| title = Insp Rept 50-302/88-26 on 880813-0916.Violations Noted. Major Areas Inspected:Plant Operations,Security,Radiological Controls,Lers & Nonconforming Operations Repts,Facility Mods & Licensee Action on Previous Insp Items | |||
| author name = Crlenjak R, Holmesray P, Tedrow J | |||
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) | |||
| addressee name = | |||
| addressee affiliation = | |||
| docket = 05000302 | |||
| license number = | |||
| contact person = | |||
| document report number = 50-302-88-26, NUDOCS 8810250257 | |||
| package number = ML20204J755 | |||
| document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS | |||
| page count = 13 | |||
}} | |||
See also: [[see also::IR 05000302/1988026]] | |||
=Text= | |||
{{#Wiki_filter:- | |||
* | |||
. | |||
#i csen | |||
* | |||
. $ o | |||
y* 't UNITED STATES | |||
g .j e | |||
NUCLEAR REGULATORY COMMISSION | |||
o REGION 11 | |||
\ ,,,, | |||
e | |||
101 MARIETTA ST., N.W. | |||
ATLANTA. GEORGIA 30323 | |||
Report No: 50-302/88-26 | |||
Licensee: orida Power Corporation | |||
3201 34th Street, South | |||
St. Petersburg, FL 33733 | |||
Occket No: 50-302 License No.: DPR-72 | |||
Factitty Name: Crystal River 3 | |||
Inspection Conducted: August 13 - September 16, 1988 | |||
Inspectors: W. $ 4 Jet /0 /[88 | |||
Date Signed | |||
P.Aolmes-Ray,SengrRe.identInspector | |||
knvdas u, to M rs | |||
J. Tedro , esidet{ Inspector Da~te' Signed | |||
Approved by:_ | |||
R. | |||
./ e , M | |||
TeAjak, Secj#6fi' Chief V | |||
8 | |||
/ gate:Gigned | |||
D' ision of Reaftor Projects | |||
SUMMARY | |||
Scope: This routine inspection was conducted by two resident inspectors in | |||
the areas of plant operations, security, radiological controls, | |||
Licensee Event Reports and Nonconforming Operations Reports, facility | |||
modifications, and licensee action on previous inspection items. | |||
Numerous facility tours were conducted and facility operations | |||
observed. Some of these tours and observations were conducted on | |||
backshifts. | |||
' | |||
' | |||
Rasults: Ona violation and one * unresolved item were identified: Failure to | |||
report a condition prohibited by the technical specifications, | |||
paragraph 3.b(1); Inspection of quality items stored in staging | |||
areas, paragraph 3.b(3). | |||
* Unresolved items are a matter about which more information is required to ; | |||
determine whether they are acceptable or may involve violttio9s or deviations. , | |||
i | |||
: | |||
i | |||
! | |||
G810150257 882oo5 | |||
- | |||
DR | |||
ADOCK 05000302 | |||
. PDC | |||
_ _ _ _ _ _ _ - _ _ _ _ - _ - - _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ | |||
. | |||
** a o | |||
, | |||
f s rec ,*q | |||
#' 4 UNITED STATES | |||
j. | |||
o | |||
j | |||
e | |||
NUCLEAR REGULATORY COMMISSION | |||
REGION 11 | |||
- | |||
*,[ 101 MARIETTA ST N.W. | |||
ATLANTA GEORGIA 30323 | |||
e,,,, | |||
Report No: 50-302/88-26 | |||
Licensee: Florida Power Corporation | |||
3201 34th Street, South | |||
St. Petersburg, FL 33733 | |||
Docket No: 50-302 License No.: OPR-72 | |||
Facility Name: Crystal River 3 | |||
Inspection Conducted: August 13 - September 16, 1988 | |||
Inspectprs: W. 5 /m /0[V[88_ | |||
D. fiolmes~-Ray, SengY Resident inspector Dafe $1gnecf- | |||
% &<b | |||
J. Tedro , eside | |||
r | |||
nspector | |||
'o M r? | |||
Da'te' Signed | |||
Approved by: | |||
R. | |||
m e , | |||
rte /Jak, Sec Chief V | |||
) M_ | |||
/ffate/ Signed | |||
O' ision of Rea tor Projects | |||
SUMMARY | |||
Scope: This routine inspection was conducted by two resident inspectors in | |||
the areas of plant operations, security, radiological controls, | |||
Licensee Event Reports and Nonconforming Operations Reports, facility | |||
modifications, and licensee action on previous inspection items. | |||
Numerous facility tours were conducted and facility operations | |||
observed. Some of these tours and observations were conducted on | |||
backshifts. l | |||
l | |||
Results: One violation and one * unresolved item were identified: Failure to j | |||
ieport a condition prohibited by the technical specifications, | |||
paragraph 3 b(1); Inspection of quality items stored in staging | |||
areas, paragraph 3.b(3). | |||
* Unresolved items are a matter about which more information is required to | |||
determina whether they are acceptable or may involve violations or deviations. | |||
, | |||
i | |||
. | |||
- . _ | |||
. . - . | |||
. . . | |||
. | |||
l | |||
, | |||
REPORT DETAILS | |||
' | |||
3. Persons Contacted | |||
Licensee Employees | |||
J. Alberdi, Manager, Nuclear Plant Technical Support | |||
*F. Bailey, Superintendent, Nuclear Projects | |||
' | |||
r | |||
4 | |||
*P. Bassa, Nuclear Security Specialist | |||
*G. Becker, Manager, Site Nuclear Engineering Services | |||
*R. Blume, Nuclear-Team Instructor | |||
*J. Brandely, Manager, Nuclear Integrated Planning | |||
, | |||
*J. Bufe'-Carr, Nuclear Regulatory Specialist | |||
. *M. Collins, Superintendent, Nuclear Safety and Reliability | |||
"J. Cooper, Superintendent,-Technical Support | |||
B. Hickle, Manager, Nuclear Plant Operations | |||
*M. Jones, Nuclear Modifications Specialist | |||
1 | |||
' | |||
H. Liles, Nuclear Operations Technical Advisor ; | |||
*S. Mansfield, Nuclear Team Instructor | |||
P. McKee, Director, Nuclear Plant Operations | |||
*L. Moffatt, Nuclear Safety Supervisor ( | |||
' | |||
R. Murgatroyd, Superintendent, Nuclear Maintenance ; | |||
*T. Neaman, Nuclear Security Specialist f' | |||
i "J. Roberts, Manager, Nuclear Chemistry | |||
4 | |||
5. Robinson, Superintendent, Nuclear Chemistry and Radiation " | |||
l Protection | |||
j V. Roppel, Manager, Nuclear Operations Mairtenance and CJtages | |||
< | |||
*W. Rossfeld, Manager, Nuclear Compliance | |||
L. Sexton, Senior Nuclear Mechanical Engineer | |||
- | |||
*L. Snow, Occuments Clerk I | |||
R. Watts, Manager, Nuclear Operations Purchasing and Contracting | |||
*R. Widell, Director, Nuclear Operations Site Support | |||
*M. Williams, Nuclear Regul't:*, Specialist i | |||
Other licensee employees contacted included office, operations, | |||
J | |||
engineering, maintenance, chemistry / radiation and corporate personnel, j | |||
Pinkerton Corporation ! | |||
, | |||
*F. Harman, Project Manager | |||
. | |||
"Attended exit interview | |||
. | |||
Acronyms and initialisms used throughout this report are listed in the ; | |||
j last paragraph. ! | |||
j | |||
! | |||
< | |||
: | |||
; | |||
l ! | |||
J | |||
' | |||
! | |||
I | |||
4 | |||
,, -y.y-,. -, , -.----,,.,--------,-v-- - ---- | |||
.-e-w -- -w, c-----rn*--r- . - - , , . - , . , -m-+-w --3. .%w._, | |||
. | |||
. | |||
. . . | |||
. | |||
2 | |||
2. Review of Plent Operations (71707) | |||
The plant continued in power operation (Mode 1) for the duration of this | |||
inspection period. | |||
a. Shift Logs and Facility Records (71707) | |||
The inspector reviewed records and discussed various entries with | |||
operations personnel to verify compliance with the Technical | |||
