all surrounding documentation, including but not limited to a de-scription of the action (s) taken, relevant date(s), and justification (s) for the action (s). | |||
CAP request that fees be waived, because " findings information can be considered as primarily benefitting the general public," 5 U.S.C. 5552(a)(4)(A). GAP is a non-profit, non-partisan public interest organization concerned with honest and open government. Through legal representation, advice, national conferences, films, pub-lications and public outreach, the project promotes; whistleblowers as agents of government accountability. We are requesting the above information as part of an on-going monitoring project on the adequacy of the NRC's efforts to protect public safety and health at nuclear power plants. | |||
For any documents or portions that you deny due to a specific FOIA exemption, please provide an index itemizing and describing the documents or portion of documents withheld. The index should provide a detailed justification of your grounds for claiming each exemption, explaining why each exemption is relevant to the document or portion of the document withheld. This index is required under Vaughn v. Rosen(I), | |||
484 F.2d. 820 (D.C. Cir. 1973), cert. denied, 415 U.S. 977 (1974). | |||
We look forward to your response to this request within ten days. | |||
Yours truly, m .-. | |||
5) omas Devine Cr{stal y Dixon Legal Director, GAP Legal Intern | |||
+ j | |||
, GOVERNMENT ACCOUNTADIUTY PROJECT Institute for Pohty Studies 1901 Que Street. N W . Washington. D C. 20000 (202)234 9382 September 13, 1984 FREEDOM OF INFORMATIOh Director ACI REQUEST Office of Administration U.S. Nuclear Regulatory Commission hg ~ | |||
Washington DC 20555 kQg To Whom It May Concern: | |||
Pursuant to the Freedom of Information Act (FOIA), 5 U.S.C. 5552, the Government Accountability Project (GA?) request copies of any and all agency records and information, including but not limited to notes, letters, memoranda, draf ts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview reports, procedures, , instructions, files, graphs, engineering analyses, charts, maps, photo-graphs, agreements, handwritten notes, studies, data sheets, notebooks, books, tele-phone messages, computations, voice recordings, any other data compilations, interim and/or final reports, status reports, and any other records relevant to and/or generated in connection with the Safety Evaluation Report related to the operation of the Diablo Canyon Nuclear Power Plant, Unit 1 and 2, NUREG-0675, Supplement No. 22, which provided the NRC Staff's further findings on whistleblower charges. We request that each responsive document be identified by the allegation number (s) to which it may relate. | |||
-If any of the materials covered by this request has been destroyed and/or removed, please provide all surrounding documentation, including but not limited to a de-scription of the action (s) taken, relevant date(s), and justification (s) for the action (s). | |||
GAP request that fees be waived, because " findings information can be considered as primarily benefitting the general public," 5 U.S.C. 8552(a)(4)(A). GAP is a non-profit, non-partisan public interest organization concerned with honest and open government. Through legal representation, advice, national conferences, films, pub-lications and public outreach, the project promotes whistleblowers as agents of government accountability. We are requesting the above information as part of an on-going monitoring project on the adequacy of the NRC's efforts to protect public safety and health at nuclear power plants. | |||
For any documents or portions that you deny due to a specific FOIA exemption, please provide an index itemizing and describing the documents or portion of documents withheld. The index should provide a detailed justification of your grounds for claiming each exemption, explaining why each exemption is relevant to the document or portion of the document withheld. This index is required under Vaughn v. Rosen(I), | |||
484 F.2d. 820 (D.C. Cir.1973), cert. denied, 415 U.S. 977 (1974) . | |||
We look forward to your response to this request within ten days. | |||
Your truly Ad Thomas Devine hMhD Crystal Dixon Legal Director - | |||
Legal Intern M w/ q. .}} |
Latest revision as of 14:44, 13 May 2021
ML20213F851 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 05/13/1987 |
From: | Grimsley D NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
To: | Devine, Dixon GOVERNMENT ACCOUNTABILITY PROJECT |
References | |
FOIA-84-741, FOIA-84-742, FOIA-84-743, FOIA-84-744 NUDOCS 8705180015 | |
Download: ML20213F851 (6) | |
Text
U.S. NUCLEAR RE!ULATCRY COMMISSCN NRc soia rEovEst kuvatasi f - ~ h, Fim A -H.EseoNsE -74/cmt Tere B Y-7R y.
sE 1 I RESPONSE TO FREEDOM OF h"^'
W"'"
INFORMATION ACT (FOIA) REQUEST
\es.e/ e 00cmET NUMBEntSlid epseel N 13 987 1 i.EQUESTER
$6 Wb De PART 3.-RECORDS RELEASED OR NOT LOCATED ISee checked bones)
No agency records subsect to the request have been located.
