| title = Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2014006)
| title = Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2014006)
| author name = Pruett T W
| author name = Pruett T
| author affiliation = NRC/RGN-IV/DRP
| author affiliation = NRC/RGN-IV/DRP
| addressee name = Heflin A C
| addressee name = Heflin A
| addressee affiliation = Wolf Creek Nuclear Operating Corp
| addressee affiliation = Wolf Creek Nuclear Operating Corp
| docket = 05000482
| docket = 05000482
| license number =  
| license number =  
| contact person = O'Keefe N F
| contact person = O'Keefe N
| document report number = IR-2014-006
| document report number = IR-2014-006
| document type = Inspection Plan, Letter
| document type = Inspection Plan, Letter
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011
{{#Wiki_filter:September 2, 2014
-4511 September 2, 2014 Adam C. Heflin, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR WOLF CREEK GENERATING STATION (REPORT 0500482/2014006)
 
==SUBJECT:==
MID-CYCLE ASSESSMENT LETTER FOR WOLF CREEK GENERATING STATION (REPORT 0500482/2014006)


==Dear Mr. Heflin:==
==Dear Mr. Heflin:==
Line 29: Line 31:
's Reactor Oversight Process (ROP) Action Matrix because of one Greater-than-Green Security Cornerstone input and one White finding in the Emergency Preparedness Cornerstone. The Security issue was described in Inspection Report 05000482/2014405 (ADAMS ML14069A025)
's Reactor Oversight Process (ROP) Action Matrix because of one Greater-than-Green Security Cornerstone input and one White finding in the Emergency Preparedness Cornerstone. The Security issue was described in Inspection Report 05000482/2014405 (ADAMS ML14069A025)
, and the White Emergency Preparedness finding , associated with a failure to maintain adequate methods for assessing the potential consequences of a radiological emergency condition
, and the White Emergency Preparedness finding , associated with a failure to maintain adequate methods for assessing the potential consequences of a radiological emergency condition
, was described in Inspection Report 05000482/2014503 (ADAMS ML14182A628). The NRC issued a Follow
, was described in Inspection Report 05000482/2014503 (ADAMS ML14182A628). The NRC issued a Follow-Up Assessment letter dated March 26, 2014, (ADAMS ML14085A376)
-Up Assessment letter dated March 26, 2014, (ADAMS ML14085A376)
to inform you of your movement from the Licensee Response Column to the Regulatory Response column of the NRC's Action Matrix
to inform you of your movement from the Licensee Response Column to the Regulatory Response column of the NRC's Action Matrix
.
.
In addition to ROP baseline inspections, the NRC plans to conduct supplemental inspection s in accordance with Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," when you inform us of your readiness for these inspections. The objectives of this inspection procedure are to provide assurance that, for risk-significant performance issues: (1) the root causes and contributing causes are understood; (2) the extent of condition and extent of cause are identified; and (3) the licensee's corrective actions are sufficient to address the root and contributing causes and prevent recurrence. These supplemental inspections will separately review your actions to address the Greater-than-Green Security Cornerstone input and White finding in the Emergency Preparedness Cornerstone. T he NR C a l so issued a C h illi ng E f f e c t Le tt e r (C E L) (ADA M S M L1323 3 A 2 08) t o W o l f C r e e k N uc l ear O p e r a t i n g C o r p o r a t i on on A u g u s t 1 9 , 2 0 1 3. T he CE L w as issued because t he Occup a t i onal S a f e t y and H ea l t h A d mini s tr a t i on (OSHA) had issued a f i n d i n g o f d i s c r i m i n a t i on f o r r a i s i n g s a f e t y conc e r n s a g a i nst a f o r m e r e m p l o y ee of an e n g i n e e r i n g c o n tr a c t or e m p l o y ed by W o l f C r e e k N uc l e a r O p e r a t i n g C o r p or a t ion, and d ue t o t he N R C i de n t i f y i ng t h a t a c h ill ed w o r k e n v i r o n ment e x i s t ed w i t h i n y our f ac ili t y's Q uali t y A ssu rance Gr ou p. Issua n ce o f a CE L m e e t s t he NR C c r i t e r i a i n Insp e c t i on M anu a l C ha p t er (I M C) 