Letter Sequence Approval |
---|
|
|
MONTHYEARML11193A0932011-05-27027 May 2011 Reply to RAI for the Review of the Davis-Besse Nuclear Power Station, Unit 1, License Renewal Application Environmental Report and Enclosure a - Environmental Audit Needs List Project stage: Other ML1108202762011-06-0303 June 2011 Summary of Site Audit Related to the Review of the License Renewal Application for Davis-Besse Nuclear Power Station, Unit 1 Project stage: Approval L-11-154, Reply to Request for Additional Information for the Review of License Renewal Application, Environmental Report Severe Accident Mitigation Alternatives Analysis, and License Renewal Application Amendment No. 102011-06-24024 June 2011 Reply to Request for Additional Information for the Review of License Renewal Application, Environmental Report Severe Accident Mitigation Alternatives Analysis, and License Renewal Application Amendment No. 10 Project stage: Response to RAI L-11-222, Ohio Department of Natural Resources Office of Coastal Management Concurrence with Federal Consistency Certification Related to the Review of License Renewal Application Environmental Report2011-07-11011 July 2011 Ohio Department of Natural Resources Office of Coastal Management Concurrence with Federal Consistency Certification Related to the Review of License Renewal Application Environmental Report Project stage: Other ML1122701392011-08-15015 August 2011 Request for Additional Information Response Clarification from Davis-Besse Nuclear Power Station in Support of License Renewal Application Review Project stage: RAI L-11-251, Reply to Supplemental Request for Additional Information for Review of License Renewal Application, Environmental Report Severe Accident Mitigation Alternatives Analysis2011-09-0101 September 2011 Reply to Supplemental Request for Additional Information for Review of License Renewal Application, Environmental Report Severe Accident Mitigation Alternatives Analysis Project stage: Supplement L-11-288, License Renewal Application Amendment No. 17, Supplemental Information for Environmental Report2011-09-19019 September 2011 License Renewal Application Amendment No. 17, Supplemental Information for Environmental Report Project stage: Supplement L-11-289, License Renewal Application Amendment No. 16, Supplemental Information for the Review of the License Renewal Application Environmental Report2011-09-19019 September 2011 License Renewal Application Amendment No. 16, Supplemental Information for the Review of the License Renewal Application Environmental Report Project stage: Supplement ML12032A1312012-01-31031 January 2012 Schedule Revision for the Environmental Review of the Davis-Besse Nuclear Power Station, Unit No. 1, LRA Project stage: Approval ML12025A1092012-01-31031 January 2012 Schedule Revision for the Environmental Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application Project stage: Approval L-12-244, Correction of Errors in the License Renewal Application Environmental Report Severe Accident Mitigation Alternatives Analysis, and License Renewal Application Amendment No. 292012-07-16016 July 2012 Correction of Errors in the License Renewal Application Environmental Report Severe Accident Mitigation Alternatives Analysis, and License Renewal Application Amendment No. 29 Project stage: Other ML13205A0362013-07-31031 July 2013 Schedule Revision for the Environmental and Safety Review of the Davis-Besse Nuclear Power Station License Renewal Application (TAC Nos. ME4613 and ME4640) Project stage: Approval ML13302C2072013-11-0606 November 2013 Schedule Revision for the Review of the Davis-Besse Nuclear Power Station License Renewal Application (TAC ME4613 and ME4640) Project stage: Approval ML14027A2172014-01-30030 January 2014 Schedule Revision for Environmental Review of Davis-Besse Nuclear Power Station License Renewal Application Project stage: Approval ML14097A2722014-03-25025 March 2014 Slides for Davis-Besse Draft SEIS for License Renewal Public Meeting - Preliminary Site-Specific Results of the License Renewal Environmental Review for Davis-Besse Nuclear Power Station, March 25, 2014 Project stage: Draft Approval ML14097A2532014-03-25025 March 2014 Transcript of 03/25/2014 for Davis-Besse Nuclear Power Station Draft Environmental Impact Statement Public Meeting: Evening Session - Corrected. Pages 1-84 Project stage: Request ML14097A2542014-03-25025 March 2014 Draft Environmental Impact Statement Public Meeting: Afternoon Session - Corrected. Pages 1-56 Project stage: Request ML14112A3152014-04-21021 April 2014 Review of Draft Plant-Specific Supplement 52 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding ML14099A3392014-04-22022 April 2014 March 27, 2014, Summary of Telephone Conference Call Held Between Nuclear Regulatory