No additonal agency records subsect to the request have been located Agency records subject to the request that are identified in Appe%s Y sie already avadable for public inspecten and copying in the NRC Public Document Room, 1717 H Street, N.W., Washington, DC.
Agency records subject to the request that are identifed in Appendia are being made available for public inspecten and copying in the NRC Public Document Moom,1717 H Street, N W., Washington, DC in a folder under this FOIA number and requester name.
The nonpropnetary versen of the proposaHsl that you agreed to accept m a telephone conversaten with a member of my staff is now being made avaiable for public inspection and coving at the NRC Pubhc Document Room,1717 H Street N W., Washington, DC,in a folder under the FOIA number and requester name.
Enclosed is informaton as how you may obtain access to and the charges for copying records placed in the NRC Public Document Room,1717 H Street, N.W., Washington, DC.
Agency records subject to the request are enclosed. Any apphcable charge for copes of the records provided and payment procedures are noted in the comments section.
Records subject to the request have been referred to another Federal agencylies) for revew and direct response to you.
In vow of NRC's response to the request, no further action a being taken on appealletter dated PART ll.A-INFORMATION WITHHELD FROM PU8LIC DISCLOSURE Certam informaton in the requested records is being wrthheld from pubhc disclosure pursuant to the FOIA enemptons desenbod in and for the reasons stated in Part it, sec-tons 8, C. and D. Any released portens c4 the documents for which only part of the record is beeng withheld are being made evaslable for public inspection and copying in tha NRC Public Document Room,1717 H Street, N.W,, Washington, DC, in a folder under the FOlA number and requester name.
Comments M g it7t/ N L 7 Q w .Fe&
M~74{.
Qw 6 a w aparab of me-#W3 8705180015 PDR FOIA 870513 DEVINE84-741 PDR Si N 'URE. DIRECTOR PV1SION 5 RULES AND RECOROS W .
T s
NRC FOIM 464 :Part 0 isc
- .. . -. . -. . .. - . ~ . - . . . . - - . . . - _ _ _ _ _ _ _ _ _ -
e Re: F01A-84-741, F01A-84-742, F01A-84-743 and F01A-84-744 APPENDIX H RECORDS MAINTAINED AMONG PDR FILES
- 1. Undated Table 3.3-5 (Continued) Table Notation. (2 pages) PDR#
8409280391
- 2. Undated Affidavit for PG8E to applie to amend its Diablo Anyon Power Plant (DCPP) Facility Operating License No, DPR-76 (License). (1 page) PDRf 8409280389
- 4. Undated Affidavit of Faust Rosa Regarding Residential Heat Removal System. (17 pages) PDR # 8403190122
8403190110 1 6. Undated Affidavit of James P. Knight. Regarding the Joint Intervenors' Motion to Augment or, in the Alternative, to Reopen the Record. (16 pages) PDR # 8403190102 j 7. Undated Affidavit of Dr. Mark Hartzman, Regarding the Joint
! Intervenors' Motion to Augment or, in the Alternative, to Reopen the Record. (22 pages) PDR # 3403190106
- 8. 7/25/80 Ltr to Crouse from Reid, w/ attached Docket No. 50-346(14 pages) PDR # 8008050513 l
} 9. 10/26/83 Memo for Eisenhut from Bishop re Allegations Concerning j
! the Residual Heat Removal System, Diablo Canyon Units 1 and 2, I l
Docket hos. 50-275 and 50-323, Allegation No. RV-83-A-0047 l l w/ attachments (10 pages) PDR# 8310310274 !
- 10. 11/25/83 Memo to Distribution (See attached) from Bishop, subject:
Diablo Canyon Allegation Management - Assignment Update.
(6 pages) PDR # 8312010118
, 11. 11/29/83 Memo for Attched List from Knighton re: Guidance for Preparation of the Diablo Canyon Allegations Evaluation
- PDR# 8312090368
- 12. 11/30/83 Memo for attached list from Knighton, subject: Guidance for Preparation of the Diablo Canyon Allegations Evaluation. (3 pages) PDR # 8312090330 1 I
3 .
