IR 05000482/2015006: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 03/02/2016 | | issue date = 03/02/2016 | ||
| title = Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2015006) | | title = Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2015006) | ||
| author name = Taylor N | | author name = Taylor N | ||
| author affiliation = NRC/RGN-IV/DRP/RPB-B | | author affiliation = NRC/RGN-IV/DRP/RPB-B | ||
| addressee name = Heflin A | | addressee name = Heflin A | ||
| addressee affiliation = Wolf Creek Nuclear Operating Corp | | addressee affiliation = Wolf Creek Nuclear Operating Corp | ||
| docket = 05000482 | | docket = 05000482 | ||
| license number = NPF-042 | | license number = NPF-042 | ||
| contact person = Taylor N | | contact person = Taylor N | ||
| document report number = IR 2015006 | | document report number = IR 2015006 | ||
| document type = Inspection Plan, Letter | | document type = Inspection Plan, Letter | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:arch 2, 2016 | ||
==SUBJECT:== | |||
ANNUAL ASSESSMENT LETTER FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2015006) | |||
==Dear Mr. Heflin:== | |||
On February 16, 2016, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Wolf Creek Generating Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1 through December 31, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. | |||
The NRC determined that overall, Wolf Creek Generating Station operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Wolf Creek Generating Station during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) | |||
Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., | |||
green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. | |||
The enclosed inspection plan lists the inspections scheduled through December 31, 2017. | |||
Routine inspections performed by resident inspectors are not included in the inspection plan. | |||
The inspections listed during the second half of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. | |||
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. | |||
Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. This Order requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. This audit includes an onsite component in order for the NRC to evaluate licensee plans for complying with the Orders, as described in site-specific submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of a Safety Evaluation for the site. The date for the onsite component at your site is being coordinated with your staff. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations. Following the audit, and after the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191: | |||
Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Please contact me at 817-200-1141 with any questions you have regarding this letter. | |||
Sincerely, | |||
/RA/ | |||
Nick Taylor, Chief Project Branch B Division of Reactor Projects Docket No: 50-482 License No: NPF-42 Enclosure: | |||
Wolf Creek Generating Station Inspection/Activity Plan | Wolf Creek Generating Station Inspection/Activity Plan | ||
ML16061A402 SUNSI Review ADAMS: Sensitive Non-Publicly Available Keyword By: NHT Yes No Non-Sensitive Publicly Available NRC-002 OFFICE RIV/BC/DRP RIV/D/DRS RIV/D/DRP NAME NTaylor AVegel TPruett SIGNATURE /RA/ /RA/ /RA/RLantz, for DATE 2/25/16 2/25/16 2/26/16 | |||
Letter to Adam from Nick Taylor dated March 2, 2016 SUBJECT: ANNUAL ASSESSMENT LETTER FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2015005) | |||
DISTRIBUTION: | |||
Regional Administrator (Marc.Dapas@nrc.gov) | |||
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | |||
DRP Director (Troy.Pruett@nrc.gov) | |||
DRP Deputy Director (Ryan.Lantz@nrc.gov) | |||
DRS Director (Anton.Vegel@nrc.gov) | |||
DRS Deputy Director (Jeff.Clark@nrc.gov) | |||
Senior Resident Inspector (Douglas.Dodson@nrc.gov) | |||
Resident Inspector (Fabian.Thomas@nrc.gov) | |||
WC Administrative Assistant (Vacant) | |||
Branch Chief, DRP/B (Nick.Taylor@nrc.gov) | |||
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov) | |||
Project Engineer, DRP/B (Shawn.Money@nrc.gov) | |||
Project Engineer, DRP/B (Steven.Janicki@nrc.gov) | |||
Public Affairs Officer (Victor.Dricks@nrc.gov) | |||
Project Manager (Fred.Lyon@nrc.gov) | |||
Team Leader, DRS/TSS (Thomas.Hipschman@nrc.gov) | |||
RITS Coordinator (Marisa.Herrera@nrc.gov) | |||
ACES (R4Enforcement.Resource@nrc.gov) | |||
Regional Counsel (Karla.Fuller@nrc.gov) | |||
Technical Support Assistant (Loretta.Williams@nrc.gov) | |||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | |||
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | |||
RIV/ETA: OEDO (Raj.Iyengar@nrc.gov) | |||
Director, DIRS, NRR (Scott.Morris@nrc.gov) | |||
Deputy Director, DIRS, NRR (Clay.Johnson@nrc.gov) | |||
Director, DORL, NRR (Anne.Boland@nrc.gov) | |||
Deputy Director, DORL, NRR (George.Wilson@nrc.gov) | |||
Director, DPR (Lawrence.Kokajko@nrc.gov) | |||
Director, NSIR (Brian.Holian@nrc.gov) | |||
DRP Branch Chiefs (R4DRPBC@nrc.gov) | |||
DRS Branch Chiefs (R4DRSBC@nrc.gov) | |||
ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov | |||