Commission and First Energy Nuclear Operating Company Concerning Commitment 13 of the Safety Evaluation Report Pertaining to the Davis Besse Unit 1, Licens Project stage: Request ML14099A4642014-05-0606 May 2014 Summary of Public Meetings to Discuss Draft Supplement 52 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Davis-Besse Nuclear Generating Station, Unit 1 L-14-206, License Renewal Application Amendment No. 50 - Annual Update2014-06-23023 June 2014 License Renewal Application Amendment No. 50 - Annual Update Project stage: Other ML14329A4792014-11-28028 November 2014 Schedule Revision for the Review of the Davis-Besse Nuclear Power Station License Renewal Application (TAC No. ME613) Project stage: Approval ML15054A5342015-02-27027 February 2015 Schedule Revision and Project Manager Change for the Review of the Davis-Besse Nuclear Power Station License Renewal Application Project stage: Approval ML15113A1072015-04-30030 April 2015 Schedule Revision for the Review of the Davis-Besse Nuclear Power Station License Renewal Application Project stage: Approval 2013-11-06
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 the Associated Independent Spent Fuel Storage Installations IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000346/20230112023-08-30030 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000346/2023011 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000346/20230052023-08-24024 August 2023 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2023005) L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000346/20230502023-08-0303 August 2023 Special Inspection Report 05000346/2023050 L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program IR 05000346/20230902023-08-0101 August 2023 EA-23-002 Davis-Besse Nuclear Power Station - NRC Inspection Report No. 05000346/2023090 (Public) ML23178A2742023-08-0101 August 2023 Letter to the Honorable Marcy Kaptur from Chair Hanson Responds to Letter Regarding the License Transfer Application for the Davis-Besse Nuclear Power Station IR 05000346/20230022023-07-27027 July 2023 Integrated Inspection Report 05000346/2023002 ML23193A7842023-07-13013 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000346/2023402 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III 2024-08-01
[Table view] Category:Schedule and Calendars
MONTHYEARL-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML15113A1072015-04-30030 April 2015 Schedule Revision for the Review of the Davis-Besse Nuclear Power Station License Renewal Application ML14329A4792014-11-28028 November 2014 Schedule Revision for the Review of the Davis-Besse Nuclear Power Station License Renewal Application (TAC No. ME613) ML12032A1312012-01-31031 January 2012 Schedule Revision for the Environmental Review of the Davis-Besse Nuclear Power Station, Unit No. 1, LRA ML12025A1092012-01-31031 January 2012 Schedule Revision for the Environmental Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application ML11353A0152011-12-27027 December 2011 Schedule Revision for the Safety Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application ML12213A3572011-12-0202 December 2011 E-mail from S. Sakai to A. Erickson, Subject: FW: Licensee Projected Timeline ML1101901132011-02-28028 February 2011 Environmental Site Audit Regarding Davis-Besse Nuclear Power Station, Unit Number 1, License Renewal Application ML1034305802010-12-28028 December 2010 Schedule for the Conduct of Review of the Davis-Besse Nuclear Power Station, Unit 1, License Renewal Application L-09-335, Request for Extension of Enforcement Discretion for Noncompliances Related to Fire Protection Programs2010-01-14014 January 2010 Request for Extension of Enforcement Discretion for Noncompliances Related to Fire Protection Programs L-09-219, Response to Regulatory Issue Summary 2009-11, Preparation and Scheduling of Operator Licensing Examinations.2009-08-14014 August 2009 Response to Regulatory Issue Summary 2009-11, Preparation and Scheduling of Operator Licensing Examinations. 2023-05-31
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 28, 2014 Mr. Raymond A. Lieb, Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
SCHEDULE REVISION FOR THE REVIEW OF THE DAVIS-BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC NO. ME4613)
Dear Mr. Lieb:
By letter dated August 27, 2010, FirstEnergy Nuclear Operating Company submitted an application pursuant to Title 10 of the Code of Federal Regulations (10 CFR Part 51) and (10 CFR Part 54), to renew operating license NPF-003 for the Davis-Besse Nuclear Power Station, Unit 1 (Davis-Besse), for review by the U.S. Nuclear Regulatory Commission (NRC) staff. This letter is to inform you of a change in the environmental review schedule for the Davis-Besse license renewal review.
