{{#Wiki_filter:REGu(.q UNITED STATES ",....§'" .>-0.,.....
{{#Wiki_filter:~",R REGu(.q                                     UNITED STATES
NUCLEAR REGULATORY COMMISSION 0 WASHINGTON, D.C. 20555-0001  
  ",....§ '"             .>-0.,.....           NUCLEAR REGULATORY COMMISSION
<I: 0 \ii : June 3, 2011 "'" ***
~                              0                       WASHINGTON, D.C. 20555-0001
FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station  
<I:                             0
\ii                             :
~;i;                                                          June 3, 2011
    ~                      ~
      "'"
            ***....... ~o LICENSEE:          FirstEnergy Nuclear Operating Company FACILITY:          Davis-Besse Nuclear Power Station
 
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF SITE AUDIT RELATED TO THE REVIEW OF THE LICENSE RENEWAL APPLICATION FOR DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 (TAC NO. ME4613) From March 8-10, 2011, a review team consisting of staff from the U.S. Nuclear Regulatory Commission (NRC or the staff) and contractors from Argonne National Laboratories participated in a site audit at Davis-Besse Nuclear Power Station, Unit 1 (DBNPS) related to the environmental review of the DBNPS license renewal application.
OF SITE AUDIT RELATED TO THE REVIEW OF THE LICENSE RENEWAL APPLICATION FOR DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 (TAC NO. ME4613)
The primary goal of the site visit was to review documentation, gather information to ensure that the environmental requirements of license renewal as codified in Title 10 of the Code of Federal Regulations Part 51 (10 CFR Part 51) were met, and to interface with officials in Federal, State, and local government agencies to obtain related information.
From March 8-10, 2011, a review team consisting of staff from the U.S. Nuclear Regulatory Commission (NRC or the staff) and contractors from Argonne National Laboratories participated in a site audit at Davis-Besse Nuclear Power Station, Unit 1 (DBNPS) related to the environmental review of the DBNPS license renewal application. The primary goal of the site visit was to review documentation, gather information to ensure that the environmental requirements of license renewal as codified in Title 10 of the Code of Federal Regulations Part 51 (10 CFR Part 51) were met, and to interface with officials in Federal, State, and local government agencies to obtain related information. Enclosed is a list of representatives from the NRC, Argonne National Laboratories, other Federal agencies, and FirstEnergy Nuclear Operating Company (FENOC) who participated in the site audit.
Enclosed is a list of representatives from the NRC, Argonne National Laboratories, other Federal agencies, and FirstEnergy Nuclear Operating Company (FENOC) who participated in the site audit. The audit began on March 8, 2011, with a kickoff meeting to introduce participants and to discuss logistics of the audit. Following the kickoff meeting, the environmental review team partiCipated in a general site tour of DBNPS with FENOC staff. The general site tour provided an ecological overview of the site and focused on areas relevant to the environmental review. During the remainder of the site audit, the environmental review team examined data used by FENOC in preparation of the Environmental Report and met in smaller groups with FENOC representatives with corresponding environmental expertise.
The audit began on March 8, 2011, with a kickoff meeting to introduce participants and to discuss logistics of the audit. Following the kickoff meeting, the environmental review team partiCipated in a general site tour of DBNPS with FENOC staff. The general site tour provided an ecological overview of the site and focused on areas relevant to the environmental review.
These groups partiCipated in various activities, including tours of onsite National Pollutant Discharge Elimination permitted outtalls; circulating water systems; in-scope transmission line rights-ot-way; radioactive waste processing and storage areas; meteorological towers and monitoring equipment; and Title V-permitted air emission points. The environmental review team also met onsite with officials from Fish and Wildlife Services and the Black Swamp Bird Observatory.
During the remainder of the site audit, the environmental review team examined data used by FENOC in preparation of the Environmental Report and met in smaller groups with FENOC representatives with corresponding environmental expertise. These groups partiCipated in various activities, including tours of onsite National Pollutant Discharge Elimination System permitted outtalls; circulating water systems; in-scope transmission line rights-ot-way; radioactive waste processing and storage areas; meteorological towers and monitoring equipment; and Title V-permitted air emission points.
Information gathered through participation of these agencies will assist the environmental review team in its evaluation.
The environmental review team also met onsite with officials from Fish and Wildlife Services and the Black Swamp Bird Observatory. Information gathered through participation of these agencies will assist the environmental review team in its evaluation.
In addition, the team reviewed the FENOC process for identifying new and significant information (information that would challenge the generic conclusions reached in the Generic Environmental Impact Statement for License Renewal of Nuclear Plants, NUREG-1437).
In addition, the team reviewed the FENOC process for identifying new and significant information (information that would challenge the generic conclusions reached in the Generic Environmental Impact Statement for License Renewal of Nuclear Plants, NUREG-1437).
FENOC cited no new and significant information, and the team's independent review during the course of the site audit did not identify any either.
FENOC cited no new and significant information, and the team's independent review during the course of the site audit did not identify any either.
At the conclusion of the site audit, the environmental review team summarized the status of the review with FENOC representatives.
 