Re: F01A-84-741, F01A-84-742, F0lA-84-743 and F01A-84-744 APPENDIX H (Continued)
RECORDS MAINTAINED AMONG PDR FILES
- 13. 12/9/83 Memo for Eisenhut from Mattson, subject: Response to Diablo Canyon Allegations. (27 pages) PDR # 8501230029
- 14. 1/17/84 Memo for Novak from Houston, subject: Low Pressure Injection Flow Alarm, re: 12/9/83 memo (Mattson to Eisenhut). (5 pages) PDR # 8402030068
- 15. 1/23/84 Memo for Hayes from Ebersole, subject: Allegations Regarding Construction Practices at the Diablo Canyon Nuclear Power Station. (2 pages) PDR # 8603280174
- 16. 2/2/84 Petition Pursuant to 10 CFR 2.206 (53 pages) PDR # 1 8403060303
- 17. 2/6/84 Memo for Houston, Rubenstein and Booher from Novak, subject: Diablo Canyon ACRS Briefing on February 10, 1984 (2 pages) PDR # 8402130301, w/ attached: Advisory Committee on Reactor Safeguards Subcommittee on Diablo Canyon (3 pages) PDR # 8401250088 (288 pages) 18, 3/15/84 Memo for Novak from Houston, subject: Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Staff Affidavits in Response to the Affidavit of John H. Cooper dated 1/19/84 and to Allegation No. 177. (1 page) PDR # 8404050267 w/ attached: Affidavit of Chu-Yu Liang (30 pages) PDR #
8403190119
- 19. 3/15/84 NRC Staff's Answer to Joint Intervenors' Motion to Augment or, in the Alternative, To Reopen the Record.
(29pages) PDR # 8403190100
- 20. 3/29/84 Ltr to Denton from D.A. Brand, PG&E, re: Docket No.
50-275, OL-DPR-76, Docket No. 50-323, Diablo Canyon Units 1 and 2, 10 CFR 2.206 Petition by GAP dated February 2, i 1984. (41 pages) PDR # 8404030051 l l
- 21. 4/19/84 Memo for Knighton from Sheron, subject: Diablo Canyon Units 1 and 2 - RHR Suction Line Isolation Valves. (4 pages) PDR # 8405020415
- 22. 4/30/84 Ltr to Denton from PG&E, re: Docket No.
50-275, OL-DPR-76, Docket No. 50-323, Diablo Canyon Units I and 2, 10 CFR 2.206 Petition by GAP dated March 1, 1984.(10pages) POR # 8405180261
ke: F01A-84-741, F01A-84-742, F01A-84-743 and F01A-84-744 APPENDIX (Continued)H RECORDS MAINTAINED AMONG PDR FILES
- 23. 5/9/84 Ltr to Knighton from Schuyler, re: Docket No.
50-275, OL-DPR-76, Docket No. 50-323, Diablo Canyon Units 1 and 2, SSER 21 and 22 Item 100-Painting Inside Containment. (5 pages) PDR # 8405140406
- 24. 5/21/84 Ltr to Schuyler from Knighton subject: Diablo Canyon -
RHR Suction Line Isolation Valves. (4 pages)
PDR # 8406040115
- 25. 5/22/84 Ltr to Document Control Msk from Shiffer, re: Docket No.
50-275, OL-DPR-76, Diablo Canyon Unit 1, Licensee Event Report 83-034/0lT-1 Improper Wiring - RHR Pump Centrol Circuit. (3 pages) POR i 8405300098
- 26. 5/24/84 Ltr to Knighton from Scouyler, re: Docket No. 50-275, OL-DPR-76, RHR System Low Flow Alarm. (2 pages)
PDR # 8405300276
- 27. 5/31/84 Ltr to Hans Schierling from Thomas Devine, GAP (2 pages) w/ attached Affidavit (54 pages) PDR # 8406250316
- 28. 6/6/E4 Ltr to Knighton from Scttuyler, re: Occket No 50-275, OL-DPR-76 RHR System Lcw Flow Alarm. (1 page)
PDR # 8406110183
- 29. 6/8/84 Ltr to Knighton from Schuyler, re: Cocket No. 50-275, OL-DPR-76, Docket 50-323, Diablo Canyon Units 1 and 2 Request for Additional Initial Test. (12 pages)
, POR # 8406120458 30, 7/2/84 Ltr to Knighton from J.0. Schuyler, re: Docket No. 50-275 OL-DPR-76 Diablo Canyon Unit 1. RHR System Low Flow Alarm (2pages) PDR # 8407090213
- 31. 7/3/84 Memo for Denton from Eisenhut, subject: Diablo Can Unit 1 - Full Power License Matters and Schedule (yon 5pages)
PDR # 8407230278
- 32. 7/10/84 Memo to Novak from Houston, subject: Diablo Canyon Nuclear Power Plant, Units 1 and 2 - SER Supplement No.