Specifications (TS) and the licensee's administrative procedures. | |||
The following records were reviewed: | |||
Shift Supervisor's Log; Rea(tor Operator's iog; Equipment | |||
Out-0f-Service Log; Shift Relief Checklist; Auxiliary Building | |||
Operator's Log; Active Clearance Log; Daily Operating Surveillance | |||
Log; Work Request Log; Short Term Instructions (STI); and Selected | |||
Chemistry / Radiation Protection Logs. | |||
In addition to these record reviews, the inspector independently | |||
verified clearance order tagouts. | |||
No violations or deviations were identified. | |||
b. Facility Tours and Observations (71707) | |||
Throughout the inspection period, facility tours were conducted | |||
to observe operations and maintenance activities in progress. Some | |||
operations and maintenance activity observat'ons were conducted | |||
during backshif ts. Also, during this inspection period, licensee | |||
meetings were attended by the inspector to observe planning and | |||
management activities. | |||
The facility tours and observations encompassed the following areas: , | |||
security perimeter fence; control room; emergency diesel generator | |||
room; auxiliary building; intermediate building: battery rooms; and | |||
electrical switchgear rooms. | |||
suring these tours, the following observations were made: | |||
: (1) Morttoring Instrumentation - The following instrumentation | |||
and/or indications were observed to verify that indicated | |||
parameters were in accordance with the TS for the current | |||
operational mode: | |||
Equipment operating status; area atmospheric and liquid | |||
radiation monitors; electrical system lineup; reactor operating | |||
parameters; and auxiliary equipment operating parameters. | |||
No violations or deviations were identified. | |||
._ _ . . _ | |||
. | |||
. . | |||
. | |||
3 | |||
(2) Safety Systems Walkdown (71710) - The inspector conducted a | |||
walkdown of the Spent Fuel (SF) system to verify that the lineup | |||
was in accordance with license requirements for system | |||
operability and that the system drawing and procedure correctly | |||
reflect "as-built" plant coaditions. | |||
No violations or deviations were identified. | |||
(3) Shif t Staffing (71707) - The inspector verified that operating | |||
shift staffing was in accordance with TS requirements and that | |||
control room operations were being conducted in an orderly and | |||
professional manner. In addition, the inspector observed shif t | |||
turnovers on various occasions to verify the continuity of plant | |||
status, operational problems, and other pertinent plant | |||
information during these turnovers. | |||
No violations or deviations were identified. | |||
(4) Plant Housekeeping Conditions (71707) - Storage of material | |||
and components, and cleanliness conditions of various areas | |||
throughout the facility were observed to determine whether | |||
safety and/or fire hazards existed. | |||
No violations or deviations were identified. | |||
(5) Radiological Protection Program (71709) - Radiation protection | |||
control activities were observed to verify that these activities | |||
were in conformance with the facility policies and procedures, | |||
and in compliance with regulatory requirements. These observa- | |||
tions included: | |||
- | |||
Selected licensee conducted surveys; | |||
- | |||
Entry to and exit from contaminated areas, including | |||
step-off pad conditions and disposal of contaminated | |||
ciothing; | |||
- | |||
Area postings and controls; | |||
- | |||
Work activity within radiation, high radiation, and | |||
contaminated areas; | |||
- | |||
Radiation Control Area (RCA) exiting practices; and, | |||
- | |||
Proper wearing of personnel monitoring equipment, | |||
protective clothing, and respiratory equipment. | |||
Area postings were independently verified for accuracy by the | |||
inspector. The inspector also reviewed selected Radiation Work | |||
Permits (RWPs) to verify that the RWP was current and that the | |||
' | |||
controls were adequate. | |||
l | |||
l | |||
l | |||
, | |||
. | |||
. . | |||
. | |||
4 | |||
The implementation of the licensee's As Low As Reasonably | |||
Achievable (ALARA) program was reviewed to determine | |||
personnel involvement in the objectives and goals of the | |||
program. | |||
During a tour of the Auxiliary Building (AB) the inspector - | |||
noted a lot of trash and debris in a contamirated area in the | |||
"Green Room". This area is used to compact solid radioactive | |||
waste. A significant amount of air flow through this room was | |||
also noted, however no spread of contamination appeared to be | |||
occurring. During meetings with licensee management personnel, | |||
the potential spread of contamination from this situation was | |||
discussed. | |||
No violations or deviations were identified. | |||
(6) Security Control (71881) - In the course of the monthly | |||
activities, the in< : ctor included a review of the licensee's | |||
physical security program, lhe composition of the security | |||
organization was checked to insure that the minimum number of | |||
guards were available and that security activitiqs were | |||
conducted with proper supervision. The performance of various | |||
shif ts of the security force was observed in the conduct of | |||
daily activities to include: protected and vital area access | |||
controls; searching of personnel, packages, and vehicles; badge | |||
issuance and retrieval; escorting of visitors; patrols; and | |||
compensatory posts. In addition, the inspector observed the | |||
operational status of Closed Circuit Television (CCTV) monitors, | |||
the Intrusion Detection system in the central and secondary | |||
alarm stations, protected area lichting, prot < ;ed and vital | |||
area barrier integrity, and the :ecuri., or va . ' ' tion interface | |||
with operations and maintenance. ; | |||
No violations or deviations were identified. , | |||
, | |||
(7) Fire Protection (71707) - Fire protection activities, staffing | |||
and equipment were observed to verify that fire brigade staffing | |||
was appropriate and that fire alaemt, extinguishing equipment, | |||
actuating controls, fire fighting equipment, emergency | |||
equipment, and fire barriers were operable. | |||
No violations or deviations were identified. | |||
(8) Surveillance (61726) - | |||
Surveillance tests were observed to | |||
verify that approved procedures were being used; cualified | |||
personnel were conducting the tests; tests were at.eqLate to l | |||
verify equipment operability; calibrated equipment was utilized; | |||
and TS requirements were followed. | |||
. | |||
. . . | |||
. | |||
5 | |||
The following tests were observed and/or data reviewed: | |||
- | |||
SP-130, Engineered Safeguards Monthly Functional | |||
Tests; | |||
- | |||
SP-300, Operating Daily Surveillance Log; | |||
- | |||
SP-317, RC System Water Inventory Balance; | |||
- | |||
SP-323, Evacuation and Fire Alarm Demonstration; | |||
