IR 05000482/2017005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 08/28/2017
| issue date = 08/28/2017
| title = Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2017005)
| title = Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2017005)
| author name = Taylor N H
| author name = Taylor N
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| addressee name = Heflin A C
| addressee name = Heflin A
| addressee affiliation = Wolf Creek Nuclear Operating Corp
| addressee affiliation = Wolf Creek Nuclear Operating Corp
| docket = 05000482
| docket = 05000482
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:ust 28, 2017
[[Issue date::August 28, 2017]]


Adam C. Heflin, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411
==SUBJECT:==
UPDATED INSPECTION PLAN FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2017005)


Burlington, KS 66839
==Dear Mr. Heflin:==
The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Wolf Creek Generating Station. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.


SUBJECT: UPDATED INSPECTION PLAN FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2017005)
Additionally, as reflected in the enclosure, during this period the NRC staff will complete Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. This inspection will be conducted at Wolf Creek Generating Station to confirm the stations full implementation of Commission Orders EA-12-049 and EA-12-051.


==Dear Mr. Heflin:==
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for
The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Wolf Creek Generating Station.


The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
A. Helflin  2 public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


This inspection plan does not include the plan for security
Please contact me at (817) 200-1141 with any questions you have regarding this letter.
-related inspections, which will be sent via separate, non
-publicly available correspondence.


Additionally, as reflected in the enclosure, during this period the NRC staff will complete Temporary Instruction 2515/191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi
Sincerely,
-Unit Dose Assessment Plans." This inspection will be conducted at Wolf Creek Generating Station to confirm the station's full implementation of Commission Orders EA
/RA D. Proulx for/
-12-049 and EA
Nicholas H. Taylor, Branch Chief Project Branch B Division of Reactor Projects Docket No. 05000482 License No. NPF-42 Enclosure:
-12-051. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011
Wolf Creek Generating Station Inspection Plan
-4511 A. Helflin 2 public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).


Please contact me at (817) 200
ML17242A207 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword-NRC-002 By:NHT/dll Yes No Publicly Available Sensitive OFFICE RIV/DRP:SPE RIV/DRP:C NAME DProulx NTaylor SIGNATURE /RA/ /RA DProulx for/
-1141 with any questions you have regarding this letter.
DATE 8/28/17 8/28/17


Sincerely,/RA D. Proulx for/
Page 1 of 2      Wolf Creek 08/25/2017 08:25:55    Inspection / Activity Plan Report 22 07/01/2017 - 06/30/2019 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site INIT EXA - INITIAL EXAM      5 1 10/16/2017 10/20/2017 X02597 INITIAL EXAM WOLF CREEK (11/2017)
Nicholas H. Taylor, Branch Chief Project Branch B Division of Reactor Projects Docket No. 0 5000482 License No. NPF
1 11/06/2017 11/10/2017 X02597 INITIAL EXAM WOLF CREEK (11/2017)
-42
EB1-21N - WC DESIGN BASIS INSPECTION PROGRAMS      3 1 05/08/2017 07/13/2017 IP 7111121N Design Bases Assurance Inspection (Programs)
PI&R - PI&R FOCUSED SAMPLE - SCWE      2 1 08/29/2017 08/30/2017 IP 71152-Reviews In-depth Reviews EB2-05T - TRIENNIAL FIRE PROTECTION INSPECTION      4 1 10/02/2017 10/06/2017 IP 7111105T Fire Protection [Triennial]
1 10/16/2017 10/20/2017 IP 7111105T Fire Protection [Triennial]
EP-2 - BIENNIAL EP EXERCISE INSPECTION      4 1 11/13/2017 11/17/2017 IP 7111401 Exercise Evaluation 1 11/13/2017 11/17/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes EP-3 - EP PERFORMANCE INDICATOR VERIFICATION      1 1 11/13/2017 11/17/2017 IP 71151-EP01 Drill/Exercise Performance 1 11/13/2017 11/17/2017 IP 71151-EP02 ERO Readiness 1 11/13/2017 11/17/2017 IP 71151-EP03 Alert & Notification System Reliability TI191 - MITIGATING STRATEGIES/SFP INST FOR BDBEE      4 1 01/22/2018 01/26/2018 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 7111108 - INSERVICE INSPECTION      1 1 04/02/2018 04/13/2018 IP 7111108P Inservice Inspection Activities - PWR RS 12PI - RAD SAFETY        2 1 04/09/2018 04/13/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/09/2018 04/13/2018 IP 71124.02 Occupational ALARA Planning and Controls 1 04/09/2018 04/13/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 04/09/2018 04/13/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences INSP - BRQ INSPECTION      2 1 06/04/2018 06/08/2018 IP 7111111B Licensed Operator Requalification Program PI&R - BIENNIAL PI&R INSPECTION      4 1 06/11/2018 06/15/2018 IP 71152B Problem Identification and Resolution 1 06/25/2018 06/29/2018 IP 71152B Problem Identification and Resolution EB1-21M - WC DESIGN BASES INSPECTION TEAMS      6 1 07/16/2018 08/03/2018 IP 7111121M Design Bases Assurance Inspection (Teams)
This report does not include INPO and OUTAGE activities.