Most of the team's questions were answered through the conduct of the audit. Those that were not will be answered by FENOC as it responds to the team's request for additional information letter (ADAMS accession number ML11094A099).
                                            -2 At the conclusion of the site audit, the environmental review team summarized the status of the review with FENOC representatives. Most of the team's questions were answered through the conduct of the audit. Those that were not will be answered by FENOC as it responds to the team's request for additional information letter (ADAMS accession number ML11094A099).
While the NRC review team did not identify any significant issues during its site audit or during the meetings with other participants, the team indicated that the environmental review was ongoing and that any additional information necessary to support the review would be formally requested.
While the NRC review team did not identify any significant issues during its site audit or during the meetings with other participants, the team indicated that the environmental review was ongoing and that any additional information necessary to support the review would be formally requested.
Paula E. Cooper. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-346  
Paula E. Cooper. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-346


==Enclosure:==
==Enclosure:==


As stated cc w/encl: Listserv LIST OF DAVIS-BESSE NUCLEAR POWER LICENSE RENEWAL APPLICATION ENVIRONMENTAL SITE March 8-10,2011 PARTICIPANTS Briana Balsam April BeBault Paula Cooper Bill Rautzen Allison Travers Rich Bulavinetz Young-Soo Chang Ron Kolpa John Quinn Konnie Wescott Steven Dort Cliff Custer Don Kosloff Allen McAllister Kathy Nesser Jim Hester John Thomas Larry Hinkle Vito Kaminskas Brian Boles John Dominy AI Percival Brian Kremer Gil Nordlund Jack Reuter Pat McCloskey Steve Chimo Vince Capozziello Polly Boissoneault Darrell Converse Pete Mainhardt Steve Couture Craig Gale Rebecca Spach ORGANIZATION U.S. Nuclear Regulatory Commission (NRC) NRC NRC NRC NRC NRC Argonne National Laboratory (ANL) ANL ANL ANL FirstEnergy Nuclear Operating Company (FirstEnergy)
As stated cc w/encl: Listserv
FirstEnergy FirstEnergy FirstEnergy FirstEnergy FirstEnergy FirstEnergy FirstEnergy FirstEnergy FirstEnergy FirstEnergy FirstEnergy