and, | |||
- | |||
SP-340B, "B" Train ECCS Pump and Valve Quarterly | |||
Operability Test. | |||
No violations or deviations were identified. | |||
(9) Maintenance Activities (62703) - | |||
The inspector observed | |||
maintenance activities to verify that correct equipment | |||
clearances were in effect; work requests and fire prevention | |||
work permits, as required, were issued and being folicwed; | |||
quality control personnel were available for inspection | |||
activities tr. required; and TS requirements were being followed. | |||
Maintenance was observed and work packages were reviewed | |||
for the following maintenance activities: | |||
- | |||
Inspection of the Nuclear Services and Decay Heat Seawater | |||
(RW) system for foreign material; | |||
- | |||
Testing of Emergency Feedwater Initiation and Control | |||
(EFIC) relays in accordance with procedure PM-167, EFIC | |||
Time Delay Relay Testing; | |||
- | |||
Troubleshooting and calibration of Reactor Coolant System | |||
Pressure Transmitter RC-3A-PI3; and | |||
- | |||
Testing and cleaning of the circuit breaker for the "C" | |||
Makeup and Purification Pump (MVP-lC) in accordance with | |||
procedure PM-101, 4.16 KV and 6.9 KV Switchgear. | |||
No violations or deviations were identified. | |||
(10) 9adioactive Waste , Controls (71707) - Selected liquid releases | |||
were observed to verify that approved procedures were utilized, | |||
that appropriate release approvals were obtained, and that | |||
required surveys were taken. | |||
No violations or deviations were identified. | |||
. '. | |||
' | |||
. | |||
6 | |||
(11) Pipe Hangers and Seismic Restraints (71707) - Several pipe | |||
hangers and seismic restraints (snubbers) on safety-related | |||
systems were observed to assure fluid levels were adequate | |||
and no leakage was evide:1t, restraint settings were appropriate, | |||
and anchoring points were not binding. | |||
No violations or deviations were identified. | |||
3. Review of Licensee Event Reports (92700) and Nonconforming Operations | |||
Reports (71707) | |||
a. Licensee Event Reports (LERs) were reviewed for potential generic | |||
impact, to detect trends, and to determine whether corrective actions | |||
appeared appropriate. Events that were reported immediately were , | |||
reviewed as they occurred to determine if the TC were satisfied. | |||
LERs 88-12 and 88-15 were reviewed in accordance with the current NRC | |||
Enforcement Policy. | |||
(1) (Closed) LER 88-12: This LER reported the inadequate electrical | |||
isolation between reactor coolant syLtem hot leg temperature | |||
instruments. This LER was previously dircussed in NRC | |||
Inspection Report 50-302/88-16. The licensee's review of other | |||
modifications that interface with the remote shutdown panel has | |||
been completed and no similar problems were identified. The | |||
licensee concluded that the design error which caused this | |||
situation was an isolated case. | |||
(2) (Cpen) LER 38-15: This LER reported that components tssociated | |||
with the main feedwater startup block valves were not | |||
environmentally qualified. This matter is discussed in more | |||
detail in NRC Inspection Report 50-302/88-27. The licensee is | |||
developing a schedule to replace all nonqualified components | |||
associated with these valves and will submit this information in | |||
a supplement to the LER by January 31, 1989. This LER will | |||
remain open pending issuance of the supplement and completion of | |||
the licensee's corrective action, | |||
b. The inspector reviewed Nonconforming Operations Reports (NCORs) to | |||
verify the following: TS are complied with, corrective actions as | |||
identified in the reports or during subsequent reviews have baen | |||
accmlished or are being pursued for completion, generic items are | |||
identified and reported as required by 10 CFR Part 21, and items are | |||
reported as required by TS. | |||
All NCORs were reviewed in accordance with the current NRC | |||
Enforcement Policy. | |||
; | |||
, | |||
, | |||
._.. . . _. . .. _ _ | |||
. | |||
. | |||
. . | |||
, | |||
7 l | |||
, | |||
. | |||
(1) NCOR 88-90 reported that surveillance procedure SP-430, ; | |||
Containment' Air Locks Seal Leakage Test, was . inadequate to | |||
, | |||
implement the requirements of TS 4.6.1.3. This TS requires that | |||
the containment air lock shall be demonstrated operable after | |||
each opening by pressurizing the door seals and verifying that | |||
seal leakage is within limits. The TS further requires that | |||
this test pressure be stabilized for at least 15 minutes prior | |||
to verifying the leakage rate. The licensee discovered that l | |||
from April 21, 1988 to May 28, 1988, an air lock was opened on | |||
approximately 15 different occasions and the leakage test was | |||
j performed without the required 15 minute stabilization. time. | |||
10 CFR 50.73 (a)(2)(1)(B) requires that a LER be submitted , | |||
within 30 days of the event for any operation or condition : | |||
prohibited by the TS. Although this matter was identified by ' | |||
, | |||
the licensee on July 12, 1988, this matter was not repor*ed to | |||
the NRC within 30. days as required by 10 CFR 50.73 ar.d is | |||
considered to be a violation. | |||
i | |||
Violation (302/88-26-01): Failure to report a condition - | |||
prohibited by the TS as required by 10 CFR 50.73. | |||
' | |||
! | |||
(2) NCOR 88-93 reported that the impeller nut for the "B" Nuclear | |||
Services Closed Cycle Cooling Pump (SWp-18) was found loose | |||
< | |||
during recent pump maintenance. Although this condition did not | |||
cause the pump's impeller to become loose and thereby render the | |||
pump inoperable, the potential existed to do so. The licensee | |||
has noticed this same condition on the impeller nuts for pump | |||
SWP-1A and also the "A" Decay Heat Closed Cycle Cooling Pump i | |||
(DCP-1A). The licensee has replaced these impeller nuts with | |||
new nuts and has applied a thread securing compound to secure ; | |||
i the nut in place. The licensee plans to inspect other similar | |||
! | |||
safety related pumps, and make appropriate repairs if necessary, . | |||
I and is reviewing this matter to determine if 10 CFR Part 21 is | |||
: applicable. | |||
I | |||
IFI (302/88-26-02): Follow licensee's activities to inspect i | |||
safety related pumps for loose impeller nuts and determination l | |||
of 10 CFR Part 21 reportability. } | |||
i | |||
$ (3) NCOR 88-100 reported that periodic in'pections of some quality i | |||
; storage items were not being performea as required by Regulatory : | |||
, | |||
Guide 1.38. The licensee identified that ome items being i | |||
- | |||
stored in "staging" areas were not inspected. The licensee uses ( | |||
these staging areas to assemble parts and equipment necessary l | |||
. for the performance of plant work and modifications. The | |||
' | |||
! licensee has taken interim action to remove the items from the | |||