- 24. (9 pages) IDR # 8408290207 t
Re: F0IA-84-741, F01A-84-742, F01A-84-743 and F01A-84-744 APPENDIX f-(Continued) l RECORDS MAINTAINED AMONG PDR FILES
- 33. 7/10/84 Memo for hovak from Houston, subject: Diablo Canyon Nuclear Power Plant, Units 1 and 2 - SER Supplement No.
26.(25pages) PDR k E408290207
- 34. 7/31/84 Ltr to Knighton from Schuyler re: Docket No. 50-323, Diablo Canyon Unit 2 Internal Review Program Summary and Status Report. (49 pages) PDR i 8408060126
. 35. 7/31/84 Ltr to Knighton from Schuyler re: Docket No. 50-323, Diablo Car. yon Unit 2, l' nit 2 Specific Design Aspects. (5 pages) PDR # 8408070278
] 36. '1/10/84 Memo for Eernero, Bishop, Grace Thompson, and Vollmer from Eisenhut, subject: Diablo Canyon Unit 2 - Licensing andReviewStatus.(2peges) PDR # 8410020068
- 37. 9/10/E4 Meeting Notice Distributton. (3pages) PDR # 8409190150
]
- 38. 9/21/84 Ltr to Denton from Brand, re: Docket No 50-275,
- OL-DPR-76 Diablo Canyon Unit 1 License Amendment Request 84-10FeedwaterBypassYalves.(1page) PDR # 8409280387
- 39. 9/25/84 Ltr to Schuyler from Krdghton, subject: NRC Site Visit Regarding RHR S Test. (9 pages)ystem and Natural Circulation / Boron Mixing PDR e 8410150621 '
- 40. 10/3/84 Memo for Bernero, Grace., Speis, Thompson, and Vollmer from Eisenhut, subject: DiabloCanyonUnit2 Review.(8 papos) PDR 8410240359 l
- 41. 10/6/34 Ltr to Eisenhut from $chuyler, re: Docket No. 50-323 l DiabloCanyonUnit2DesignReview.(12pages) j PDR # 8310170471
- 42. 10/19/84 Memo for Attached list from Knighton, subdect
- ' Technical Specifications for Diablo Canyon Unit 2. (2 pages)
- PDR i 8410310246 i 43. 11/2/84 Ltr to Knighton fron Shlffer, re
- Docket No. 50-323 Diablo Canyon Unit 2. Allegation Review Program Status Report. (176pages) PDR # 8411150035 i
1 l
f
Re: FOIA-84-741, F01A-84-742 F0!A-84-743 and F01A-84-744 APPENDIX Fi
- (Continued) i RECORDS MAINTAINED AMONG PDR FILES
- 44. 11/30/84 Distribution for Memo dtd 11/30/84 (4 pages) PDR i 8501070463 45, 12/10/84 Memo for Knighton from Sheron, subject: Diablo Canyon Allegations. (2 pages) PDR # 8412140319
- 46. 1/11/85 Ltr to Knighton from Shiffer, re: Docket No. 50-323 Diablo Canyon Unit 2, RHR Low Flow Alarm System. (1 page)
PDR # 8501170049
) 47. 1/11/85 Memo for Kirsch, Vollmer, Grace, Speis, Thompson and Bernero from Eisenhut, subject: Diablo Canyon Unit 2 Review. (6 pages) PDR # 8501160245 I
i I
)
i l
l
)
i f
GOVERNMENT ACCOUNTADill1Y PROJECT Institute for Pokey Studies 1901 Que Street N.W., Washington. D.C 20009 (202)234 9382 September 13, 1984 Director FREEDOM 07 gygg Office of Administration U.S. Nuclear Regulatory Coct:aission ( ACI REQUESI N Washington, D.C. 20555 '
b ~8 k-7 yf To Whom It May Concern: W 9"/7 '8 h Pursuant to the Freedom of Information Act (FOIA), 5 U.S.C. 9552, the Government Accountability Project (GAP) requests copies of any and all agency remrds and informat ion, including but not limited to notes, letters, memoranda, u afts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview reports, procedures, instructions, files, graphs, engineering analyses, charts, maps, photographs, agreements, handwritten notes, studies, data sheets, notebooks, books, telephone messages, computations, voice recordings, any other data compila-tions, interha and/or final reports, status reports, and any other records relevant to and/or generated in connection with the August 20, 1984 directors.'. decision under 10 C.F.R. 2.206 in r esponse to various petitions filed pursuant to 10 C.F.R. 2.206 by the Covernment Accountability Project (GAP) on behalf of the San Louis Obispo, Mothers for Peace. We request that each responsive document be identified by the allegation number (s) to which it may relate.
