Forwards Joint Permit Application for Activities in Waters of Commonwealth of VA to Undertake Maint Dredging of Existing Intake Channel at Facilities.Dredging Operation Will Deposit Soils in Established Upland Disposal Site
ML18153D133
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/11/1992
From: Marshall B
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Frye C
VIRGINIA, COMMONWEALTH OF
References
NUDOCS 9209250009
Download: ML18153D133 (11)


Text

Innsbrook Technical Center e

5000 Dominion Boulevard

'*~*

.. ,i' Glen Allen, Virginia 23060

'{

CERT:IF:IED MA:IL RETURN RECEIPT REQUESTED September 11, 1992 VIRGINIA POWER Mr. Chris Frye Environmental Engineer Virginia Marine Resources Commission 2600 Washington Avenue P. o. Box 756 Newport News, VA 23607-0765 RE: SURRY POWER STATION - PROPOSED DREDGING

Dear Mr. Frye:

In order to ensure continued access to deep water in the James River, Virginia Power plans to undertake maintenance dredging of the existing intake channel at the Surry Power station. The proposed dredging is to remove siltation from the channel to maintain previously permitted dimensions. The hydraulic dredging operation will deposit spoils into an established upland disposal site on the power station's property.

Enclosed is a Joint Permit Application for the proposed dredging project. This proposal is for the sanie as-needed maintenance dredging for which a permit was issued April 25, 1986. That permit expired March 31, 1991.

Contacts at the State Water Control Board have indicated that maintenance dredging may potentially be permitted for a longer term basis than the 5 years of our previous permit. If so, we request that any requisite permit(s) issued cover as long a time frame as allowable; the need for periodic maintenance dredging at the Surry Power Station intake channel will continue. for the foreseeable future.

Recent soundings of the channel indicate that maintenance <;lredging is needed in the immediate future. Surry-Power Station requires barge access through the channel to ensure availability of spent fuel casks for the independent spent fuel storage installation.

Therefore, we request that any required actions by the various permitting agencies be as expeditious .as possible and that any restrictions placed on this activity be as permissive as possible so that the work may proceed directly to provide continued support of cask shipments.

  • Notifications of the proposed activity,
  • and the acknowledgement forms, have been sent to the adjacent property owners.
  • Their responses will be forwarded to you upon receipt.

e<ll \

1 0r{

  • 9209250009 920911 PDR ADOCK 05000280

-~

(;uv I

. , \ ___ t:> _ . PDR ;1 .

- -~- *--,~ - -.... -. - "'

Mr. Chris Frye September 11, 1992

  • page 2 Should you need additional information or have any questions, please contact Daniel James at (804) 273-2996.

SinccJ~J.~

B. M. Marshall, P.E.

Manager water Quality

Enclosures:

Permit Application Form cc: Cw/attachments)

U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, N.W.

Suite 2900

.Atlanta, GA 30323 Re: Surry Units 1 & 2 Docket No. 50-280/50-281 License Nos. DPR-32/DPR-37 u.s~ Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Re: Surry Units 1 & 2 Docket No. 50-280/50-281 License Nos. DPR-32/DPR-37 Mr. M. w. Branch NRC Senior Resident Inspector Surry Power Station

e BASIC APPLICATION FORM JOINT PERMIT APPLICATION FOR ACTIVITIES IN WATERS OF THE Cotf'IONWEALTH OF VIRGINIA Before you complete this application please refer to the definitions on pages 5-8 and explanations on pages IJ*-11. PLEAm:: ANSWEW ALL QUE-.SlIONS ON THI:: l:3ASIC APPLICATION FOWM.

IF A QUESTION DOES NOT APPLY TO YOUR PROJECr, WRil"E NOT APPLICABLE (NIA) IN THAT BLOCK.

PLEASE PWINT OW TYPI::. USE BLACK INK (BLUE INK OR PENCIL ARE NOT EASILY REPRODUCIBLE j THEREFORE, NEITHER WILL BE ACCEPTED). If additional space is needed, attach extra 8--1/l" X 11" sheets of paper .