4 | |||
staging areas and is inspecting these items prior to returning | |||
i them to the appropriate storage area. The licensee is also | |||
i | |||
evaluating new methods for performing these inspections in the | |||
: future. This item is considered unresolved pending NRC review l | |||
l | |||
1 | |||
- | |||
! | |||
a : | |||
_ _ _ . -_ _ _ _ , _ _ _ . _ _ _ _ _ . -_ _ _ _ _ _ _ , . _ _ _ . _ . _ - . _ _ _ _ _ - - _ _ . .~___ | |||
. . _ . . ~ , . ._ _ - _ - ____ | |||
' | |||
' | |||
. | |||
. | |||
e | |||
' | |||
i | |||
t | |||
8 | |||
; | |||
of the inspection results for. items stored in the scaging areas | |||
and development of new methods for performing the inspections. | |||
t | |||
Unresolved Item (302/88-26-03): Review. inspection results of | |||
qmlity items stored in staging areas and development 'of new | |||
methods for performing periodic inspections. | |||
(4) NCORs 88-101, 88-104, and 88-105 reported that battery charger | |||
output shunt devices .were not being calibrated. The voltage | |||
across these shunts was used in previous surveillance tests to | |||
4 measure charger output current as required by the TS. ; | |||
' | |||
Subsequent calibration of' these devices by the licensee | |||
determined that they were out of tolerance in the conservative | |||
direction and the battery chargers were capable of supplying the | |||
i required current. The applicable surveillance procedure has | |||
; been revised to require the use of a portable battery load test | |||
device which has an installed calibrated shunt to measure | |||
charger output curreat, and this procedure has been performed | |||
i satisfactory on both battery banks. New shunts are presently | |||
, being ordered and will be installed in the battery chargers. | |||
The licensee also plans to include the battery charger shunts in | |||
4 | |||
' | |||
the PM-200 calibration program. This matter is considered to be | |||
a licensee identified violation in which appropriate corrective , | |||
' | |||
action was taken to prevent recurrence. The licensee's | |||
corrective action will be followed by an IFI. | |||
: IFI (302/88-26-04): Review the licensee's activities to install | |||
, new shunt devices in the battery chargers and include these - | |||
devices in the PM-200 calibration program. | |||
' | |||
(5) NCOR 88-108 reported that modification reviews failed to provide l | |||
, | |||
' | |||
adequate guidance for High Energy Line Break (HELB) ; | |||
considerations. One main steam line was walked down to assess * | |||
' | |||
the HELB qualification of equipment installed subsequent to ; | |||
, original construction. The licensee's analysis stated in ! | |||
conclusion that the potential targets affected by breaks in the | |||
' | |||
! | |||
one main steam line are not configured such that the operability | |||
. of any system to mitigate a steam line break is affected. | |||
! The licensee has a plan for completion of analy is of the other l | |||
i HELR areas. The resident inspectors will follow the licensee's i | |||
; progress. , | |||
2 : | |||
4. Design, Design Changes and Modifications (37700) { | |||
Installation of new or modified systems were reviewed to verify that the | |||
a | |||
changes were ovaluated and approved in accordance with 10 CFR 50.59, that j | |||
] the changes were performed in accordance with technically adequate and ; | |||
? | |||
3 | |||
i | |||
I , | |||
l i | |||
a | |||
. | |||
. | |||
- | |||
----~e-m- s- m--g- - , , - ,y n-- -- | |||
,---v.-.-a., w, nn., 7-m -n,-, ----,-,,,,n,=--.,e oe .wg. m .w+-..-r-m,,w-,r--s.r e - --m--m, - - - -~ | |||
* | |||
. | |||
, | |||
. | |||
9 | |||
approved procedures, that subsequent testing and test results met | |||
acceptance criteria or deviations were resolved in an acceptable manner, | |||
and that appropriate drawings and facility procedures were revised as | |||
necessary. This review included selected observations of modifications | |||
and/or testing in progress. | |||
The following modification approval records (MARS) were reviewed and/or | |||
associated testing observed: | |||
- | |||
MAR 88-01-21-0) , Install Backflow Preventer in Auxiliary Building | |||
Demineralized Water Line; and | |||
- | |||
MAR 87-07-23-01, Replacement of Toxic Gas Monitors. | |||
5. Licensee Action on Previously Identified Inspection Findings (92702 & | |||
92701) | |||
a. (Closed) IFI 302/88-14-05: Review the revision and revalidation of | |||
procedure PM-123, Periodic Electrical Checks of Emergency Diesel | |||
Generators. | |||
The licensee has revised procedure PM-123 (revision 8 dated July 19, | |||
1083) to correct the identified problems. A field validation was | |||
again performed to ensure the procedure could be performed as | |||
written. | |||
b. (Closed) Unresolved ! tem 302/88-06-01: Review the licensee's | |||
detailed evaluation of the effect of uncilibrated instrumentation. | |||
The licensee has completed their detailed evaluation of | |||
instrumentation which was overdue for calibration. The licensee did | |||
not identify any unresolved safety concerns and the function of | |||
safety systems was not adversely affected. | |||
c. (Closed) IFI 302/83 14-H: Review the licensee's revision to | |||
procedure SP-340A, "A" Train ECCS Pump and Valve Quarterly | |||
Oogrability Test. | |||
The licensee has revised procedure SP-340f, (eevision 11 dated July | |||
20, 1988) to reflect the correct stroke time for valve MOV-69 and has | |||
also clarified which locations pump vibration measurements are to be | |||
obtained. 1 | |||
d. (0 pen) IFI 302/88-18-03: Review the licensee's revisions to the TS | |||
and applicable surveillance procedures to reflect the increased | |||
containtrent leakage test pressure (Pa). | |||
In the process of verifying the maximum Reactor Builoing (RB) | |||
pressure following a Loss of Coolant Accident (LOCA), the licensee i | |||
discovered that the maximum temperature assumed to exist in the RB ' | |||
i | |||
l | |||
; | |||
g +. | |||
- | |||
- - | |||
* | |||
g . | |||
.,. | |||
b | |||
10 | |||
before the accident occurs was 110 degrees Fahrenheit (F) instead_of | |||
the maximum 130 F RB temperature that is allowed by the TS. The ' | |||
average RB temperature is routinely as high as 124 F. Subsequent | |||
reanalysis of the maximum RB pressure possible following a LOCA with : | |||
the 130 F initial RB temperature produced a slightly higher traximum . | |||
accident pressure of 53.3 psig (0.7 psig increase). This pressure is [ | |||
still below the RB design pressure of 55 psig. The licensee plans to - | |||
revise the TS and applicable surveillance procedures to reflect a Pa , | |||
, | |||
of 53.3 psig. | |||
e. (Closed) IFI 302/87-16-02: Review the licensee's activities to | |||
; determine the cause for component contamination and review of IE | |||
Circular 77-14. | |||
As discussed in NRC Inspection Report 50-302/88-11, this item , | |||
i remained open pending the installation of a backflow preventer in the | |||