FirstEnergy FirstEnergy FirstEnergy FirstEnergy FirstEnergy FirstEnergy FirstEnergy FirstEnergy  
LIST OF PARTICIPANTS DAVIS-BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION REVIEW ENVIRONMENTAL SITE AUDIT March 8-10,2011 PARTICIPANTS                      ORGANIZATION Briana Balsam                      U.S. Nuclear Regulatory Commission (NRC)
April BeBault                      NRC Paula Cooper                      NRC Bill Rautzen                      NRC Allison Travers                    NRC Rich Bulavinetz                    NRC Young-Soo Chang                    Argonne National Laboratory (ANL)
Ron Kolpa                          ANL John Quinn                        ANL Konnie Wescott                    ANL Steven Dort                        FirstEnergy Nuclear Operating Company (FirstEnergy)
Cliff Custer                      FirstEnergy Don Kosloff                        FirstEnergy Allen McAllister                  FirstEnergy Kathy Nesser                      FirstEnergy Jim Hester                        FirstEnergy John Thomas                        FirstEnergy Larry Hinkle                      FirstEnergy Vito Kaminskas                    FirstEnergy Brian Boles                        FirstEnergy John Dominy                        FirstEnergy AI Percival                        FirstEnergy Brian Kremer                      FirstEnergy Gil Nordlund                      FirstEnergy Jack Reuter                        FirstEnergy Pat McCloskey                      FirstEnergy Steve Chimo                        FirstEnergy Vince Capozziello                  FirstEnergy Polly Boissoneault                FirstEnergy Darrell Converse                  FirstEnergy Pete Mainhardt                    FirstEnergy Steve Couture                      FirstEnergy Craig Gale                        FirstEnergy Rebecca Spach                      FirstEnergy ENCLOSURE


FirstEnergy FirstEnergy FirstEnergy FirstEnergy ENCLOSURE PARTICIPANTS Christopher Hahn John Podnar Marjorie Twymon Bill Beach Vincent Conant Kim Kaufman Edward Pausch John Snooks -2 ORGANIZATION FirstEnergy FirstEnergy FirstEnergy FirstEnergy FirstEnergy Black Swamp Bird Observatory Fish and Wildlife Services Areva
                -2 PARTICIPANTS     ORGANIZATION Christopher Hahn FirstEnergy John Podnar     FirstEnergy Marjorie Twymon FirstEnergy Bill Beach       FirstEnergy Vincent Conant   FirstEnergy Kim Kaufman     Black Swamp Bird Observatory Edward Pausch    Fish and Wildlife Services John Snooks      Areva
-2 At the conclusion of the site audit, the environmental review team summarized the status of the review with FENOC representatives.
 
Most of the team's questions were answered through the conduct of the audit. Those that were not will be answered by FENOC as it responds to the team's request for additional information letter (ADAMS accession number ML11094A099).
                                            -2 At the conclusion of the site audit, the environmental review team summarized the status of the review with FENOC representatives. Most of the team's questions were answered through the conduct of the audit. Those that were not will be answered by FENOC as it responds to the team's request for additional information letter (ADAMS accession number ML11094A099).
While the NRC review team did not identify any significant issues during its site audit or during the meetings with other participants, the team indicated that the environmental review was ongoing and that any additional information necessary to support the review would be formally requested.
While the NRC review team did not identify any significant issues during its site audit or during the meetings with other participants, the team indicated that the environmental review was ongoing and that any additional information necessary to support the review would be formally requested.
IRA! Paula E. Cooper, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-346  
IRA!
Paula E. Cooper, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-346


==Enclosure:==
==Enclosure:==


As stated cc w/encl: Listserv DISTRIBUTION:
As stated cc w/encl: Listserv DISTRIBUTION:
See next page ADAMS Accession No ML110820276  
See next page ADAMS Accession No ML110820276                                                           -
*via email-OFFICE PM:RPB2:DLR LA:DLR* BC:RPB2:DLR PM:RPB2:DLR NAME PCooper IKing DWrona PCooper TE 05/31/11 03/24/11 06/01/11 06/03/11 OFFICIAL RECORD COpy Memorandum to FENOC from Paula Cooper dated June 3, 2011  
                                                                                    *via email OFFICE         PM:RPB2:DLR           LA:DLR*         BC:RPB2:DLR         PM:RPB2:DLR NAME           PCooper               IKing           DWrona               PCooper TE           05/31/11             03/24/11         06/01/11             06/03/11 OFFICIAL RECORD COpy
 