0305, "O p e r a t i n g R eac tor Asses s m ent P r o g r a m ," f o r t he i de n t i f i ca t i on o f a c r os s-c u t ti n g t h e m e i n t he a r ea o f s a f e t y consc i ous w o r k e n v i r o n m ent (S C W E). T he NRC has a ssessed y our 3 0-day and 6-m o n t h respo nses t o t he CEL, and conduc t ed a publi c m e e t i n g i n t he R e g i on I V o ff i ce on Jan u a r y 22, 201 4 , t o d iscuss t he a c tions that y ou a r e t a k i n g t o ad d r e s s t he w o r k i n g e n v i r o n m e nt a t y our f ac ili t y. T he NRC has dec ided no t t o open a su b s t a n t i v e c r os s-cu tt i n g issue i n t he a r ea o f S C W E a t t h i s t i me because t he NR C s t a f f d oes not h a v e a conc e r n w i t h y our ac t i o n s. T h i s t h e m e w ill con t i nue t o be r e v i e w ed d u r i ng t he n e x t p er f o rmance as sess m e n t a s w e co n t i n u e t o m o ni t o r your s t a f f's a c t i ons t o en s u r e W o l f C r e e k G en e r a t i n g S t a t i on i s a w o r k p lace t h a t f o s t e r s an e n v i r o n ment w h e r e e m p l o y ees f eel f r e e , and a r e enco u r a ged, t o r a i se s a f e t y conce r n s. The NRC will conduct a follow
In addition to ROP baseline inspections, the NRC plans to conduct supplemental inspection s in accordance with Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," when you inform us of your readiness for these inspections. The objectives of this inspection procedure are to provide assurance that, for risk-significant performance issues: (1) the root causes and contributing causes are understood; (2) the extent of condition and extent of cause are identified; and (3) the licensee's corrective actions are sufficient to address the root and contributing causes and prevent recurrence. These supplemental inspections will separately review your actions to address the Greater-than-Green Security Cornerstone input and White finding in the Emergency Preparedness Cornerstone. T he NR C a l so issued a C h illi ng E f f e c t Le tt e r (C E L) (ADA M S M L1323 3 A 2 08) t o W o l f C r e e k N uc l ear O p e r a t i n g C o r p o r a t i on on A u g u s t 1 9 , 2 0 1 3. T he CE L w as issued because t he Occup a t i onal S a f e t y and H ea l t h A d mini s tr a t i on (OSHA) had issued a f i n d i n g o f d i s c r i m i n a t i on f o r r a i s i n g s a f e t y conc e r n s a g a i nst a f o r m e r e m p l o y ee of an e n g i n e e r i n g c o n tr a c t or e m p l o y ed by W o l f C r e e k N uc l e a r O p e r a t i n g C o r p or a t ion, and d ue t o t he N R C i de n t i f y i ng t h a t a c h ill ed w o r k e n v i r o n ment e x i s t ed w i t h i n y our f ac ili t y's Q uali t y A ssu rance Gr ou p. Issua n ce o f a CE L m e e t s t he NR C c r i t e r i a i n Insp e c t i on M anu a l C ha p t er (I M C) 0305, "O p e r a t i n g R eac tor Asses s m ent P r o g r a m ," f o r t he i de n t i f i ca t i on o f a c r os s-c u t ti n g t h e m e i n t he a r ea o f s a f e t y consc i ous w o r k e n v i r o n m ent (S C W E). T he NRC has a ssessed y our 3 0-day and 6-m o n t h respo nses t o t he CEL, and conduc t ed a publi c m e e t i n g i n t he R e g i on I V o ff i ce on Jan u a r y 22, 201 4 , t o d iscuss t he a c tions that y ou a r e t a k i n g t o ad d r e s s t he w o r k i n g e n v i r o n m e nt a t y our f ac ili t y. T he NRC has dec ided no t t o open a su b s t a n t i v e c r os s-cu tt i n g issue i n t he a r ea o f S C W E a t t h i s t i me because t he NR C s t a f f d oes not h a v e a conc e r n w i t h y our ac t i o n s. T h i s t h e m e w ill con t i nue t o be r e v i e w ed d u r i ng t he n e x t p er f o rmance as sess m e n t a s w e co n t i n u e t o m o ni t o r your s t a f f's a c t i ons t o en s u r e W o l f C r e e k G en e r a t i n g S t a t i on i s a w o r k p lace t h a t f o s t e r s an e n v i r o n ment w h e r e e m p l o y ees f eel f r e e , and a r e enco u r a ged, t o r a i se s a f e t y conce r n s. The NRC will conduct a follow-up inspection to review your actions to address the CEL when you inform us of your readiness for inspection.
-up inspection to review your actions to address the CEL when you inform us of your readiness for inspection.