demineralized water supply line to the AB and the establishment of | |||
~ | |||
3 administrative controls for valve 00V-128. The licensee has i | |||
3 | |||
' | |||
completed modification MAR 88-01-21-01, Install Backflow Preventer.in : | |||
AB DW Line, and has revised procedure OP-416, Domestic Water Supply , | |||
t | |||
Syster.i (revision 23 dated July 15, 1988), to require that valve | |||
00V-129 be maintained locked closed. | |||
I f. (Closed) IFI 87-40-06: Review the licensee's investigation regarding ; | |||
, | |||
the size and location of control transformers for valves MUV-23 and | |||
; MUV-25. | |||
i | |||
The licensee reviewed modification and work socumentation associated | |||
with these valves and was unable to determine the cause for the | |||
' | |||
oversized transformers. The licensee has determined that these | |||
! transformers are more than sufficient for the design application and | |||
' | |||
has revised applicable plant drawings to correctly reflect what is | |||
installed in the field. | |||
! i | |||
6. Exit Interview (30703) ! | |||
; | |||
1 The inspector met with licensee representatives (cer.oted in paragraph 1) ! | |||
3 at the conclusion of the inspection on September 16, 1988. During this i | |||
' | |||
; meeting, the inspector summarized the scope and findings of the inspection ! | |||
as they a*e detailed in this report with particular emphasis on the : | |||
. violation, unresolved item and inspector followup items. ; | |||
i | |||
- | |||
The licensee representatives acknowledged the inspector's comments and did < | |||
not identify as proprietary any of the materials provided to or reviewed ( | |||
) by the inspectors during this inspection. ; | |||
- | |||
, | |||
l | |||
1 ; | |||
4 | |||
1 | |||
k , | |||
:l < | |||
i | |||
j | |||
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ | |||
. | |||
, | |||
. | |||
1 | |||
11 | |||
Item Number Description and Reference | |||
50-302/88-26-01 Violation - Failure to report a condition | |||
prohibited by the TS as required by 10 CFR 50.73. | |||
50-302/88-26-02 IFI - Follow licensee's activities to inspect | |||
safety related pumps for loose impeller nuts and | |||
determination of 10 CFR Part 21 reportability. | |||
50-302/88-26-03 UNR - Review inspection results of quali ty items | |||
stored in staging areas and aevelopme..; of new | |||
.?athods for performing periodic inspections. | |||
50-302/88-26-04 IFI - Review tne licensee's activities to install | |||
new shunt devices in the battery chargers and | |||
include these devices in the PM-200 calibration | |||
program. | |||
7. Acronyms and Abbreviations | |||
AB - Auxiliary Building | |||
ALARA - As low As Reasonably Achievable | |||
CCTV - Closed Circuit Television | |||
CFR - Code of Federal Regulations | |||
ECCS - Emergency Core Cooling System (s) | |||
EFIC - Emergency Feedwater Initiation and Control | |||
F - Fahrenheit | |||
HELB - High Energy Line Breaks | |||
IFI - Inspector Followup Item | |||
LER - Licensee Event Report | |||
LOCA - Loss of Coolant Accident | |||
MAR - Modification Approval Record | |||
NCOR - Nonconforming Operation Report t | |||
NRC - Nuclear Regulatory Commission | |||
RB - Reactor Building ! | |||
RCA - Radiation Control Area | |||
RC - Reactor Coolant | |||
RW - Nuclear Services and Decay Heat Seawater System i | |||
- Raciation Work Permit | |||
' | |||
RWP | |||
SF - Spent Fuel | |||
SP - Surveillance Procedure | |||
STI - Short Term Instruction | |||
TS - Technical Specification | |||
UNR - Unresolved Item | |||
: | |||
1 | |||
- - _ ______ __ _ _ _ ___ . | |||
}} |
Latest revision as of 11:14, 30 December 2020
ML20204J804 | |
Person / Time | |
---|---|
Site: | Crystal River |
Issue date: | 10/04/1988 |
From: | Crlenjak R, Holmesray P, Tedrow J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
To: | |
Shared Package | |
ML20204J755 | List: |
References | |
50-302-88-26, NUDOCS 8810250257 | |
Download: ML20204J804 (13) | |
See also: IR 05000302/1988026
Text
-
.
- i csen
. $ o
y* 't UNITED STATES
g .j e
NUCLEAR REGULATORY COMMISSION
o REGION 11
\ ,,,,
e
101 MARIETTA ST., N.W.
ATLANTA. GEORGIA 30323
Report No: 50-302/88-26
Licensee: orida Power Corporation
3201 34th Street, South
St. Petersburg, FL 33733
Occket No: 50-302 License No.: DPR-72
Factitty Name: Crystal River 3
Inspection Conducted: August 13 - September 16, 1988
Inspectors: W. $ 4 Jet /0 /[88
Date Signed
P.Aolmes-Ray,SengrRe.identInspector
knvdas u, to M rs
J. Tedro , esidet{ Inspector Da~te' Signed
Approved by:_
R.
./ e , M
TeAjak, Secj#6fi' Chief V
8
/ gate:Gigned
D' ision of Reaftor Projects
SUMMARY
Scope: This routine inspection was conducted by two resident inspectors in
the areas of plant operations, security, radiological controls,
Licensee Event Reports and Nonconforming Operations Reports, facility
modifications, and licensee action on previous inspection items.
Numerous facility tours were conducted and facility operations
observed. Some of these tours and observations were conducted on
backshifts.
'
'
Rasults: Ona violation and one * unresolved item were identified: Failure to
report a condition prohibited by the technical specifications,
paragraph 3.b(1); Inspection of quality items stored in staging
areas, paragraph 3.b(3).
- Unresolved items are a matter about which more information is required to ;
determine whether they are acceptable or may involve violttio9s or deviations. ,
i
i
!
G810150257 882oo5
-
DR
ADOCK 05000302
. PDC
_ _ _ _ _ _ _ - _ _ _ _ - _ - - _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _
.
- a o
,
f s rec ,*q
- ' 4 UNITED STATES
j.
o
j
e
NUCLEAR REGULATORY COMMISSION
REGION 11
-
- ,[ 101 MARIETTA ST N.W.
ATLANTA GEORGIA 30323
e,,,,
Report No: 50-302/88-26
Licensee: Florida Power Corporation
3201 34th Street, South
St. Petersburg, FL 33733
Docket No: 50-302 License No.: OPR-72
Facility Name: Crystal River 3
Inspection Conducted: August 13 - September 16, 1988
Inspectprs: W. 5 /m /0[V[88_
D. fiolmes~-Ray, SengY Resident inspector Dafe $1gnecf-
% &<b
J. Tedro , eside
r
nspector
'o M r?
Da'te' Signed
Approved by:
R.
m e ,
rte /Jak, Sec Chief V
) M_
/ffate/ Signed
O' ision of Rea tor Projects
SUMMARY
Scope: This routine inspection was conducted by two resident inspectors in
the areas of plant operations, security, radiological controls,
Licensee Event Reports and Nonconforming Operations Reports, facility
modifications, and licensee action on previous inspection items.
Numerous facility tours were conducted and facility operations
observed. Some of these tours and observations were conducted on
backshifts. l
l
Results: One violation and one * unresolved item were identified: Failure to j
ieport a condition prohibited by the technical specifications,
paragraph 3 b(1); Inspection of quality items stored in staging
areas, paragraph 3.b(3).
- Unresolved items are a matter about which more information is required to
determina whether they are acceptable or may involve violations or deviations.
,
i
.
- . _
. . - .
. . .
