ML19253B424

From kanterella
Jump to navigation Jump to search
Forwards LER 79-036/01T-0
Date released: 09/24/2019 Download: ML19253B424


LER 79-036/01T-0:on 791001,discovered That Portion of SSW Loop Piping B Could Be Overstressed During Seismic Event. Caused by Design Error.Plant Design Change Request Initiated to Reduce Stress to Acceptable Limits
ML19253B426
Person / Time
Site: Pilgrim
Issue date: 10/09/1979
From: Whitney G
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19253B426 (1)
Forwards LER 79-036/01T-0
ML19253B423
Person / Time
Site: Pilgrim
Issue date: 10/09/1979
From: Mcguire P
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19253B423 (1)