As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspect s were revised. All cross
As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspect s were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310. Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.
-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310. Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross
-reference in IMC 0310 during the mid
-cycle assessment review and evaluated for cross
-cutting themes and potential substantive cross
-cutting issues in accordance with IMC 0305.


T he enc losed insp e c ti on p l an li s t s t he i nspec t i ons s c hed ul ed t h r o u g h December 31, 2 01 5. R o u t i ne inspec t i ons p e r f o r m ed b y r es i de n t insp e c t o r s a r e not i nc l uded i n t he i ns p e c t i on p lan. The inspec t ions sched ul ed t o be cond u c t ed d u r i n g t he last n i ne m o n t hs a r e t e n t a t i v e and m ay be r e v ised based on t he r e s u l t s o f t h e end-of-c y c l e p e r f o rmance r e v i e w. T he N R C p r o v i des t he inspec t i on p l an t o a l l ow f or t he reso l u t i on o f any scheduli ng co n f li c t s and p e rsonnel a v a il abili t y issues. T he NR C w ill con tact y our s t a f f as soon a s poss i b l e t o d iscuss c ha n g es t o t he inspec t i on p l an sho ul d c i r cu m s tances w a rr ant a n y cha n g e s. T h i s insp e c t i o n p l an does not i nc l ude secu r i t y r e l a t ed inspec t ions, w h i ch w ill be sent v i a sep a r a t e , n o n-p ubli c l y a v a il a bl e co rrespond e n c e. In response to the accident at Fukushima, the Commission issued Order EA
T he enc losed insp e c ti on p l an li s t s t he i nspec t i ons s c hed ul ed t h r o u g h December 31, 2 01 5. R o u t i ne inspec t i ons p e r f o r m ed b y r es i de n t insp e c t o r s a r e not i nc l uded i n t he i ns p e c t i on p lan. The inspec t ions sched ul ed t o be cond u c t ed d u r i n g t he last n i ne m o n t hs a r e t e n t a t i v e and m ay be r e v ised based on t he r e s u l t s o f t h e end-of-c y c l e p e r f o rmance r e v i e w. T he N R C p r o v i des t he inspec t i on p l an t o a l l ow f or t he reso l u t i on o f any scheduli ng co n f li c t s and p e rsonnel a v a il abili t y issues. T he NR C w ill con tact y our s t a f f as soon a s poss i b l e t o d iscuss c ha n g es t o t he inspec t i on p l an sho ul d c i r cu m s tances w a rr ant a n y cha n g e s. T h i s insp e c t i o n p l an does not i nc l ude secu r i t y r e l a t ed inspec t ions, w h i ch w ill be sent v i a sep a r a t e , n o n-p ubli c l y a v a il a bl e co rrespond e n c e. In response to the accident at Fukushima, the Commission issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," which requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. This audit includes an onsite component in order for the NRC to evaluate licensee plans for complying with the Orders, as described in site-specific submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site.
-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond
-Design-Basis External Events," which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond
-design-basis external event. Additionally, the Commission issued Order EA
-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," which requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. This audit includes an onsite component in order for the NRC to evaluate licensee plans for complying with the Orders, as described in site-specific submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site.


The date for the onsite component at your site is being coordinated with your staff. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.
The date for the onsite component at your site is being coordinated with your staff. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.
Line 85: Line 76:
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov) ROPassessment Resource@nrc.gov ROPreports@nrc.gov OEMail Resource@nrc.gov Electronic Distribution for Wolf Creek Generating Station
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov) ROPassessment Resource@nrc.gov ROPreports@nrc.gov OEMail Resource@nrc.gov Electronic Distribution for Wolf Creek Generating Station