.
l
,
REPORT DETAILS
'
3. Persons Contacted
Licensee Employees
J. Alberdi, Manager, Nuclear Plant Technical Support
- F. Bailey, Superintendent, Nuclear Projects
'
r
4
- P. Bassa, Nuclear Security Specialist
- G. Becker, Manager, Site Nuclear Engineering Services
- R. Blume, Nuclear-Team Instructor
- J. Brandely, Manager, Nuclear Integrated Planning
,
- J. Bufe'-Carr, Nuclear Regulatory Specialist
. *M. Collins, Superintendent, Nuclear Safety and Reliability
"J. Cooper, Superintendent,-Technical Support
B. Hickle, Manager, Nuclear Plant Operations
- M. Jones, Nuclear Modifications Specialist
1
'
H. Liles, Nuclear Operations Technical Advisor ;
- S. Mansfield, Nuclear Team Instructor
P. McKee, Director, Nuclear Plant Operations
- L. Moffatt, Nuclear Safety Supervisor (
'
R. Murgatroyd, Superintendent, Nuclear Maintenance ;
- T. Neaman, Nuclear Security Specialist f'
i "J. Roberts, Manager, Nuclear Chemistry
4
5. Robinson, Superintendent, Nuclear Chemistry and Radiation "
l Protection
j V. Roppel, Manager, Nuclear Operations Mairtenance and CJtages
<
- W. Rossfeld, Manager, Nuclear Compliance
L. Sexton, Senior Nuclear Mechanical Engineer
-
- L. Snow, Occuments Clerk I
R. Watts, Manager, Nuclear Operations Purchasing and Contracting
- R. Widell, Director, Nuclear Operations Site Support
- M. Williams, Nuclear Regul't:*, Specialist i
Other licensee employees contacted included office, operations,
J
engineering, maintenance, chemistry / radiation and corporate personnel, j
Pinkerton Corporation !
,
- F. Harman, Project Manager
.
"Attended exit interview
.
Acronyms and initialisms used throughout this report are listed in the ;
j last paragraph. !
j
!
<
l !
J
'
!
I
4
,, -y.y-,. -, , -.----,,.,--------,-v-- - ----
.-e-w -- -w, c-----rn*--r- . - - , , . - , . , -m-+-w --3. .%w._,
.
.
. . .
.
2
2. Review of Plent Operations (71707)
The plant continued in power operation (Mode 1) for the duration of this
inspection period.
a. Shift Logs and Facility Records (71707)
The inspector reviewed records and discussed various entries with
operations personnel to verify compliance with the Technical
Specifications (TS) and the licensee's administrative procedures.
The following records were reviewed:
Shift Supervisor's Log; Rea(tor Operator's iog; Equipment
Out-0f-Service Log; Shift Relief Checklist; Auxiliary Building
Operator's Log; Active Clearance Log; Daily Operating Surveillance
Log; Work Request Log; Short Term Instructions (STI); and Selected
Chemistry / Radiation Protection Logs.
In addition to these record reviews, the inspector independently
verified clearance order tagouts.
No violations or deviations were identified.
b. Facility Tours and Observations (71707)
Throughout the inspection period, facility tours were conducted
to observe operations and maintenance activities in progress. Some
operations and maintenance activity observat'ons were conducted
during backshif ts. Also, during this inspection period, licensee
meetings were attended by the inspector to observe planning and
management activities.
The facility tours and observations encompassed the following areas: ,
security perimeter fence; control room; emergency diesel generator
room; auxiliary building; intermediate building: battery rooms; and
electrical switchgear rooms.
suring these tours, the following observations were made:
- (1) Morttoring Instrumentation - The following instrumentation
and/or indications were observed to verify that indicated
parameters were in accordance with the TS for the current
operational mode:
Equipment operating status; area atmospheric and liquid
radiation monitors; electrical system lineup; reactor operating
parameters; and auxiliary equipment operating parameters.
No violations or deviations were identified.
._ _ . . _
.
. .
.
3
(2) Safety Systems Walkdown (71710) - The inspector conducted a
walkdown of the Spent Fuel (SF) system to verify that the lineup
was in accordance with license requirements for system
operability and that the system drawing and procedure correctly
reflect "as-built" plant coaditions.
No violations or deviations were identified.
(3) Shif t Staffing (71707) - The inspector verified that operating
shift staffing was in accordance with TS requirements and that
control room operations were being conducted in an orderly and
professional manner. In addition, the inspector observed shif t
turnovers on various occasions to verify the continuity of plant
status, operational problems, and other pertinent plant
information during these turnovers.
No violations or deviations were identified.
(4) Plant Housekeeping Conditions (71707) - Storage of material
and components, and cleanliness conditions of various areas
throughout the facility were observed to determine whether
safety and/or fire hazards existed.
No violations or deviations were identified.
(5) Radiological Protection Program (71709) - Radiation protection
control activities were observed to verify that these activities
were in conformance with the facility policies and procedures,
and in compliance with regulatory requirements. These observa-
tions included:
-
Selected licensee conducted surveys;
-
Entry to and exit from contaminated areas, including
step-off pad conditions and disposal of contaminated
ciothing;
-
Area postings and controls;
-
Work activity within radiation, high radiation, and
contaminated areas;
-
Radiation Control Area (RCA) exiting practices; and,
-
Proper wearing of personnel monitoring equipment,
protective clothing, and respiratory equipment.
Area postings were independently verified for accuracy by the
inspector. The inspector also reviewed selected Radiation Work
Permits (RWPs) to verify that the RWP was current and that the
'
controls were adequate.
l
l
l
,
.
. .
.
4
The implementation of the licensee's As Low As Reasonably
Achievable (ALARA) program was reviewed to determine
personnel involvement in the objectives and goals of the
program.
During a tour of the Auxiliary Building (AB) the inspector -
noted a lot of trash and debris in a contamirated area in the
"Green Room". This area is used to compact solid radioactive
waste. A significant amount of air flow through this room was
also noted, however no spread of contamination appeared to be
occurring. During meetings with licensee management personnel,
the potential spread of contamination from this situation was
discussed.
No violations or deviations were identified.
(6) Security Control (71881) - In the course of the monthly
activities, the in< : ctor included a review of the licensee's
physical security program, lhe composition of the security
organization was checked to insure that the minimum number of
guards were available and that security activitiqs were
conducted with proper supervision. The performance of various
shif ts of the security force was observed in the conduct of
daily activities to include: protected and vital area access
controls; searching of personnel, packages, and vehicles; badge
issuance and retrieval; escorting of visitors; patrols; and
compensatory posts. In addition, the inspector observed the
operational status of Closed Circuit Television (CCTV) monitors,
the Intrusion Detection system in the central and secondary
alarm stations, protected area lichting, prot < ;ed and vital
area barrier integrity, and the :ecuri., or va . ' ' tion interface
with operations and maintenance. ;
No violations or deviations were identified. ,
,
(7) Fire Protection (71707) - Fire protection activities, staffing
and equipment were observed to verify that fire brigade staffing
was appropriate and that fire alaemt, extinguishing equipment,
actuating controls, fire fighting equipment, emergency
equipment, and fire barriers were operable.
No violations or deviations were identified.
(8) Surveillance (61726) -
Surveillance tests were observed to
verify that approved procedures were being used; cualified
personnel were conducting the tests; tests were at.eqLate to l
verify equipment operability; calibrated equipment was utilized;
and TS requirements were followed.
.
. . .
.