Page 1 of 2 Wolf Creek 02/29/2016 15:49:02 Inspection / Activity Plan Report 22 04/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EB1-21T - WC COMPONENT DESIGN BASIS INSPECTION 6 1 03/28/2016 04/29/2016 IP 7111121 Component Design Bases Inspection EB1-07T - WC HEAT SINK PERFORMANCE 2 1 05/23/2016 05/27/2016 IP 7111107T Heat Sink Performance RS 5678 - RADIATION SAFETY - TEAM 4 1 05/23/2016 05/27/2016 IP 71124.05 Radiation Monitoring Instrumentation 1 05/23/2016 05/27/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 05/23/2016 05/27/2016 IP 71124.07 Radiological Environmental Monitoring Program 1 05/23/2016 05/27/2016 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation TSB 52B - BIENNIAL PI&R INSPECTION 4 1 06/13/2016 06/17/2016 IP 71152B Problem Identification and Resolution 1 06/27/2016 07/01/2016 IP 71152B Problem Identification and Resolution INSP - BIENNIAL REQUAL INSPECTION 2 1 06/27/2016 07/01/2016 IP 7111111B Licensed Operator Requalification Program EP-1 - EP PERFORMANCE INDICATORS 1 1 08/01/2016 08/05/2016 IP 71151-EP02 ERO Readiness 1 08/01/2016 08/05/2016 IP 71151-EP03 Alert & Notification System Reliability 1 08/01/2016 08/05/2016 IP 71151-IE01 Unplanned Scrams per 7000 Critical Hrs EP-2 - BIENNIAL EP PROGRAM INSPECTION 1 1 08/01/2016 08/05/2016 IP 7111402 Alert and Notification System Testing 1 08/01/2016 08/05/2016 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 08/01/2016 08/05/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 08/01/2016 08/05/2016 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies RS 12 PI - RADIATION SAFETY 2 1 10/03/2016 10/07/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/03/2016 10/07/2016 IP 71124.02 Occupational ALARA Planning and Controls 1 10/03/2016 10/07/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 10/03/2016 10/07/2016 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71111.08 - INSERVICE INSPECTION 1 1 10/03/2016 10/14/2016 IP 7111108P Inservice Inspection Activities - PWR INIT EXA - INITIAL EXAM 7 1 10/16/2017 10/20/2017 X02597 INITIAL EXAM WOLF CREEK (11/2017) | |||
1 11/13/2017 11/24/2017 X02597 INITIAL EXAM WOLF CREEK (11/2017) | |||
This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Page 2 of 2 Wolf Creek 02/29/2016 15:49:02 Inspection / Activity Plan Report 22 04/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RS 13 PI - RADIATION SAFETY 2 1 05/08/2017 05/12/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 05/08/2017 05/12/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 05/08/2017 05/12/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 05/08/2017 05/12/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences RS 24 - RADIATION SAFETY 2 1 06/12/2017 06/16/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 06/12/2017 06/16/2017 IP 71124.04 Occupational Dose Assessment EB2-05T - TRIENNIAL FIRE PROTECTION INSPECTION 4 1 08/07/2017 08/11/2017 IP 7111105T Fire Protection [Triennia ] | |||
1 08/21/2017 08/25/2017 IP 7111105T Fire Protection [Triennia ] | |||
EP-2 - BIENNIAL EP EXERCISE INSPECTION 4 1 11/13/2017 11/17/2017 IP 7111401 Exercise Evaluation 1 11/13/2017 11/17/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes EP-3 - EP PERFORMANCE INDICATOR VERIFICATION 1 1 11/13/2017 11/17/2017 IP 71151-EP01 Drill/Exercise Performance 1 11/13/2017 11/17/2017 IP 71151-EP02 ERO Readiness 1 11/13/2017 11/17/2017 IP 71151-EP03 Alert & Notification System Reliability This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
}} | }} |
Latest revision as of 22:20, 30 October 2019
ML16061A402 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 03/02/2016 |
From: | Nick Taylor NRC/RGN-IV/DRP/RPB-B |
To: | Heflin A Wolf Creek |
Taylor N | |
References | |
IR 2015006 | |
Download: ML16061A402 (6) | |
Text
arch 2, 2016
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2015006)
Dear Mr. Heflin:
On February 16, 2016, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Wolf Creek Generating Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1 through December 31, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Wolf Creek Generating Station operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Wolf Creek Generating Station during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP)
Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e.,
green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2017.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the second half of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event.
Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. This Order requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. This audit includes an onsite component in order for the NRC to evaluate licensee plans for complying with the Orders, as described in site-specific submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of a Safety Evaluation for the site. The date for the onsite component at your site is being coordinated with your staff. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations. Following the audit, and after the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191:
Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 817-200-1141 with any questions you have regarding this letter.