Page 1 of 2 08/22/2014 14:03:38 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteWolf CreekInspection / Activity Plan 09/01/2014
Page 1 of 2 08/22/2014 14:03:38 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteWolf CreekInspection / Activity Plan 09/01/2014-12/31/2015EXAM-INITIAL OPERATOR EXAM 5 1 INITIAL EXAM WC(11/2015)
-12/31/2015EXAM-INITIAL OPERATOR EXAM 5 1 INITIAL EXAM WC(11/2015)
X02549 10/19/2015 10/23/2015 1 INITIAL EXAM WC(11/2015)
X02549 10/19/2015 10/23/2015 1 INITIAL EXAM WC(11/2015)
X0254911/16/201511/20/2015 INSP-BIENNIAL REQUAL INSPECTION 3 1 IP Licensed Operator Requalification Program7111111B 10/06/2014 10/10/2014 EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION 4 1 IP Fire Protection [Triennial]7111105T 10/20/2014 10/24/2014 1 IP Fire Protection [Triennial]7111105T11/03/201411/07/2014 EP-1-EP PERFORMANCE INDICATORS 1 1 IP71151-EP0111/17/201411/21/2014 1 IP71151-EP0211/17/201411/21/2014 1 IP71151-EP0311/17/201411/21/2014 EP-2-EP PROGRAM INSPECTION 1 1 IP A lert and Notification System Testing711140211/17/201411/21/2014 1 IP Emergency Preparedness Organization Staffing and Augmentation System711140311/17/201411/21/2014 1 IP Emergency Action Level and Emergency Plan Changes711140411/17/201411/21/2014 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies711140511/17/201411/21/2014 RS 13 PI-RADIATION SAFETY 2 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/02/2015 03/06/2015 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/02/2015 03/06/2015 1 IP71151-OR01 03/02/2015 03/06/2015 1 IP71151-PR01 03/02/2015 03/06/201571111.08-INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 03/09/2015 03/20/2015 RS 24-RADIATION SAFETY 2 1 IP Occupational ALARA Planning and Controls71124.02 06/22/2015 06/26/2015 1 IP Occupational Dose Assessment71124.04 06/22/2015 06/26/2015 EB1-17T-WC PERMANENT PLANT MODS & 50.59 1 1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 07/06/2015 07/17/2015 EP-2-HAB EXERCISE INSPECTION 5 1 IP Emergency Action Level and Emergency Plan Changes711140411/16/201511/20/2015 1 IP Exercise Evaluation - Hostile Action (HA) Event711140711/16/201511/20/2015 EP-3-EP PERFORMANCE INDICATORS 2 1 IP71151-EP0111/16/201511/20/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
X0254911/16/201511/20/2015 INSP-BIENNIAL REQUAL INSPECTION 3 1 IP Licensed Operator Requalification Program7111111B 10/06/2014 10/10/2014 EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION 4 1 IP Fire Protection [Triennial]7111105T 10/20/2014 10/24/2014 1 IP Fire Protection [Triennial]7111105T11/03/201411/07/2014 EP-1-EP PERFORMANCE INDICATORS 1 1 IP71151-EP0111/17/201411/21/2014 1 IP71151-EP0211/17/201411/21/2014 1 IP71151-EP0311/17/201411/21/2014 EP-2-EP PROGRAM INSPECTION 1 1 IP A lert and Notification System Testing711140211/17/201411/21/2014 1 IP Emergency Preparedness Organization Staffing and Augmentation System711140311/17/201411/21/2014 1 IP Emergency Action Level and Emergency Plan Changes711140411/17/201411/21/2014 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies711140511/17/201411/21/2014 RS 13 PI-RADIATION SAFETY 2 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/02/2015 03/06/2015 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/02/2015 03/06/2015 1 IP71151-OR01 03/02/2015 03/06/2015 1 IP71151-PR01 03/02/2015 03/06/201571111.08-INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 03/09/2015 03/20/2015 RS 24-RADIATION SAFETY 2 1 IP Occupational ALARA Planning and Controls71124.02 06/22/2015 06/26/2015 1 IP Occupational Dose Assessment71124.04 06/22/2015 06/26/2015 EB1-17T-WC PERMANENT PLANT MODS & 50.59 1 1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 07/06/2015 07/17/2015 EP-2-HAB EXERCISE INSPECTION 5 1 IP Emergency Action Level and Emergency Plan Changes711140411/16/201511/20/2015 1 IP Exercise Evaluation - Hostile Action (HA) Event711140711/16/201511/20/2015 EP-3-EP PERFORMANCE INDICATORS 2 1 IP71151-EP0111/16/201511/20/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.