5
The following tests were observed and/or data reviewed:
-
SP-130, Engineered Safeguards Monthly Functional
Tests;
-
SP-300, Operating Daily Surveillance Log;
-
SP-317, RC System Water Inventory Balance;
-
SP-323, Evacuation and Fire Alarm Demonstration;
and,
-
SP-340B, "B" Train ECCS Pump and Valve Quarterly
Operability Test.
No violations or deviations were identified.
(9) Maintenance Activities (62703) -
The inspector observed
maintenance activities to verify that correct equipment
clearances were in effect; work requests and fire prevention
work permits, as required, were issued and being folicwed;
quality control personnel were available for inspection
activities tr. required; and TS requirements were being followed.
Maintenance was observed and work packages were reviewed
for the following maintenance activities:
-
Inspection of the Nuclear Services and Decay Heat Seawater
(RW) system for foreign material;
-
Testing of Emergency Feedwater Initiation and Control
(EFIC) relays in accordance with procedure PM-167, EFIC
Time Delay Relay Testing;
-
Troubleshooting and calibration of Reactor Coolant System
Pressure Transmitter RC-3A-PI3; and
-
Testing and cleaning of the circuit breaker for the "C"
Makeup and Purification Pump (MVP-lC) in accordance with
procedure PM-101, 4.16 KV and 6.9 KV Switchgear.
No violations or deviations were identified.
(10) 9adioactive Waste , Controls (71707) - Selected liquid releases
were observed to verify that approved procedures were utilized,
that appropriate release approvals were obtained, and that
required surveys were taken.
No violations or deviations were identified.
. '.
'
.
6
(11) Pipe Hangers and Seismic Restraints (71707) - Several pipe
hangers and seismic restraints (snubbers) on safety-related
systems were observed to assure fluid levels were adequate
and no leakage was evide:1t, restraint settings were appropriate,
and anchoring points were not binding.
No violations or deviations were identified.
3. Review of Licensee Event Reports (92700) and Nonconforming Operations
Reports (71707)
a. Licensee Event Reports (LERs) were reviewed for potential generic
impact, to detect trends, and to determine whether corrective actions
appeared appropriate. Events that were reported immediately were ,
reviewed as they occurred to determine if the TC were satisfied.
LERs 88-12 and 88-15 were reviewed in accordance with the current NRC
(1) (Closed) LER 88-12: This LER reported the inadequate electrical
isolation between reactor coolant syLtem hot leg temperature
instruments. This LER was previously dircussed in NRC
Inspection Report 50-302/88-16. The licensee's review of other
modifications that interface with the remote shutdown panel has
been completed and no similar problems were identified. The
licensee concluded that the design error which caused this
situation was an isolated case.
(2) (Cpen) LER 38-15: This LER reported that components tssociated
with the main feedwater startup block valves were not
environmentally qualified. This matter is discussed in more
detail in NRC Inspection Report 50-302/88-27. The licensee is
developing a schedule to replace all nonqualified components
associated with these valves and will submit this information in
a supplement to the LER by January 31, 1989. This LER will
remain open pending issuance of the supplement and completion of
the licensee's corrective action,
b. The inspector reviewed Nonconforming Operations Reports (NCORs) to
verify the following: TS are complied with, corrective actions as
identified in the reports or during subsequent reviews have baen
accmlished or are being pursued for completion, generic items are
identified and reported as required by 10 CFR Part 21, and items are
reported as required by TS.
All NCORs were reviewed in accordance with the current NRC
,
,
._.. . . _. . .. _ _
.
.
. .
,
7 l
,
.
(1) NCOR 88-90 reported that surveillance procedure SP-430, ;
Containment' Air Locks Seal Leakage Test, was . inadequate to
,
implement the requirements of TS 4.6.1.3. This TS requires that
the containment air lock shall be demonstrated operable after
each opening by pressurizing the door seals and verifying that
seal leakage is within limits. The TS further requires that
this test pressure be stabilized for at least 15 minutes prior
to verifying the leakage rate. The licensee discovered that l
from April 21, 1988 to May 28, 1988, an air lock was opened on
approximately 15 different occasions and the leakage test was
j performed without the required 15 minute stabilization. time.
10 CFR 50.73 (a)(2)(1)(B) requires that a LER be submitted ,
within 30 days of the event for any operation or condition :
prohibited by the TS. Although this matter was identified by '
,
the licensee on July 12, 1988, this matter was not repor*ed to
the NRC within 30. days as required by 10 CFR 50.73 ar.d is
considered to be a violation.
i
Violation (302/88-26-01): Failure to report a condition -
prohibited by the TS as required by 10 CFR 50.73.
'
!
(2) NCOR 88-93 reported that the impeller nut for the "B" Nuclear
Services Closed Cycle Cooling Pump (SWp-18) was found loose
<
during recent pump maintenance. Although this condition did not
cause the pump's impeller to become loose and thereby render the
pump inoperable, the potential existed to do so. The licensee
has noticed this same condition on the impeller nuts for pump
SWP-1A and also the "A" Decay Heat Closed Cycle Cooling Pump i
(DCP-1A). The licensee has replaced these impeller nuts with
new nuts and has applied a thread securing compound to secure ;
i the nut in place. The licensee plans to inspect other similar
!
safety related pumps, and make appropriate repairs if necessary, .
I and is reviewing this matter to determine if 10 CFR Part 21 is
- applicable.
I
IFI (302/88-26-02): Follow licensee's activities to inspect i
safety related pumps for loose impeller nuts and determination l
of 10 CFR Part 21 reportability. }
i
$ (3) NCOR 88-100 reported that periodic in'pections of some quality i
- storage items were not being performea as required by Regulatory
,
Guide 1.38. The licensee identified that ome items being i
-
stored in "staging" areas were not inspected. The licensee uses (
these staging areas to assemble parts and equipment necessary l
. for the performance of plant work and modifications. The
'
! licensee has taken interim action to remove the items from the
4
staging areas and is inspecting these items prior to returning
i them to the appropriate storage area. The licensee is also
i
evaluating new methods for performing these inspections in the
- future. This item is considered unresolved pending NRC review l
l
1
-
!
a :
_ _ _ . -_ _ _ _ , _ _ _ . _ _ _ _ _ . -_ _ _ _ _ _ _ , . _ _ _ . _ . _ - . _ _ _ _ _ - - _ _ . .~___
. . _ . . ~ , . ._ _ - _ - ____
'
'
.
.
e
'
i
t
8
of the inspection results for. items stored in the scaging areas
and development of new methods for performing the inspections.
t
Unresolved Item (302/88-26-03): Review. inspection results of
qmlity items stored in staging areas and development 'of new
methods for performing periodic inspections.
(4) NCORs88-101, 88-104, and 88-105 reported that battery charger
output shunt devices .were not being calibrated. The voltage
across these shunts was used in previous surveillance tests to
4 measure charger output current as required by the TS. ;
'
Subsequent calibration of' these devices by the licensee
determined that they were out of tolerance in the conservative
direction and the battery chargers were capable of supplying the
i required current. The applicable surveillance procedure has
- been revised to require the use of a portable battery load test
device which has an installed calibrated shunt to measure
charger output curreat, and this procedure has been performed
i satisfactory on both battery banks. New shunts are presently
, being ordered and will be installed in the battery chargers.