If any of the materials covered by this request have been destroyed and/or removed, please provide all surrounding documentation, including but not limited to a description of the action (s) taken, relevant date(s), and justification (s) for the action (s).
GAP requests that fees be waived, because " findings information can be considered as primarily benefitting the general public," 5 U.S.C. E552(a)(4)(A). GAP is a non-profit, non-partisan public interest organization concerned with honest and open government. Through legal representation, advice, national conferences, films, publications and public outreach, the project promotes whistleblowers as agents of government accountability. We are requesting the above information as part of an on-going monitoring project on the adequacy of the NRC's efforts to protect public safety and he.alth at nuclear power plants.
For any documents or portions that you deny due to the specific FOIA exemption, please provide an index itemizing and describing the documents or portions of documents withheld. The index should provide a detailed justification of your grounds for claiming each exemption, explaining why each exemption is relevant to the document or portion of the document withheld. This index is required under Vaughn v. Rosen(I), 484 F.2d. 820 (D.C. Cir.1973), cert. denied, 415 U.S. 977 (1974) .
We look forward to your response to this request within ten days.
l h4l-Thomas Devine Cr tal Dixon Legal Director Legal Intern
+
M. -T .
GOVERNMENT ACCOUNTADIUTY PROJECT Institute for Pohcy 5tudies 100tCve Street N W . Woshington D C. 20000 (202) 234E i>- i. . .. , u u . , n . ,, , 6 b nu September 13 , 1984 Director FREEDOM OF INFogg Of fice of Administration ACT REQUES U.S. Nuclear Regulatory Commission Washington, D.C. 20555 h[$ g 2 g y {
To Whom It May Concern:
Get 'd 9 e< '
Pursuant to the Freedom of Information Act (F01A), 5 U.S.C. 9552, the Government Accountability Project (CAP) requests copies of any and all agency records and informat ion, including but not limited to notes, letters, memoranda, draf ts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview reports, procedures, instructions, files, graphs, engineering analyses, charts, maps, photographs, agreements, handwritten notes, studies, data sheets, notebook:2, books, telephone messages, computations, voice recordings, and any other records relevant to and/or generated in connection with the interim directors' decision under 10 C.F.R. 2.206 in response to July 27,1984, July 29,1984, July 30,1984, and July 31, 1984 petitions filed under 10 C.F.R. 2.206 on behalf of Timothy O'Neill and James McDermott. We request that each responsive document be indenti-fied by the allegation number (s) to which it may relate.
If any of the materials covered by this request have been destroyed and/or removed, please provide all surrounding documentation, including but not limited to a description of the action (s) taken, relevant date(s), and justification (s) for the action (s).
GAP requests that fees be waived, because " findings information can be considered as primarily benefitting the general public," 5 U.S.C. 8552(a)(4)(A). GAP is a non-profit, non-partisan public interest organization concerned with honest and open government. Through legal representation, advice, national conferences, films, publications and public outreach, the project promotes whistleblowers as agents of government accountability. We are requesting the above information as part of an on-going monitoring project on the adequacy of the NRC's efforts to protect public safety and health at nuclear power plants.
For any documents or portions that you deny due to the specific FOIA exemption, please provide an index itemizing and describing the documents or portions of , j documents withheld. The index should provide a detailed justification of your grounds for claiming each exemption, explaining why such exemption is relevant to the document or portion of the document withheld. This index is required under Vaughn v. Rosen(I), 484 F.2d 820 (D.C. Cir.1973), cert. denied, 415 U.S. 977 (1974:
We look forward to your response to this request within ten days. I Your truly, Thomas Devine O CnMW Crystal Dixon Legal Director Legal Intern I
l
%5c,%'f0f85 .