Page 2 of 2 08/22/2014 14:03:38 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteWolf CreekInspection / Activity Plan 09/01/2014
Page 2 of 2 08/22/2014 14:03:38 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteWolf CreekInspection / Activity Plan 09/01/2014-12/31/2015 EP-3-EP PERFORMANCE INDICATORS 2 1 IP71151-EP0211/16/201511/20/2015 1 IP71151-EP0311/16/201511/20/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
-12/31/2015 EP-3-EP PERFORMANCE INDICATORS 2 1 IP71151-EP0211/16/201511/20/2015 1 IP71151-EP0311/16/201511/20/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}
}}

Revision as of 08:58, 21 June 2019

Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2014006)
ML14239A622
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/02/2014
From: Troy Pruett
NRC/RGN-IV/DRP
To: Heflin A
Wolf Creek
O'Keefe N
References
IR-2014-006
Download: ML14239A622 (7)


Text

September 2, 2014

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR WOLF CREEK GENERATING STATION (REPORT 0500482/2014006)

Dear Mr. Heflin:

O n August 1 2 , 20 14 , t h e NRC co m p l e t ed i t s mid-c y c l e p e r f o rm a n ce r e v i e w of W o l f C r e e k G en e r a t i n g St a t i o n. T he NR C r e v i e w ed t he m o s t recent q u a r t e r l y p e r f o rm a n ce i n di ca t o r s (P Is) i n ad di t i on t o inspe c t i on resu l t s and e n f o r ce m e n t ac t i ons fr o m July 1, 2 013, t h r o u gh June 30, 2014.

T h i s l e tt e r i n f o r m s y ou o f t h e NRC's ass e s s ment o f W o l f C r eek G en e r a t i n g St a t i on d u r i n g t h i s p e r i od and i t s p l a n s f o r f u t u r e insp e c t i o n s a t t hat f ac ili t y.

The NRC determined that overall, W o l f C r e e k G en e r a t i n g St a t i o n was operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at W o l f C r e e k G en e r a t i n g S t a t i on during the most recent quarter was within the Regulatory Response Column of the NRC

's Reactor Oversight Process (ROP) Action Matrix because of one Greater-than-Green Security Cornerstone input and one White finding in the Emergency Preparedness Cornerstone. The Security issue was described in Inspection Report 05000482/2014405 (ADAMS ML14069A025)

, and the White Emergency Preparedness finding , associated with a failure to maintain adequate methods for assessing the potential consequences of a radiological emergency condition

, was described in Inspection Report 05000482/2014503 (ADAMS ML14182A628). The NRC issued a Follow-Up Assessment letter dated March 26, 2014, (ADAMS ML14085A376)

to inform you of your movement from the Licensee Response Column to the Regulatory Response column of the NRC's Action Matrix

.

