ML18153D063: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 07/10/1992
| issue date = 07/10/1992
| title = Informs That Delay in Mailing Groundwater Withdrawal Rept for First Quarter 1992 Due to Delays Experienced in Internal Routing Procedures for Such Correspondence,In Response to 920630 Ltr.Rept Sent on 920505 Instead of Due Date 920420
| title = Informs That Delay in Mailing Groundwater Withdrawal Rept for First Quarter 1992 Due to Delays Experienced in Internal Routing Procedures for Such Correspondence,In Response to 920630 Ltr.Rept Sent on 920505 Instead of Due Date 920420
| author name = MARSHALL B M
| author name = Marshall B
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| addressee name = SINHA B N
| addressee name = Sinha B
| addressee affiliation = VIRGINIA, COMMONWEALTH OF
| addressee affiliation = VIRGINIA, COMMONWEALTH OF
| docket = 05000280, 05000281
| docket = 05000280, 05000281

Revision as of 03:34, 17 June 2019

Informs That Delay in Mailing Groundwater Withdrawal Rept for First Quarter 1992 Due to Delays Experienced in Internal Routing Procedures for Such Correspondence,In Response to 920630 Ltr.Rept Sent on 920505 Instead of Due Date 920420
ML18153D063
Person / Time
Site: Surry  Dominion icon.png
Issue date: 07/10/1992
From: Marshall B
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Sinha B
VIRGINIA, COMMONWEALTH OF
References
NUDOCS 9207200209
Download: ML18153D063 (1)


Text

,---~ ----------~ -~ -------~---... July 10, 1992 B. N. Sinha, Ph.D. Water Resources Development Piedmont Regional Office Virginia water Control Board P. o. Box 11143 Richmond, VA 23230 e Innsbrook Technical Center 5000 Dominion Boulevard Glen Alien, Virginia 23060

  • VIRGINIA POWER RE: SURRY POWER STATION -GROUNDWATER CERTIFICATE
  1. SE-016B

Dear Dr. Sinha:

This is in response to your letter of June 30, 1992, concerning late submittal of the groundwater withdrawal report for the first quarter of 1992. The subject report was due April 20, 1992, but was sent to you on May 5, 1992. The delay in mailing the report was due to delays experienced in our* internal routing procedures for such correspondence, and simple oversight._

At that time, the reports were being forwarded from the station to our offices here in Richmond to be subsequently mailed to you. Since then, the process has been changed so that future reports will be sent in directly from the Surry Power Station to avoid such delays. Should you need additional information or have any questions about this matter, please contact Daniel James at (804) 273-2996.

Sincerely, ~.bL B. M. Marshall, P.E. Manager Water Quality _ cc: U.S. Nuclear Regulatory Commission Attn: Document Control Desk Docket 50-280/50-281 Washington, DC 20555 U.S. Nuclear Regulatory Commission Docket 50-280/50-281 101 Marietta st., N.W. Suite 2900 Atlanta, GA 30323 / NRC Senior Resident Inspector Docket 50-280/50-281 Surry Power Station (~, ;':/. *_

  • 9207200209 920710-, -'c (.,, '--'1 *: PDR ADOCK '05000280 I I R PDR