. GOVERNMENT ACCOUNTADIUTY PROJECT Institute for Pohcy Studies l 1901 Que Street. N W.. Woshington. D.C. 20009 (202)234 9382 September 13, 1984 Director Office of Administration FREEDOM OF INFORMATX)N U.S. Nuclear Regulatory Commission ACT REQUEST Washington DC 20555 hM gY-Jg To Whom It May Concern:
9 -/ 7 - 7 Pursuant to the Freedom of Information Act (FOIA), 5 U.S.C. $552, the Government Accountability Project (GAP) request copies of any and all agency records and information, including but not limited to notes, letters, memoranda, draf ts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview reports, procedures, instructions, files, graphs, engineering analyses, charts, maps, photo-graphs, agreements, handwritten notes, studies, data sheets, notebooks, books, tele-phone messages, computations, voice recordings, any other data compilations, interim and/or final reports,-status reports, and any other records relevant to and/or generated in connection with the Safety Evaluation Report related to the operation of the Diablo Canyon Nuclear Power Plant, Unit I and 2, NUREG-0675, Supplement No. 26, which provided the NRC Staff's further findings on whistleblower charges. We request that each responsive document be identified by the allegation number (s) to which it may relate.
If any of the materials covered by this request have been destroyed and/or removed, please provide all surrounding documentation, including but not limited to a de-scription of the action (s) taken, relevant date(s), and justification (s) for the action (s).
CAP request that fees be waived, because " findings information can be considered as primarily benefitting the general public," 5 U.S.C. 5552(a)(4)(A). GAP is a non-profit, non-partisan public interest organization concerned with honest and open government. Through legal representation, advice, national conferences, films, pub-lications and public outreach, the project promotes; whistleblowers as agents of government accountability. We are requesting the above information as part of an on-going monitoring project on the adequacy of the NRC's efforts to protect public safety and health at nuclear power plants.
For any documents or portions that you deny due to a specific FOIA exemption, please provide an index itemizing and describing the documents or portion of documents withheld. The index should provide a detailed justification of your grounds for claiming each exemption, explaining why each exemption is relevant to the document or portion of the document withheld. This index is required under Vaughn v. Rosen(I),
484 F.2d. 820 (D.C. Cir. 1973), cert. denied, 415 U.S. 977 (1974).
We look forward to your response to this request within ten days.
Yours truly, m .-.
5) omas Devine Cr{stal y Dixon Legal Director, GAP Legal Intern
+ j
, GOVERNMENT ACCOUNTADIUTY PROJECT Institute for Pohty Studies 1901 Que Street. N W . Washington. D C. 20000 (202)234 9382 September 13, 1984 FREEDOM OF INFORMATIOh Director ACI REQUEST Office of Administration U.S. Nuclear Regulatory Commission hg ~
Washington DC 20555 kQg To Whom It May Concern:
Pursuant to the Freedom of Information Act (FOIA), 5 U.S.C. 5552, the Government Accountability Project (GA?) request copies of any and all agency records and information, including but not limited to notes, letters, memoranda, draf ts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview reports, procedures, , instructions, files, graphs, engineering analyses, charts, maps, photo-graphs, agreements, handwritten notes, studies, data sheets, notebooks, books, tele-phone messages, computations, voice recordings, any other data compilations, interim and/or final reports, status reports, and any other records relevant to and/or generated in connection with the Safety Evaluation Report related to the operation of the Diablo Canyon Nuclear Power Plant, Unit 1 and 2, NUREG-0675, Supplement No. 22, which provided the NRC Staff's further findings on whistleblower charges. We request that each responsive document be identified by the allegation number (s) to which it may relate.
-If any of the materials covered by this request has been destroyed and/or removed, please provide all surrounding documentation, including but not limited to a de-scription of the action (s) taken, relevant date(s), and justification (s) for the action (s).
GAP request that fees be waived, because " findings information can be considered as primarily benefitting the general public," 5 U.S.C. 8552(a)(4)(A). GAP is a non-profit, non-partisan public interest organization concerned with honest and open government. Through legal representation, advice, national conferences, films, pub-lications and public outreach, the project promotes whistleblowers as agents of government accountability. We are requesting the above information as part of an on-going monitoring project on the adequacy of the NRC's efforts to protect public safety and health at nuclear power plants.
For any documents or portions that you deny due to a specific FOIA exemption, please provide an index itemizing and describing the documents or portion of documents withheld. The index should provide a detailed justification of your grounds for claiming each exemption, explaining why each exemption is relevant to the document or portion of the document withheld. This index is required under Vaughn v. Rosen(I),
484 F.2d. 820 (D.C. Cir.1973), cert. denied, 415 U.S. 977 (1974) .
We look forward to your response to this request within ten days.
Your truly Ad Thomas Devine hMhD Crystal Dixon Legal Director -
Legal Intern M w/ q. .