Memorandum to FENOC from Paula Cooper dated June 3, 2011
 
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF SITE AUDIT RELATED TO THE REVIEW OF THE LICENSE RENEWAL APPLICATION FOR DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 (TAC NO. ME4613) DISTRIBUTION:
OF SITE AUDIT RELATED TO THE REVIEW OF THE LICENSE RENEWAL APPLICATION FOR DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 (TAC NO. ME4613)
HARD DLR E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource BHarris PCooper DWrona AWang BPham DWrona Almboden ATravers RBulavinetz BBalsam ABeBault WRautzen ICouret, OPA VMitlyng, OPA TReilly, OCA EWilliamson, OGC AJones,OGC RRihm, EDO}}
DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource BHarris PCooper DWrona AWang BPham DWrona Almboden ATravers RBulavinetz BBalsam ABeBault WRautzen ICouret, OPA VMitlyng, OPA TReilly, OCA EWilliamson, OGC AJones,OGC RRihm, EDO}}

Latest revision as of 01:48, 13 November 2019

Summary of Site Audit Related to the Review of the License Renewal Application for Davis-Besse Nuclear Power Station, Unit 1
ML110820276
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/03/2011
From: Cooper P
License Renewal Projects Branch 2
To:
FirstEnergy Nuclear Operating Co
Cooper P, NRR/DLR, 415-2323
References
TAC ME4613
Download: ML110820276 (6)


Text

~",R REGu(.q UNITED STATES

",....§ '" .>-0.,..... NUCLEAR REGULATORY COMMISSION

~ 0 WASHINGTON, D.C. 20555-0001

<I: 0

\ii  :

~;i; June 3, 2011

~ ~

"'"

      • ....... ~o LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station

SUBJECT:

SUMMARY

OF SITE AUDIT RELATED TO THE REVIEW OF THE LICENSE RENEWAL APPLICATION FOR DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 (TAC NO. ME4613)

From March 8-10, 2011, a review team consisting of staff from the U.S. Nuclear Regulatory Commission (NRC or the staff) and contractors from Argonne National Laboratories participated in a site audit at Davis-Besse Nuclear Power Station, Unit 1 (DBNPS) related to the environmental review of the DBNPS license renewal application. The primary goal of the site visit was to review documentation, gather information to ensure that the environmental requirements of license renewal as codified in Title 10 of the Code of Federal Regulations Part 51 (10 CFR Part 51) were met, and to interface with officials in Federal, State, and local government agencies to obtain related information. Enclosed is a list of representatives from the NRC, Argonne National Laboratories, other Federal agencies, and FirstEnergy Nuclear Operating Company (FENOC) who participated in the site audit.

The audit began on March 8, 2011, with a kickoff meeting to introduce participants and to discuss logistics of the audit. Following the kickoff meeting, the environmental review team partiCipated in a general site tour of DBNPS with FENOC staff. The general site tour provided an ecological overview of the site and focused on areas relevant to the environmental review.

During the remainder of the site audit, the environmental review team examined data used by FENOC in preparation of the Environmental Report and met in smaller groups with FENOC representatives with corresponding environmental expertise. These groups partiCipated in various activities, including tours of onsite National Pollutant Discharge Elimination System permitted outtalls; circulating water systems; in-scope transmission line rights-ot-way; radioactive waste processing and storage areas; meteorological towers and monitoring equipment; and Title V-permitted air emission points.

The environmental review team also met onsite with officials from Fish and Wildlife Services and the Black Swamp Bird Observatory. Information gathered through participation of these agencies will assist the environmental review team in its evaluation.

In addition, the team reviewed the FENOC process for identifying new and significant information (information that would challenge the generic conclusions reached in the Generic Environmental Impact Statement for License Renewal of Nuclear Plants, NUREG-1437).