In addition to ROP baseline inspections, the NRC plans to conduct supplemental inspection s in accordance with Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," when you inform us of your readiness for these inspections. The objectives of this inspection procedure are to provide assurance that, for risk-significant performance issues: (1) the root causes and contributing causes are understood; (2) the extent of condition and extent of cause are identified; and (3) the licensee's corrective actions are sufficient to address the root and contributing causes and prevent recurrence. These supplemental inspections will separately review your actions to address the Greater-than-Green Security Cornerstone input and White finding in the Emergency Preparedness Cornerstone. T he NR C a l so issued a C h illi ng E f f e c t Le tt e r (C E L) (ADA M S M L1323 3 A 2 08) t o W o l f C r e e k N uc l ear O p e r a t i n g C o r p o r a t i on on A u g u s t 1 9 , 2 0 1 3. T he CE L w as issued because t he Occup a t i onal S a f e t y and H ea l t h A d mini s tr a t i on (OSHA) had issued a f i n d i n g o f d i s c r i m i n a t i on f o r r a i s i n g s a f e t y conc e r n s a g a i nst a f o r m e r e m p l o y ee of an e n g i n e e r i n g c o n tr a c t or e m p l o y ed by W o l f C r e e k N uc l e a r O p e r a t i n g C o r p or a t ion, and d ue t o t he N R C i de n t i f y i ng t h a t a c h ill ed w o r k e n v i r o n ment e x i s t ed w i t h i n y our f ac ili t y's Q uali t y A ssu rance Gr ou p. Issua n ce o f a CE L m e e t s t he NR C c r i t e r i a i n Insp e c t i on M anu a l C ha p t er (I M C) 0305, "O p e r a t i n g R eac tor Asses s m ent P r o g r a m ," f o r t he i de n t i f i ca t i on o f a c r os s-c u t ti n g t h e m e i n t he a r ea o f s a f e t y consc i ous w o r k e n v i r o n m ent (S C W E). T he NRC has a ssessed y our 3 0-day and 6-m o n t h respo nses t o t he CEL, and conduc t ed a publi c m e e t i n g i n t he R e g i on I V o ff i ce on Jan u a r y 22, 201 4 , t o d iscuss t he a c tions that y ou a r e t a k i n g t o ad d r e s s t he w o r k i n g e n v i r o n m e nt a t y our f ac ili t y. T he NRC has dec ided no t t o open a su b s t a n t i v e c r os s-cu tt i n g issue i n t he a r ea o f S C W E a t t h i s t i me because t he NR C s t a f f d oes not h a v e a conc e r n w i t h y our ac t i o n s. T h i s t h e m e w ill con t i nue t o be r e v i e w ed d u r i ng t he n e x t p er f o rmance as sess m e n t a s w e co n t i n u e t o m o ni t o r your s t a f f's a c t i ons t o en s u r e W o l f C r e e k G en e r a t i n g S t a t i on i s a w o r k p lace t h a t f o s t e r s an e n v i r o n ment w h e r e e m p l o y ees f eel f r e e , and a r e enco u r a ged, t o r a i se s a f e t y conce r n s. The NRC will conduct a follow-up inspection to review your actions to address the CEL when you inform us of your readiness for inspection.

As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspect s were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310. Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.

T he enc losed insp e c ti on p l an li s t s t he i nspec t i ons s c hed ul ed t h r o u g h December 31, 2 01 5. R o u t i ne inspec t i ons p e r f o r m ed b y r es i de n t insp e c t o r s a r e not i nc l uded i n t he i ns p e c t i on p lan. The inspec t ions sched ul ed t o be cond u c t ed d u r i n g t he last n i ne m o n t hs a r e t e n t a t i v e and m ay be r e v ised based on t he r e s u l t s o f t h e end-of-c y c l e p e r f o rmance r e v i e w. T he N R C p r o v i des t he inspec t i on p l an t o a l l ow f or t he reso l u t i on o f any scheduli ng co n f li c t s and p e rsonnel a v a il abili t y issues. T he NR C w ill con tact y our s t a f f as soon a s poss i b l e t o d iscuss c ha n g es t o t he inspec t i on p l an sho ul d c i r cu m s tances w a rr ant a n y cha n g e s. T h i s insp e c t i o n p l an does not i nc l ude secu r i t y r e l a t ed inspec t ions, w h i ch w ill be sent v i a sep a r a t e , n o n-p ubli c l y a v a il a bl e co rrespond e n c e. In response to the accident at Fukushima, the Commission issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," which requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. This audit includes an onsite component in order for the NRC to evaluate licensee plans for complying with the Orders, as described in site-specific submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site.

The date for the onsite component at your site is being coordinated with your staff. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.

I n acc o r danc e w i t h 10 CFR 2.390 o f t he NRC's R ul es o f P r ac t i c e , a copy o f t h i s l e tter w i ll be a v a il a bl e e l ec tr o ni ca ll y f o r publi c insp e c t i on i n t he NR C P ubli c Docu m e n t R oom o r f r o m t he P ubli c l y A v a il a bl e Reco r ds (PAR S) co m pon e n t o f NRC's doc u m en t s y s t e m (A DA M S). ADA M S i s access i b l e f r om t he N R C W e b s i t e a t h tt p://w w w.n r c.g o v/r ead i ng-r m/a d a m s.h tm l (t he P ubli c El ec tr o ni c R ea d i n g R o o m). Please co n t a c t Mr. Neil F. O'Keefe a t 8 1 7-2 0 0-1141 w i t h any q u e s t i ons y ou m ay h a v e r e g a r d i n g t h i s l e t t e r.

Sincerely,

/RA/

Troy W. Pruett, Acting Director Di v i s i on of R eac t o r P r o j e c t s Docket No.