===Enclosure:===
This report shows only on-site and announced inspection procedures.
Wolf Creek Generating Station Inspection Plan


SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword-NRC-002 By:NHT/dll Yes No Publicly Available Sensitive OFFICE RIV/DRP:SPE RIV/DRP:C NAME DProulx NTaylor SIGNATURE
Page 2 of 2      Wolf Creek 08/25/2017 08:25:55    Inspection / Activity Plan Report 22 07/01/2017 - 06/30/2019 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site RS 5678 - RAD SAFETY        4 1 08/20/2018 08/24/2018 IP 71124.05 Radiation Monitoring Instrumentation 1 08/20/2018 08/24/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 08/20/2018 08/24/2018 IP 71124.07 Radiological Environmental Monitoring Program 1 08/20/2018 08/24/2018 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EP-1 - EP PROGRAM INSPECTION       1 1 09/17/2018 09/21/2018 IP 7111402 Alert and Notification System Testing 1 09/17/2018 09/21/2018 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 09/17/2018 09/21/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 09/17/2018 09/21/2018 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 09/17/2018 09/21/2018 IP 71151-EP01 Drill/Exercise Performance 1 09/17/2018 09/21/2018 IP 71151-EP02 ERO Readiness 1 09/17/2018 09/21/2018 IP 71151-EP03 Alert & Notification System Reliability EB1-17T - WOLF CREEK 10CFR50.59 INSPECTION      3 1 04/29/2019 05/03/2019 IP 7111117T Evaluations of Changes, Tests, and Experiments RS 24 - RP INSPECTION      1 1 05/06/2019 05/10/2019 IP 71124.02 Occupational ALARA Planning and Controls 1 05/06/2019 05/10/2019 IP 71124.04 Occupational Dose Assessment EP-2 - EP EXERCISE INSPECTION      4 1 06/03/2019 06/07/2019 IP 7111401 Exercise Evaluation 1 06/03/2019 06/07/2019 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 06/03/2019 06/07/2019 IP 71151-EP01 Drill/Exercise Performance 1 06/03/2019 06/07/2019 IP 71151-EP02 ERO Readiness 1 06/03/2019 06/07/2019 IP 71151-EP03 Alert & Notification System Reliability EP2 - EP EXERCISE AND PI INSPECTION     4 1 06/03/2019 06/07/2019 IP 7111401 Exercise Evaluation 1 06/03/2019 06/07/2019 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 06/03/2019 06/07/2019 IP 71151-EP01 Drill/Exercise Performance 1 06/03/2019 06/07/2019 IP 71151-EP02 ERO Readiness 1 06/03/2019 06/07/2019 IP 71151-EP03 Alert & Notification System Reliability This report does not include INPO and OUTAGE activities.
/RA/ /RA DProulx for/ DATE 8/28/17 8/28/17 Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteWolf CreekInspection / Activity Plan 07/01/2017
-06/30/2019 Page 1 of 2 08/25/2017 08:25:55 INIT EXA-INITIAL EXAM 51 INITIAL EXAM WOLF CREEK (11/2017)
X0259710/16/2017 10/20/2017 1 INITIAL EXAM WOLF CREEK (11/2017)
X0259711/06/201711/10/2017 EB1-21N-WC DESIGN BASIS INSPECTION PROGRAMS 31 IPDesign Bases Assurance Inspection (Programs)7111121N05/08/2017 07/13/2017 PI&R-PI&R FOCUSED SAMPLE - SCWE 21 IPIn-depth Reviews71152-Reviews 08/29/2017 08/30/2017 EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION 41 IPFire Protection [Triennial]7111105T10/02/2017 10/06/2017 1 IPFire Protection [Triennial]7111105T10/16/2017 10/20/2017 EP-2-BIENNIAL EP EXERCISE INSPECTION 41 IPExercise Evaluation711140111/13/201711/17/2017 1 IPEmergency Action Level and Emergency Plan Changes711140411/13/201711/17/2017 EP-3-EP PERFORMANCE INDICATOR VERIFICATION 11 IPDrill/Exercise Performance71151-EP0111/13/201711/17/2017 1 IPERO Readiness71151-EP0211/13/201711/17/2017 1 IPAlert & Notification System Reliability71151-EP0311/13/201711/17/2017TI191-MITIGATING STRATEGIES/SFP INST FOR BDBEE 41 IPInspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/19101/22/2018 01/26/20187111108-INSERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P04/02/2018 04/13/2018 RS 12PI-RAD SAFETY 21 IPRadiological Hazard Assessment and Exposure Controls71124.0104/09/2018 04/13/2018 1 IPOccupational ALARA Planning and Controls71124.0204/09/2018 04/13/2018 1 IPOccupational Exposure Control Effectiveness71151-OR01 04/09/2018 04/13/2018 1 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 04/09/2018 04/13/2018 INSP-BRQ INSPECTION 21 IPLicensed Operator Requalification Program7111111B06/04/2018 06/08/2018 PI&R-BIENNIAL PI&R INSPECTION 41 IPProblem Identification and Resolution71152B06/11/2018 06/15/2018 1 IPProblem Identification and Resolution71152B06/25/2018 06/29/2018 EB1-21M-WC DESIGN BASES INSPECTION TEAMS 61 IPDesign Bases Assurance Inspection (Teams)7111121M07/16/2018 08/03/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.


Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteWolf CreekInspection / Activity Plan 07/01/2017
This report shows only on-site and announced inspection procedures.
-06/30/2019 Page 2 of 2 08/25/2017 08:25:55 RS 5678-RAD SAFETY 41 IPRadiation Monitoring Instrumentation71124.0508/20/2018 08/24/2018 1 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0608/20/2018 08/24/2018 1 IPRadiological Environmental Monitoring Program71124.0708/20/2018 08/24/2018 1 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0808/20/2018 08/24/2018 EP-1-EP PROGRAM INSPECTION 11 IPAlert and Notification System Testing711140209/17/2018 09/21/2018 1 IPEmergency Preparedness Organization Staffing and Augmentation System711140309/17/2018 09/21/2018 1 IPEmergency Action Level and Emergency Plan Changes711140409/17/2018 09/21/2018 1 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140509/17/2018 09/21/2018 1 IPDrill/Exercise Performance71151-EP01 09/17/2018 09/21/2018 1 IPERO Readiness71151-EP02 09/17/2018 09/21/2018 1 IPAlert & Notification System Reliability71151-EP03 09/17/2018 09/21/2018 EB1-17T-WOLF CREEK 10CFR50.59 INSPECTION 31 IPEvaluations of Changes, Tests, and Experiments7111117T04/29/2019 05/03/2019 RS 24-RP INSPECTION 11 IPOccupational ALARA Planning and Controls71124.0205/06/2019 05/10/2019 1 IPOccupational Dose Assessment71124.0405/06/2019 05/10/2019 EP-2-EP EXERCISE INSPECTION 41 IPExercise Evaluation711140106/03/2019 06/07/2019 1 IPEmergency Action Level and Emergency Plan Changes711140406/03/2019 06/07/2019 1 IPDrill/Exercise Performance71151-EP01 06/03/2019 06/07/2019 1 IPERO Readiness71151-EP02 06/03/2019 06/07/2019 1 IPAlert & Notification System Reliability71151-EP03 06/03/2019 06/07/2019 EP2-EP EXERCISE AND PI INSPECTION 41 IPExercise Evaluation711140106/03/2019 06/07/2019 1 IPEmergency Action Level and Emergency Plan Changes711140406/03/2019 06/07/2019 1 IPDrill/Exercise Performance71151-EP01 06/03/2019 06/07/2019 1 IPERO Readiness71151-EP02 06/03/2019 06/07/2019 1 IPAlert & Notification System Reliability71151-EP03 06/03/2019 06/07/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 20:21, 29 October 2019

Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2017005)
ML17242A207
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 08/28/2017
From: Nick Taylor
NRC/RGN-IV/DRP/RPB-B
To: Heflin A
Wolf Creek
NICK TAYLOR
References
IR 2017005
Download: ML17242A207 (5)


Text

ust 28, 2017

SUBJECT:

UPDATED INSPECTION PLAN FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2017005)

Dear Mr. Heflin:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Wolf Creek Generating Station. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

Additionally, as reflected in the enclosure, during this period the NRC staff will complete Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. This inspection will be conducted at Wolf Creek Generating Station to confirm the stations full implementation of Commission Orders EA-12-049 and EA-12-051.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for

A. Helflin 2 public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (817) 200-1141 with any questions you have regarding this letter.