The licensee also plans to include the battery charger shunts in
4
'
the PM-200 calibration program. This matter is considered to be
a licensee identified violation in which appropriate corrective ,
'
action was taken to prevent recurrence. The licensee's
corrective action will be followed by an IFI.
- IFI (302/88-26-04): Review the licensee's activities to install
, new shunt devices in the battery chargers and include these -
devices in the PM-200 calibration program.
'
(5) NCOR 88-108 reported that modification reviews failed to provide l
,
'
adequate guidance for High Energy Line Break (HELB) ;
considerations. One main steam line was walked down to assess *
'
the HELB qualification of equipment installed subsequent to ;
, original construction. The licensee's analysis stated in !
conclusion that the potential targets affected by breaks in the
'
!
one main steam line are not configured such that the operability
. of any system to mitigate a steam line break is affected.
! The licensee has a plan for completion of analy is of the other l
i HELR areas. The resident inspectors will follow the licensee's i
- progress. ,
2 :
4. Design, Design Changes and Modifications (37700) {
Installation of new or modified systems were reviewed to verify that the
a
changes were ovaluated and approved in accordance with 10 CFR 50.59, that j
] the changes were performed in accordance with technically adequate and ;
?
3
i
I ,
l i
a
.
.
-
~e-m- s- m--g- - , , - ,y n-- --
,---v.-.-a., w, nn., 7-m -n,-, ----,-,,,,n,=--.,e oe .wg. m .w+-..-r-m,,w-,r--s.r e - --m--m, - - - -~
.
,
.
9
approved procedures, that subsequent testing and test results met
acceptance criteria or deviations were resolved in an acceptable manner,
and that appropriate drawings and facility procedures were revised as
necessary. This review included selected observations of modifications
and/or testing in progress.
The following modification approval records (MARS) were reviewed and/or
associated testing observed:
-
MAR 88-01-21-0) , Install Backflow Preventer in Auxiliary Building
Demineralized Water Line; and
-
MAR 87-07-23-01, Replacement of Toxic Gas Monitors.
5. Licensee Action on Previously Identified Inspection Findings (92702 &
92701)
a. (Closed) IFI 302/88-14-05: Review the revision and revalidation of
procedure PM-123, Periodic Electrical Checks of Emergency Diesel
Generators.
The licensee has revised procedure PM-123 (revision 8 dated July 19,
1083) to correct the identified problems. A field validation was
again performed to ensure the procedure could be performed as
written.
b. (Closed) Unresolved ! tem 302/88-06-01: Review the licensee's
detailed evaluation of the effect of uncilibrated instrumentation.
The licensee has completed their detailed evaluation of
instrumentation which was overdue for calibration. The licensee did
not identify any unresolved safety concerns and the function of
safety systems was not adversely affected.
c. (Closed) IFI 302/83 14-H: Review the licensee's revision to
procedure SP-340A, "A" Train ECCS Pump and Valve Quarterly
Oogrability Test.
The licensee has revised procedure SP-340f, (eevision 11 dated July
20, 1988) to reflect the correct stroke time for valve MOV-69 and has
also clarified which locations pump vibration measurements are to be
obtained. 1
d. (0 pen) IFI 302/88-18-03: Review the licensee's revisions to the TS
and applicable surveillance procedures to reflect the increased
containtrent leakage test pressure (Pa).
In the process of verifying the maximum Reactor Builoing (RB)
pressure following a Loss of Coolant Accident (LOCA), the licensee i
discovered that the maximum temperature assumed to exist in the RB '
i
l
g +.
-
- -
g .
.,.
b
10
before the accident occurs was 110 degrees Fahrenheit (F) instead_of
the maximum 130 F RB temperature that is allowed by the TS. The '
average RB temperature is routinely as high as 124 F. Subsequent
reanalysis of the maximum RB pressure possible following a LOCA with :
the 130 F initial RB temperature produced a slightly higher traximum .
accident pressure of 53.3 psig (0.7 psig increase). This pressure is [
still below the RB design pressure of 55 psig. The licensee plans to -
revise the TS and applicable surveillance procedures to reflect a Pa ,
,
of 53.3 psig.
e. (Closed) IFI 302/87-16-02: Review the licensee's activities to
- determine the cause for component contamination and review of IE
Circular 77-14.
As discussed in NRC Inspection Report 50-302/88-11, this item ,
i remained open pending the installation of a backflow preventer in the
demineralized water supply line to the AB and the establishment of
~
3 administrative controls for valve 00V-128. The licensee has i
3
'
completed modification MAR 88-01-21-01, Install Backflow Preventer.in :
AB DW Line, and has revised procedure OP-416, Domestic Water Supply ,
t
Syster.i (revision 23 dated July 15, 1988), to require that valve
00V-129 be maintained locked closed.
I f. (Closed) IFI 87-40-06: Review the licensee's investigation regarding ;
,
the size and location of control transformers for valves MUV-23 and
- MUV-25.
i
The licensee reviewed modification and work socumentation associated
with these valves and was unable to determine the cause for the
'
oversized transformers. The licensee has determined that these
! transformers are more than sufficient for the design application and
'
has revised applicable plant drawings to correctly reflect what is
installed in the field.
! i
6. Exit Interview (30703) !
1 The inspector met with licensee representatives (cer.oted in paragraph 1) !
3 at the conclusion of the inspection on September 16, 1988. During this i
'
- meeting, the inspector summarized the scope and findings of the inspection !
as they a*e detailed in this report with particular emphasis on the :
. violation, unresolved item and inspector followup items. ;
i
-
The licensee representatives acknowledged the inspector's comments and did <
not identify as proprietary any of the materials provided to or reviewed (
) by the inspectors during this inspection. ;
-
,
l
1 ;
4
1
k ,
- l <
i
j
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _
.
,
.
1
11
Item Number Description and Reference
50-302/88-26-01 Violation - Failure to report a condition
prohibited by the TS as required by 10 CFR 50.73.
50-302/88-26-02 IFI - Follow licensee's activities to inspect
safety related pumps for loose impeller nuts and
determination of 10 CFR Part 21 reportability.
50-302/88-26-03 UNR - Review inspection results of quali ty items
stored in staging areas and aevelopme..; of new
.?athods for performing periodic inspections.
50-302/88-26-04 IFI - Review tne licensee's activities to install
new shunt devices in the battery chargers and
include these devices in the PM-200 calibration
program.
7. Acronyms and Abbreviations
AB - Auxiliary Building
ALARA - As low As Reasonably Achievable
CCTV - Closed Circuit Television
CFR - Code of Federal Regulations
ECCS - Emergency Core Cooling System (s)
EFIC - Emergency Feedwater Initiation and Control
F - Fahrenheit
HELB - High Energy Line Breaks
IFI - Inspector Followup Item
LER - Licensee Event Report
LOCA - Loss of Coolant Accident
MAR - Modification Approval Record
NCOR - Nonconforming Operation Report t
NRC - Nuclear Regulatory Commission
RB - Reactor Building !
RCA - Radiation Control Area
RC - Reactor Coolant
RW - Nuclear Services and Decay Heat Seawater System i
- Raciation Work Permit
'
SF - Spent Fuel
SP - Surveillance Procedure
STI - Short Term Instruction
TS - Technical Specification
UNR - Unresolved Item
1
- - _ ______ __ _ _ _ ___ .