IR 05000397/2016403
| ML16104A086 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 04/12/2016 |
| From: | Mark Haire Plant Support Branch-1 |
| To: | Reddemann M Energy Northwest |
| References | |
| IR 2016403 | |
| Download: ML16104A086 (4) | |
Text
April 12, 2016
SUBJECT:
COLUMBIA GENERATING STATION, NRC SECURITY INSPECTION REPORT 05000397/2016403
Dear Mr. Reddemann:
On March 3, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Columbia Generating Station and the NRC inspector discussed the results of this inspection with Mr. A. Javorik, Vice President, Engineering, and other members of your staff. The NRC inspector documented the results of this inspection in the enclosed inspection report.
The NRC inspector did not identify any findings or violations of more than minor significance.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Mark S. Haire, Chief
Plant Support Branch 1
Division of Reactor Safety
Docket No. 50-397 License No. NPF-21
Enclosure:
Inspection Report 05000397/2016403 w/Attachment: Supplemental Information
cc w/o encl: Electronic Distribution