ML19253B423: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
h
h im." Edison a-a-PILGP.lM NUCLEAR POWER STATION                  ,
.
RFD # 1 ROCKY lilLL ROAD PLYMOUTH, MASSACHUSETTS 023GO October 9, 1979 BECo Ltr.#79-196 Director, Region I Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406                        Docket Number 50-293 License DPR-35 Licensee Event Report 79-036/01T-0                                      .
im." Edison a-a-
                                                                                            .
PILGP.lM NUCLEAR POWER STATION                  ,
RFD # 1 ROCKY lilLL ROAD PLYMOUTH, MASSACHUSETTS 023GO October 9, 1979 BECo Ltr.#79-196
                                                                                                    .
Director, Region I Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406                        Docket Number 50-293 License DPR-35 Licensee Event Report 79-036/01T-0                                      .
Gentlemen:
Gentlemen:
The attached Licensee Event Report 79-036/01T-0, Pipe Supports, is hereby submitted in accordance with the requirements el Pilgrim Nuclear Power Station Technical Specification 6.9.B.1.h.            T'.e Operations Review Committee has reviewed this event and classified it as .in trror in the methods used for such analysis as described in the Safety Analysis Report.
The attached Licensee Event Report 79-036/01T-0, Pipe Supports, is hereby submitted in accordance with the requirements el Pilgrim Nuclear Power Station Technical Specification 6.9.B.1.h.            T'.e Operations Review Committee has reviewed this event and classified it as .in trror in the methods used for such analysis as described in the Safety Analysis Report.
If there are any questions on this subject, please contact us.
If there are any questions on this subject, please contact us.
                                                                                                .
Respectfully submitteC,
Respectfully submitteC,
                                                      -
                                                               $      d5    /) //
                                                               $      d5    /) //
P        . McGuire Station Manager Nuclear Operations GCW:ep
P        . McGuire Station Manager Nuclear Operations GCW:ep
Line 40: Line 32:
Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C. 20555 t
Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C. 20555 t
I
I
                                                                                 ,  e n        4      l
                                                                                 ,  e n        4      l i,s_  ij. 44 i
                                      .
l t910150 IT        .}}
i,s_  ij. 44 i
l
                                                                                                      ,
                          . -
t910150 IT        .}}

Latest revision as of 00:40, 2 February 2020

Forwards LER 79-036/01T-0
ML19253B423
Person / Time
Site: Pilgrim
Issue date: 10/09/1979
From: Mcguire P
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19253B424 List:
References
79-196, NUDOCS 7910150530
Download: ML19253B423 (1)


Text

-

h im." Edison a-a-PILGP.lM NUCLEAR POWER STATION ,

RFD # 1 ROCKY lilLL ROAD PLYMOUTH, MASSACHUSETTS 023GO October 9, 1979 BECo Ltr.#79-196 Director, Region I Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Docket Number 50-293 License DPR-35 Licensee Event Report 79-036/01T-0 .

Gentlemen:

The attached Licensee Event Report 79-036/01T-0, Pipe Supports, is hereby submitted in accordance with the requirements el Pilgrim Nuclear Power Station Technical Specification 6.9.B.1.h. T'.e Operations Review Committee has reviewed this event and classified it as .in trror in the methods used for such analysis as described in the Safety Analysis Report.

If there are any questions on this subject, please contact us.

Respectfully submitteC,

$ d5 /) //

P . McGuire Station Manager Nuclear Operations GCW:ep

Enclosures:

(3 copies)

LER 79-036/01T-0 cc: Director (40 copies)

Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C. 20555 t

I

, e n 4 l i,s_ ij. 44 i

l t910150 IT .