Regarding the staffs environmental review, by letter dated September 30, 2014, the staff issued a letter revising the environmental review schedule. This revision established a November 2014 issuance date for the final Supplemental Environmental Impact Statement (SEIS). Due to issues related to technical editing of the SEIS, the staff needs additional time to complete the final SEIS. The new issuance date for the final SEIS is January 2015.
Enclosed is the NRC staff's revised review schedule for the Davis-Besse license renewal application. If you have any questions related to the revised environmental schedule, please contact Elaine Keegan at 301-415-8517 or by e-mail at Elaine.Keegan@nrc.gov.
Sincerely,
/RA Dennis Morey for/
Christopher G. Miller, Director Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosure:
Revised Schedule cc w/encl: Listserv
ML14329A479 *concurred via email OFFICE LA:DLR* PM:RPB2:DLR BC:RPB2:DLR BC:RPB1:DLR D:DLR YDiaz-Sanabria NAME IBetts EKeegan BWittick CMiller (DMorey for)
(JMitchell for)
DATE 11/25/2014 11/26/14 11/26/14 11/28/14 11/28/14
DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 - LICENSE RENEWAL APPLICATION SCHEDULE REVISION Schedule Actual Milestones Date Date Receive license renewal application (LRA) 08/30/10 08/30/10 Publish Federal Register Notice (FRN) - LRA receipt and 09/17/10 09/20/10 availability Publish FRN - LRA acceptability and opportunity for hearing 10/20/10 10/25/10 Publish FRN - intent to conduct environmental scoping 10/20/10 10/28/10 Public Meeting - license renewal process and environmental 11/04/10 11/04/10 scoping Deadline for filing hearing requests and petitions for intervention 12/24/10 12/24/10 Environmental scoping periods ends 12/27/10 12/27/10 Audit - scoping and screening methodology 01/24/11 01/24/11 Audit - aging management programs (AMPs) 02/14/11 02/14/11 Audit - environmental 03/07/11 03/07/11 Inspection - scoping, screening, and AMPs 04/2011 04/25/11 Environmental Requests for Additional Information (RAIs) - Issued 04/08/11 02/23/11 Safety RAIs - Issued 04/29/11 04/29/11 Environmental RAIs - Response Received 05/13/11 03/23/11 Safety RAI - Responses Received 05/30/11 05/30/11 Issue safety evaluation report (SER) with open item(s) 07/2012 07/31/12 ACRS subcommittee meeting on SER with open item(s) 09/19/12 09/19/12 Issue SER 09/2013 09/03/13 Issue draft supplemental environmental impact statement (SEIS) 02/2014 02/26/14 ACRS second subcommittee meeting on SER TBD Public Meeting - draft SEIS 03/2014 03/25/14 End of comment period for the draft SEIS 04/2014 04/21/14 ACRS full committee meeting on SER TBD Issue final SEIS 01/2015 Decision - Director, Office of Nuclear Reactor Regulation TBD Commission decision (hearing pending) TBD ENCLOSURE
Letter to R. Lieb from C. Miller dated November 28, 2014
SUBJECT:
SCHEDULE REVISION FOR THE REVIEW OF THE DAVIS-BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC NO. ME4613)
DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource Listserv
Emmanuel.Sayoc@nrc.gov Elaine.Keegan@nrc.gov Richard.Plasse@nrc.gov Brian.Wittick@nrc.gov Yoira.Diaz-Sanabria@nrc.gov John.Lamb@nrc.gov David.McIntyre@nrc.gov Eva.Brown@nrc.gov Brian.Harris@nrc.gov Daniel.Kimble@nrc.gov Adam.Wilson@nrc.gov Jamnes.Cameron@nrc.gov Viktoria.Mitlyng@nrc.gov