Sincerely,
/RA/
Nick Taylor, Chief Project Branch B Division of Reactor Projects Docket No: 50-482 License No: NPF-42 Enclosure:
Wolf Creek Generating Station Inspection/Activity Plan
ML16061A402 SUNSI Review ADAMS: Sensitive Non-Publicly Available Keyword By: NHT Yes No Non-Sensitive Publicly Available NRC-002 OFFICE RIV/BC/DRP RIV/D/DRS RIV/D/DRP NAME NTaylor AVegel TPruett SIGNATURE /RA/ /RA/ /RA/RLantz, for DATE 2/25/16 2/25/16 2/26/16
Letter to Adam from Nick Taylor dated March 2, 2016 SUBJECT: ANNUAL ASSESSMENT LETTER FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2015005)
DISTRIBUTION:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Douglas.Dodson@nrc.gov)
Resident Inspector (Fabian.Thomas@nrc.gov)
WC Administrative Assistant (Vacant)
Branch Chief, DRP/B (Nick.Taylor@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Shawn.Money@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Fred.Lyon@nrc.gov)
Team Leader, DRS/TSS (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Raj.Iyengar@nrc.gov)
Director, DIRS, NRR (Scott.Morris@nrc.gov)
Deputy Director, DIRS, NRR (Clay.Johnson@nrc.gov)
Director, DORL, NRR (Anne.Boland@nrc.gov)
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
Director, DPR (Lawrence.Kokajko@nrc.gov)
Director, NSIR (Brian.Holian@nrc.gov)
DRP Branch Chiefs (R4DRPBC@nrc.gov)
DRS Branch Chiefs (R4DRSBC@nrc.gov)
ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov
Page 1 of 2 Wolf Creek 02/29/2016 15:49:02 Inspection / Activity Plan Report 22 04/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EB1-21T - WC COMPONENT DESIGN BASIS INSPECTION 6 1 03/28/2016 04/29/2016 IP 7111121 Component Design Bases Inspection EB1-07T - WC HEAT SINK PERFORMANCE 2 1 05/23/2016 05/27/2016 IP 7111107T Heat Sink Performance RS 5678 - RADIATION SAFETY - TEAM 4 1 05/23/2016 05/27/2016 IP 71124.05 Radiation Monitoring Instrumentation 1 05/23/2016 05/27/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 05/23/2016 05/27/2016 IP 71124.07 Radiological Environmental Monitoring Program 1 05/23/2016 05/27/2016 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation TSB 52B - BIENNIAL PI&R INSPECTION 4 1 06/13/2016 06/17/2016 IP 71152B Problem Identification and Resolution 1 06/27/2016 07/01/2016 IP 71152B Problem Identification and Resolution INSP - BIENNIAL REQUAL INSPECTION 2 1 06/27/2016 07/01/2016 IP 7111111B Licensed Operator Requalification Program EP-1 - EP PERFORMANCE INDICATORS 1 1 08/01/2016 08/05/2016 IP 71151-EP02 ERO Readiness 1 08/01/2016 08/05/2016 IP 71151-EP03 Alert & Notification System Reliability 1 08/01/2016 08/05/2016 IP 71151-IE01 Unplanned Scrams per 7000 Critical Hrs EP-2 - BIENNIAL EP PROGRAM INSPECTION 1 1 08/01/2016 08/05/2016 IP 7111402 Alert and Notification System Testing 1 08/01/2016 08/05/2016 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 08/01/2016 08/05/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 08/01/2016 08/05/2016 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies RS 12 PI - RADIATION SAFETY 2 1 10/03/2016 10/07/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/03/2016 10/07/2016 IP 71124.02 Occupational ALARA Planning and Controls 1 10/03/2016 10/07/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 10/03/2016 10/07/2016 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71111.08 - INSERVICE INSPECTION 1 1 10/03/2016 10/14/2016 IP 7111108P Inservice Inspection Activities - PWR INIT EXA - INITIAL EXAM 7 1 10/16/2017 10/20/2017 X02597 INITIAL EXAM WOLF CREEK (11/2017)
1 11/13/2017 11/24/2017 X02597 INITIAL EXAM WOLF CREEK (11/2017)
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Wolf Creek 02/29/2016 15:49:02 Inspection / Activity Plan Report 22 04/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RS 13 PI - RADIATION SAFETY 2 1 05/08/2017 05/12/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 05/08/2017 05/12/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 05/08/2017 05/12/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 05/08/2017 05/12/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences RS 24 - RADIATION SAFETY 2 1 06/12/2017 06/16/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 06/12/2017 06/16/2017 IP 71124.04 Occupational Dose Assessment EB2-05T - TRIENNIAL FIRE PROTECTION INSPECTION 4 1 08/07/2017 08/11/2017 IP 7111105T Fire Protection [Triennia ]
1 08/21/2017 08/25/2017 IP 7111105T Fire Protection [Triennia ]
EP-2 - BIENNIAL EP EXERCISE INSPECTION 4 1 11/13/2017 11/17/2017 IP 7111401 Exercise Evaluation 1 11/13/2017 11/17/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes EP-3 - EP PERFORMANCE INDICATOR VERIFICATION 1 1 11/13/2017 11/17/2017 IP 71151-EP01 Drill/Exercise Performance 1 11/13/2017 11/17/2017 IP 71151-EP02 ERO Readiness 1 11/13/2017 11/17/2017 IP 71151-EP03 Alert & Notification System Reliability This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.