50-482 License No.
NPF-42 Enclosure: Wolf Creek Generating Station Inspection/Activity Plan

SUNSI Review By: NOKeefe ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive OFFICE RIV/BC/DRP RIV/D/DRS RIV/D/DRP NAME OKeefe/dll AVegel TPruett SIGNATURE /RA/ /RA/VGaddy for /RA/ DATE 8/21/14 8/25/14 8/25/14 Letter to Adam from Troy W. Pruett dated September 2, 2014 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2014006) DISTRIBUTION

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Steven.Reynolds@nrc.gov)

Acting DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Michael.Hay@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov

) Senior Resident Inspector (Charles.Peabody@nrc.gov) Resident Inspector (Raja.Stroble@nrc.gov) Administrative Assistant (Carey.Spoon@nrc.gov) Branch Chief (Neil.O'Keefe@nrc.gov)

Senior Project Engineer (David.Proulx@nrc.gov)

Project Engineer, (Fabian.Thomas@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

RIV State Liaison Officer (Bill.Maier@nrc.gov)

Project Manager (Fred.Lyon@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

R4DRPBC@nrc.gov R4DRSBC@nrc.gov Director, DIRS, NRR (Scott.Morris@nrc.gov)

Deputy Director, DIRS, NRR (Allen.Howe@nrc.gov)

Acting Director, DORL, NRR (Louise.Lund@nrc.gov

) Acting Deputy Director, DORL (Michael.Markley@nrc.gov)

Director, NSIR/DPR (Rob.Lewis@nrc.gov)

Chief, PLB IV, DORL, NRR (Eric.Oesterle@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (Anthony.Bowers@nrc.gov) ROPassessment Resource@nrc.gov ROPreports@nrc.gov OEMail Resource@nrc.gov Electronic Distribution for Wolf Creek Generating Station

Page 1 of 2 08/22/2014 14:03:38 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteWolf CreekInspection / Activity Plan 09/01/2014-12/31/2015EXAM-INITIAL OPERATOR EXAM 5 1 INITIAL EXAM WC(11/2015)

X02549 10/19/2015 10/23/2015 1 INITIAL EXAM WC(11/2015)

X0254911/16/201511/20/2015 INSP-BIENNIAL REQUAL INSPECTION 3 1 IP Licensed Operator Requalification Program7111111B 10/06/2014 10/10/2014 EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION 4 1 IP Fire Protection [Triennial]7111105T 10/20/2014 10/24/2014 1 IP Fire Protection [Triennial]7111105T11/03/201411/07/2014 EP-1-EP PERFORMANCE INDICATORS 1 1 IP71151-EP0111/17/201411/21/2014 1 IP71151-EP0211/17/201411/21/2014 1 IP71151-EP0311/17/201411/21/2014 EP-2-EP PROGRAM INSPECTION 1 1 IP A lert and Notification System Testing711140211/17/201411/21/2014 1 IP Emergency Preparedness Organization Staffing and Augmentation System711140311/17/201411/21/2014 1 IP Emergency Action Level and Emergency Plan Changes711140411/17/201411/21/2014 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies711140511/17/201411/21/2014 RS 13 PI-RADIATION SAFETY 2 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/02/2015 03/06/2015 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/02/2015 03/06/2015 1 IP71151-OR01 03/02/2015 03/06/2015 1 IP71151-PR01 03/02/2015 03/06/201571111.08-INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 03/09/2015 03/20/2015 RS 24-RADIATION SAFETY 2 1 IP Occupational ALARA Planning and Controls71124.02 06/22/2015 06/26/2015 1 IP Occupational Dose Assessment71124.04 06/22/2015 06/26/2015 EB1-17T-WC PERMANENT PLANT MODS & 50.59 1 1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 07/06/2015 07/17/2015 EP-2-HAB EXERCISE INSPECTION 5 1 IP Emergency Action Level and Emergency Plan Changes711140411/16/201511/20/2015 1 IP Exercise Evaluation - Hostile Action (HA) Event711140711/16/201511/20/2015 EP-3-EP PERFORMANCE INDICATORS 2 1 IP71151-EP0111/16/201511/20/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 2 08/22/2014 14:03:38 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteWolf CreekInspection / Activity Plan 09/01/2014-12/31/2015 EP-3-EP PERFORMANCE INDICATORS 2 1 IP71151-EP0211/16/201511/20/2015 1 IP71151-EP0311/16/201511/20/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.