FENOC cited no new and significant information, and the team's independent review during the course of the site audit did not identify any either.

-2 At the conclusion of the site audit, the environmental review team summarized the status of the review with FENOC representatives. Most of the team's questions were answered through the conduct of the audit. Those that were not will be answered by FENOC as it responds to the team's request for additional information letter (ADAMS accession number ML11094A099).

While the NRC review team did not identify any significant issues during its site audit or during the meetings with other participants, the team indicated that the environmental review was ongoing and that any additional information necessary to support the review would be formally requested.

Paula E. Cooper. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-346

Enclosure:

As stated cc w/encl: Listserv

LIST OF PARTICIPANTS DAVIS-BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION REVIEW ENVIRONMENTAL SITE AUDIT March 8-10,2011 PARTICIPANTS ORGANIZATION Briana Balsam U.S. Nuclear Regulatory Commission (NRC)

April BeBault NRC Paula Cooper NRC Bill Rautzen NRC Allison Travers NRC Rich Bulavinetz NRC Young-Soo Chang Argonne National Laboratory (ANL)

Ron Kolpa ANL John Quinn ANL Konnie Wescott ANL Steven Dort FirstEnergy Nuclear Operating Company (FirstEnergy)

Cliff Custer FirstEnergy Don Kosloff FirstEnergy Allen McAllister FirstEnergy Kathy Nesser FirstEnergy Jim Hester FirstEnergy John Thomas FirstEnergy Larry Hinkle FirstEnergy Vito Kaminskas FirstEnergy Brian Boles FirstEnergy John Dominy FirstEnergy AI Percival FirstEnergy Brian Kremer FirstEnergy Gil Nordlund FirstEnergy Jack Reuter FirstEnergy Pat McCloskey FirstEnergy Steve Chimo FirstEnergy Vince Capozziello FirstEnergy Polly Boissoneault FirstEnergy Darrell Converse FirstEnergy Pete Mainhardt FirstEnergy Steve Couture FirstEnergy Craig Gale FirstEnergy Rebecca Spach FirstEnergy ENCLOSURE

-2 PARTICIPANTS ORGANIZATION Christopher Hahn FirstEnergy John Podnar FirstEnergy Marjorie Twymon FirstEnergy Bill Beach FirstEnergy Vincent Conant FirstEnergy Kim Kaufman Black Swamp Bird Observatory Edward Pausch Fish and Wildlife Services John Snooks Areva

-2 At the conclusion of the site audit, the environmental review team summarized the status of the review with FENOC representatives. Most of the team's questions were answered through the conduct of the audit. Those that were not will be answered by FENOC as it responds to the team's request for additional information letter (ADAMS accession number ML11094A099).

While the NRC review team did not identify any significant issues during its site audit or during the meetings with other participants, the team indicated that the environmental review was ongoing and that any additional information necessary to support the review would be formally requested.

IRA!

Paula E. Cooper, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-346

Enclosure:

As stated cc w/encl: Listserv DISTRIBUTION:

See next page ADAMS Accession No ML110820276 -

  • via email OFFICE PM:RPB2:DLR LA:DLR* BC:RPB2:DLR PM:RPB2:DLR NAME PCooper IKing DWrona PCooper TE 05/31/11 03/24/11 06/01/11 06/03/11 OFFICIAL RECORD COpy

Memorandum to FENOC from Paula Cooper dated June 3, 2011

SUBJECT:

SUMMARY

OF SITE AUDIT RELATED TO THE REVIEW OF THE LICENSE RENEWAL APPLICATION FOR DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 (TAC NO. ME4613)

DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource BHarris PCooper DWrona AWang BPham DWrona Almboden ATravers RBulavinetz BBalsam ABeBault WRautzen ICouret, OPA VMitlyng, OPA TReilly, OCA EWilliamson, OGC AJones,OGC RRihm, EDO