1. Applicant's (Property owners) name 1*elephone number:

and complete addre~s: Home ( A/C ) ..:.:N:.L./.:::A_ _ _ _ _ _ _ _ _

Mr. B. M. Marshall Work (A/C 804) ___ -f_n_-299=0__________

Manager, Water Quality Department Virginia Power P. O. Box 26666 Richmond, VA 23261

2. Aut~Jrizod agent's name relephone number:

and comp let,~ address (if applicable): Home (A/C ) ___________ ..... N/A _______ ..__ _

Work (A/C ) ..................N/A ______________ _

N/A 3***:... **i)*~*~*t:*;*~*,;*~-~~-~~-:~ -~:*:~*}*~*(;*~*~;:* * -~~~-~:~~:~~;~*;*~-r*:;;:*;*,~;-~ii} ~-e*:~*~:,*~- {f ~~-}*:;*J~ ~-~:~-~- -~ ~ *:*:~1*~*:*=~:-:-*~~o-~~:*;~*s*~*e r is c,mtractor's nc:kno1.Jl(,d<~(~11u.int 1-cwm un pdqe Zl with your application.

Contrclclor's nam0 and complrite address: Telephone number:

Home (A/C ) ........--*-***"*** N}A_ ..... - ... --..*-*-*--*

Work ( A/C ) ........-.--....--....-***--..-*-*---*-.. __

FOR .... <>FF_TCE . . USF . . ONLY Da Lt) S t;..1mp Application No. -----*---*--- _

NAO For*m l06~,, Re11 lO Mrly oo:-i/VMRC JO-* ]00

\ I

e BASIC APPLICATION FORM (Continue~

14

4. U s*t"'"'tt~e nanll',. addn~ss, and td,~i>h(Hll' number of the n~~*spapl)r having general circulation in Lhe ~rca of the project. Failure to complete this question may delay Local and Std le proc,~s sing.

Name 1) Daily ... Pres.s ...........-...___............-............-............... __ .........-_........ _ 2} Smithfield Times Address .. 7 505 _.Warwick .... Boulevard...........-.....-.. -....- ......... _______. 288 Main Street

. New1?.,or.t_ News ..._. VA ....... 23607.......................-.. - ....... _. -*- Smithfield, VA 23430 Telephonl1. # _(..804) ... 357-413L.......-.... _ ........... *.. (804) 357-3288

5. Have you discussed the project with any representative(s) of Local, State, o;-Fe.deral regulatory ag<mcies? rn YES D NO information below concerning the on-*si te pre-..appl i.cation meeting.

If your answer is "YES"' complete the Name of Representative(s): 1_..... Chris . ...FIE .... 2 .... Chet._Bigelow 3 ...... Jean Gre_gm _ .. _, __ _

  • Name of Agency: 1.. VMRC............_ . _.._...... 2 ..._VWCB ____ . ___.___ 3...._wCB__ _ _*-*-..----

Date: 1._. Nov. 91_ & Feb ........22._. 2. Nov. 91 3. Nov. 91 If your answer is* "NO", and you wish an on-site inspection before submitting this application, conta<.'.t one of the per*tinent agencies as listed on pages b and c.

6. Provide a brief description of the project.

Maintenance dredging of the station's marked intake channel to previously permitted dimensions. Material will be removed by hydraulic dredge and transferred by pipeline to the previously approved, berrned, upland disposal site.

7. Name of the water body at the project location:

-*---* James River - - - - - - - - - - a tributary to -----=-----~------------ Chesapeake Bay

8. The water body at the project site is: (check one on line A and check one on line B)

A. ~ natural O man-made 0 uncertain B. ~ tidal O _____ ___ D__

non-tidal uncertain

9. Location of the project:

_Surry_*----.-........- - - - - - - - - - ._Surry_Power Station, Route 650 County /City Street, road or other descriptive location

( lot #, tract, section,. subdivision, etc.)

Name of and distance. to local town, com.. ,unity, or oth~r identifying landmark (ror Rural Areas): 9 miles NNW of Smithfield, Virginia

10. Proposed use (check one):

D Private Ocommercial * @Industrial 0Government D Other (explain be low):

BASIC APPLICATION FORM (Continued)

11. Primary purpose of the project:

To maintain barge access_to Surry Power Station.

