IR 05000400/1986013: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML20199E247
| number = ML20202J368
| issue date = 06/17/1986
| issue date = 04/04/1986
| title = Corrects Security Insp Rept 50-400/86-13 to 50-400/86-19
| title = Preoperational Insp Rept 50-400/86-13 on 860310-13.No Violation or Deviation Noted.Major Areas Inspected:Security Program & Organization,Security Audit & Physical Barriers. Details Withheld (Ref 10CFR2.790(d) & 73.21)
| author name = Verrelli D
| author name = Mcguire D, Tobin W
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| addressee name = Utley E
| addressee name =  
| addressee affiliation = CAROLINA POWER & LIGHT CO.
| addressee affiliation =  
| docket = 05000400
| docket = 05000400
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = NUDOCS 8606230241
| document report number = 50-400-86-13-01, 50-400-86-13-1, NUDOCS 8604160011
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| package number = ML20202J367
| document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 1
| page count = 1
}}
}}
Line 18: Line 19:


=Text=
=Text=
{{#Wiki_filter:JUN 1719g5 Carolina Power and Light Company ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:
{{#Wiki_filter:y AFEGUARDS INFORMhTION UNITED STATES
SUBJECT: REPORT NO. 50-400/86-13 Due to an administrative error, the subject report number was incorrectly assigned to two inspection efforts. Please correct your records to reflect the security inspection performed March 10-13, 1986 at the Shearon Harris facility is now documented under Inspection Report Number 50-400/86-1 Thank you for your cooperatio t N p.rt). Vwrdh-D. M. Verrelli cc: R. A. Watson, Vice President Harris Nuclear Project R. M. Parsons, Project General Manager J. L. Willis, Plant General Manager
[em af Cg''o,^
,
? \
bec: IE File NMSS/SGPL NRR/DL/SSPB Oocument Control Desk, 016 NRC Resident Inspector
NUCLEAR REGULATORY COMMISSION f/  R EGION 11 h (I .M
; State of North Carolina RII
*
    ~
r
RII .%   R
,
% *'   dW WTobin re arr PStohr P redrickson 6/g/86 6/p/86 6/g/86 6//7/86 6/p/86 i
e 101 MARIETTA STREET. ATL ANTA. GEORGt A 30323 y/*"**
(
APR 09 986'
'
Report No. 50-400/86-13 Licensee: Carelina Power and Light Company 411 Lafayette Street Raleigh, NC 27602 Docket No. 50-400   License No. CPPR-158 Facility Name: Shearon Harris Nuclear Power Plant Inspection Date: March 10-13, 1986 Inspector: 1tf)CAbl tfn
      \
  .hW.Tobid,   '/b b nior Securitp Inspector Date Signed Approved by: h v _ _4o -
8606230241 860617    QO
      // 86 D. R. McGuire, Chief, Physical Security Section  ~
      <
Ddte ' Signed Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope: This announced pre-operational inspection involved 24 hours inspecting the following areas: Plan / Procedures, Security Program and Organization, Security Audit, Maintenance, Physical Barriers, Compensatory Measures, Communications, and Contingency Pla Results:
PDR ADOCK 05000400 G  PDR   h/ g
The licensee continues to meet its schedule for the final installation and implementation of its security program.
.
 
avm + v-  *N  -m -
8604160011 860409      1 PDR ADOCK 05000400 G  PDR ENCLOSURE CONTAINS I UPON 5F.PARATION THIS PAGE IS DECONTROLLED.
t-- 7
}}
}}

Latest revision as of 09:06, 1 January 2021

Preoperational Insp Rept 50-400/86-13 on 860310-13.No Violation or Deviation Noted.Major Areas Inspected:Security Program & Organization,Security Audit & Physical Barriers. Details Withheld (Ref 10CFR2.790(d) & 73.21)
ML20202J368
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/04/1986
From: Mcguire D, Tobin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20202J367 List:
References
50-400-86-13-01, 50-400-86-13-1, NUDOCS 8604160011
Download: ML20202J368 (1)


Text

y AFEGUARDS INFORMhTION UNITED STATES

[em af Cgo,^

? \

NUCLEAR REGULATORY COMMISSION f/ R EGION 11 h (I .M

r

,

e 101 MARIETTA STREET. ATL ANTA. GEORGt A 30323 y/*"**

APR 09 986'

Report No. 50-400/86-13 Licensee: Carelina Power and Light Company 411 Lafayette Street Raleigh, NC 27602 Docket No. 50-400 License No. CPPR-158 Facility Name: Shearon Harris Nuclear Power Plant Inspection Date: March 10-13, 1986 Inspector: 1tf)CAbl tfn

.hW.Tobid, '/b b nior Securitp Inspector Date Signed Approved by: h v _ _4o -

// 86 D. R. McGuire, Chief, Physical Security Section ~

Ddte ' Signed Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope: This announced pre-operational inspection involved 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> inspecting the following areas: Plan / Procedures, Security Program and Organization, Security Audit, Maintenance, Physical Barriers, Compensatory Measures, Communications, and Contingency Pla Results:

The licensee continues to meet its schedule for the final installation and implementation of its security program.

8604160011 860409 1 PDR ADOCK 05000400 G PDR ENCLOSURE CONTAINS I UPON 5F.PARATION THIS PAGE IS DECONTROLLED.