IR 05000397/2016406

From kanterella
Jump to navigation Jump to search
NRC Security Inspection Report 05000397/2016406 (Cover Letter Only)
ML16328A321
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/22/2016
From: Mark Haire
Plant Support Branch-1
To: Reddemann M
Energy Northwest
References
IR 2016406
Download: ML16328A321 (4)


Text

ber 22, 2016

SUBJECT:

COLUMBIA GENERATING STATION, NRC SECURITY INSPECTION REPORT 05000397/2016406

Dear Mr. Reddemann:

On October 20, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Columbia Generating Station. The NRC inspectors discussed the results of this inspection with Mr. W. Hettel, Vice President, Operations, and other members of your staff.

The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-397 License No. NPF-21 Enclosure:

Inspection Report 05000397/2016406 w/Attachment: Supplemental Information cc w/o encl: Electronic Distribution