IR 05000397/2016008: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:May 27, 2016
{{#Wiki_filter:==SUBJECT:==
 
==SUBJECT:==
COLUMBIA GENERATING STATION - DESIGN BASES INSPECTION (PROGRAMS) (INSPE CTION REPORT 05000397/2016008)
COLUMBIA GENERATING STATION - DESIGN BASES INSPECTION (PROGRAMS) (INSPE CTION REPORT 05000397/2016008)



Revision as of 23:21, 13 July 2019

Design Bases Inspection (Programs) (Inspection Report 05000397/2016008)
ML16148A445
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/27/2016
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Reddemann M
Energy Northwest
References
IR 2016008
Download: ML16148A445 (18)


Text

SUBJECT:

COLUMBIA GENERATING STATION - DESIGN BASES INSPECTION (PROGRAMS) (INSPE CTION REPORT 05000397/2016008)

Dear Mr. Reddemann:

On May 12, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Columbia Generating Station. The NRC inspectors discussed the results of this inspection with you and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.

The NRC inspectors did not identify any findings or violations of more than minor significance.

In accordance with Title 10 of the Code of Federal Regulations 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice and Procedure," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety

Docket No. 50-397 License No. NPF-21

Enclosure: Inspection Report 05000397/2016008 w/Attachment: Supplemental Information

cc: Electronic Distribution for Columbia Generating Station May 27, 2016 Mr. Mark

SUMMARY

IR 05000397/2016008, 05/09/2016 - 05/12/2016; Columbia Generating Station; Baseline Inspection, NRC Inspection Procedure 71111.21N, "Design Bases Inspection (Programs)."

The inspection activities described in this report were performed between May 9, 2016, and May 12, 2016, by three inspectors from the NRC's Region IV office. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process."

No findings were identified.

REPORT DETAILS

REACTOR SAFETY

Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity

1R21 Component Design Basis Inspection

a. Inspection Scope

The inspection team performed a pilot inspection conducted as outlined in NRC Inspection Procedure (IP) 71111.21N, Attachment 1, "Environmental Qualification under 10 CFR 50.49, Programs, Processes, and Procedures." The team assessed Columbia Generating Station's implementation of the environmental qualification program as required by 10 CFR 50.49, "Environmental qualification of electric equipment important to safety for nuclear power plants." The team evaluated whether Columbia Generating Station staff properly maintained the environmental qualification of electrical equipment important to safety throughout plant life, established and maintained required environmental qualification documentation records, and implemented an effective corrective action program to identify and correct environmental qualification-related deficiencies.

The inspection included review of environmental qualification program procedures, component environmental qualification files, environmental qualification test records, equipment maintenance and operating history, maintenance and operating procedures, vendor documents, design documents, and calculations. The team interviewed program owners, engineers, maintenance staff, and warehouse staff. The team performed

in-plant walkdowns (where accessible) to verify equipment was installed as described in Columbia Generating Station's environmental qualification component documentation files and that the components were installed in their tested configuration. Additionally, the team performed in-plant walkdowns to determine whether equipment surrounding the components could fail in a manner that could prevent the safety functions of the components and to verify that components located in areas susceptible to a high energy line break were properly evaluated for operation in a harsh environment. The team reviewed and inspected the storage of replacement parts and associated procurement records to verify environmental qualification parts approved for installation in the plant were properly identified and controlled, and that storage and environmental conditions did not adversely affect the components' qualified lives. Documents reviewed for this inspection are listed in the attachment.

The inspection procedure requires the team to select 6 to 10 components to assess the adequacy of the environmental qualification program. The team selected 9 components for this inspection. Component samples selected for this inspection are listed below:

  • CEP-SPV-1A, Containment Exhaust Pur ge Solenoid Pilot Valve CEP-SPV-1A.
  • E-CONN X102A, SOLISTRAND #34130 Parallel Splice Connectors, for Thermocouple and RTD Penetrations. Off of Mid-Plane in Drywell, Within Primary Containment.

b. Findings

No findings were identified.

OTHER ACTIVITIES

Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity

4OA2 Problem Identification and Resolution

a. Inspection Scope

The team reviewed a sample of issues which were previously identified and entered into the corrective action program. The team reviewed these issues to verify an appropriate threshold for identifying issues and to evaluate the effectiveness of corrective actions. In addition, condition reports written on issues identified during the inspection were reviewed to verify adequate problem identification and incorporation of the problem into the corrective action program. The specific condition reports that were sampled and reviewed by the team are listed in the attachment.

b. Findings

No findings were identified.

4OA6 Meetings, Including Exit

Exit Meeting Summary

On May 12, 2016, the inspectors presented the final inspection results to Mr. M. Reddemann, Chief Executive Officer, and other members of the licensee staff. The licensee acknowledged the issues presented. The licensee confirmed that any proprietary information reviewed by the inspectors had been returned or destroyed.

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

B. Abney, Manager, Operations
V. Bhardwaj, Manager, Planning/Scheduling/Outage
A. Black, General Manager, Emergency Services
D. Brandon, Plant Support Engineering Manager, Engineering
D. Brown, Manager, System Engineering
A. Elsey, EQ Program Owner, Technical Services Engineering
E. Gilmour, Manager, Computer Engineering
K. Gosney, Manager, Security Operations
D. Gregoire, Manager, Regulatory Affairs and Performance Improvement
R. Hammons, Manager, Employee Concerns Program
W. Jaleel, Engineer, Technical Services Engineering
A. Javorik, Vice President, Engineering
D. Kettering, Manager, Design Engineering
R. Meyers, Manager, Operations Training
C. Moon, Manager, Quality
T. Parmelee, Compliance Engineer, Regulatory Affairs
J. Pierce, Recovery Manager, Vice President-Operations
M. Reddemann, Chief Executive Officer
G. Silvan, NSSS Engineer, System Engineering
D. Scott, Engineer, Design Engineering
B. Strecker, Information Services/Telecom
J. Trautvetter, Manager, Maintenance Services
D. Wolfgramm, Compliance Supervisor, Regulatory Affairs
R. Wolfgramm, Supervisor, Technical Services Engineering
J. Zielinski, Engineer, Technical Services Engineering

NRC Personnel

G. Kolcum, Senior Resident Inspector
D. Bradley, Resident Inspector

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Open and

Closed

None

LIST OF DOCUMENTS REVIEWED