Sincerely,

/RA D. Proulx for/

Nicholas H. Taylor, Branch Chief Project Branch B Division of Reactor Projects Docket No. 05000482 License No. NPF-42 Enclosure:

Wolf Creek Generating Station Inspection Plan

ML17242A207 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword-NRC-002 By:NHT/dll Yes No Publicly Available Sensitive OFFICE RIV/DRP:SPE RIV/DRP:C NAME DProulx NTaylor SIGNATURE /RA/ /RA DProulx for/

DATE 8/28/17 8/28/17

Page 1 of 2 Wolf Creek 08/25/2017 08:25:55 Inspection / Activity Plan Report 22 07/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site INIT EXA - INITIAL EXAM 5 1 10/16/2017 10/20/2017 X02597 INITIAL EXAM WOLF CREEK (11/2017)

1 11/06/2017 11/10/2017 X02597 INITIAL EXAM WOLF CREEK (11/2017)

EB1-21N - WC DESIGN BASIS INSPECTION PROGRAMS 3 1 05/08/2017 07/13/2017 IP 7111121N Design Bases Assurance Inspection (Programs)

PI&R - PI&R FOCUSED SAMPLE - SCWE 2 1 08/29/2017 08/30/2017 IP 71152-Reviews In-depth Reviews EB2-05T - TRIENNIAL FIRE PROTECTION INSPECTION 4 1 10/02/2017 10/06/2017 IP 7111105T Fire Protection [Triennial]

1 10/16/2017 10/20/2017 IP 7111105T Fire Protection [Triennial]

EP-2 - BIENNIAL EP EXERCISE INSPECTION 4 1 11/13/2017 11/17/2017 IP 7111401 Exercise Evaluation 1 11/13/2017 11/17/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes EP-3 - EP PERFORMANCE INDICATOR VERIFICATION 1 1 11/13/2017 11/17/2017 IP 71151-EP01 Drill/Exercise Performance 1 11/13/2017 11/17/2017 IP 71151-EP02 ERO Readiness 1 11/13/2017 11/17/2017 IP 71151-EP03 Alert & Notification System Reliability TI191 - MITIGATING STRATEGIES/SFP INST FOR BDBEE 4 1 01/22/2018 01/26/2018 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 7111108 - INSERVICE INSPECTION 1 1 04/02/2018 04/13/2018 IP 7111108P Inservice Inspection Activities - PWR RS 12PI - RAD SAFETY 2 1 04/09/2018 04/13/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/09/2018 04/13/2018 IP 71124.02 Occupational ALARA Planning and Controls 1 04/09/2018 04/13/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 04/09/2018 04/13/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences INSP - BRQ INSPECTION 2 1 06/04/2018 06/08/2018 IP 7111111B Licensed Operator Requalification Program PI&R - BIENNIAL PI&R INSPECTION 4 1 06/11/2018 06/15/2018 IP 71152B Problem Identification and Resolution 1 06/25/2018 06/29/2018 IP 71152B Problem Identification and Resolution EB1-21M - WC DESIGN BASES INSPECTION TEAMS 6 1 07/16/2018 08/03/2018 IP 7111121M Design Bases Assurance Inspection (Teams)

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Wolf Creek 08/25/2017 08:25:55 Inspection / Activity Plan Report 22 07/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RS 5678 - RAD SAFETY 4 1 08/20/2018 08/24/2018 IP 71124.05 Radiation Monitoring Instrumentation 1 08/20/2018 08/24/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 08/20/2018 08/24/2018 IP 71124.07 Radiological Environmental Monitoring Program 1 08/20/2018 08/24/2018 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EP-1 - EP PROGRAM INSPECTION 1 1 09/17/2018 09/21/2018 IP 7111402 Alert and Notification System Testing 1 09/17/2018 09/21/2018 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 09/17/2018 09/21/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 09/17/2018 09/21/2018 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 09/17/2018 09/21/2018 IP 71151-EP01 Drill/Exercise Performance 1 09/17/2018 09/21/2018 IP 71151-EP02 ERO Readiness 1 09/17/2018 09/21/2018 IP 71151-EP03 Alert & Notification System Reliability EB1-17T - WOLF CREEK 10CFR50.59 INSPECTION 3 1 04/29/2019 05/03/2019 IP 7111117T Evaluations of Changes, Tests, and Experiments RS 24 - RP INSPECTION 1 1 05/06/2019 05/10/2019 IP 71124.02 Occupational ALARA Planning and Controls 1 05/06/2019 05/10/2019 IP 71124.04 Occupational Dose Assessment EP-2 - EP EXERCISE INSPECTION 4 1 06/03/2019 06/07/2019 IP 7111401 Exercise Evaluation 1 06/03/2019 06/07/2019 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 06/03/2019 06/07/2019 IP 71151-EP01 Drill/Exercise Performance 1 06/03/2019 06/07/2019 IP 71151-EP02 ERO Readiness 1 06/03/2019 06/07/2019 IP 71151-EP03 Alert & Notification System Reliability EP2 - EP EXERCISE AND PI INSPECTION 4 1 06/03/2019 06/07/2019 IP 7111401 Exercise Evaluation 1 06/03/2019 06/07/2019 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 06/03/2019 06/07/2019 IP 71151-EP01 Drill/Exercise Performance 1 06/03/2019 06/07/2019 IP 71151-EP02 ERO Readiness 1 06/03/2019 06/07/2019 IP 71151-EP03 Alert & Notification System Reliability This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.