~;econdar.Y purpose of the project:

To maintain an adequate inflow of cooling water.

1i*.***-*wrrr. *;iri*y*****i:iljt)TI*c. -E~;r1e*t=T*t-1:>e. . . <fo.rT*v*,;cr. * {; :.-;:_;*m* . **1:h*e*****;;;.:*c;:rec*t:1***-**-.. . .Eil_.v_~:*s**. -*. -*o*ruo*-**. . . . .C]ui\ic::*fii.fA*1N*--

. If your answer is "YES", explain below.

This maintenance dredging will allow Virginia Power to continue to provide reliable service to its customers.

13. Does the project involve destruction or alter*ation of wetlands? (See definition on page 8.) nYE:S @No ouNCLRIAlN .[f .Your answer is "YES", what will be the approx i.mate '1:'<'hal of:

A. Vl~get.atl~d Wl>tlands an~a(s) to be impacted? -*--...-0 _,,_,______.. square feet B. nonve91!tatf~d wetlands area(s) to bo. impacted? .. _____O__..._... _.._____ square feet (See page 45 for How to Calculate Square Fe1!t.) Also, if your answer is "UNCERlAl.NI'

.conta.ct_.t.he..Corp~... or . VMRC_.for .. an_ o.n-s i.t.e in.sp.ec_tion before_,,_submi tti1J9....j:hi s _

application.

14. Will there be any discharge (either direct or indirect) of waste material into ~,tate waters from the construction or operation of the project? (i]YES ONO
  • _. . . . . . . . . . . . . . . . . . _.......... *. . . See . . ~ el Q.w ..- ......................---*-......._..................._....._.. __...........- -.....- ... --.. -*----*-..*-*--*-........_ ..........- .*.* - ....*--..-*..**--*.. -*-*--*--* ..***--*........ --..........__ _
15. If the project will be a marina or other place where boats are moored or an addition to or 111a in tenance of the :;ame. have you obtained the State Hea 1th l)epar*tment' s approval for sanitary facilities? OvES ONO [!)NIA If your answer is "NO", contact your Local Health Uepartment. You are required by Section bl.1-3 of the Code of Virginia to obtain this approval or a variance before a VMRC permit can be issued.
16. Have you previou~ly applied to, or obtained a permit from, any agency (Interstate, Federal, State, or Local) for any portion of the project described in this appl iciition? @YES D NO D UNCLIHAlN If your answer is "YES", provide the following information:

Issuing or 0 ~l'!Y.!.!'.!9 __ Age~ T~_of Ac.tion IO No. Application Date Action D~!~

VMRC January 1986 April 25, 1986 VMRC Permit for maintenance /186-0072-2 dredging

  • The water overflow from the bermed disposal pond will flow into the station's intake canal and ultimately be discharged via Outfall 001 of the station's NPDES permit number VA0004090.

~ lb ~

. BASIC APPLICATION FORM (Continuid)


*-**---*----- -*-**--***-*--*M------* ..

17. H~s any work commenced or has any portion of the project for which you are seeking a permit been completed, DYE::::; ~NO If your answer is "YES", give details below. State when the work was co~eted and who performed the work. Please clear.!1.

d.i fferentiate O.!!.Jour a...e.e!ication drawi.!!9.!_.that.--2..ortion of. the work which has b~.~

£..<?.~.!.~ted from that which is proposed.

18. Approximately how long will it take to complete the project after all required permits have been issued? 60-90 days_1Ji0..Jnl:lnc. for the initial work. On as-needed

.. . basis .~----------------

thereafter.

~;:;.,;;;;.;;_:

19. Approximate total cost of the project (including materials and labor):

Sl.~900,000.00 for the initial work.

20. List the name and complete address of each adjacent property owner (see definition on page 5) to the project. Kirk Lumber Co.
1. Mr. Ray Fernald 2 *. Mr. Russel Kirk 3. Commonwealth Natura Virginia.Commission of c/o Armada-Hofler Enterprises Gas, VP-Operation Game & Inland Fisheries 825 Greenbrier Circle P. O. Box 2350 P ~ 0. Box 1104 Suite 201, P. O. Box 1467 Richmond, VA 23218 4010 West Broad Street Chesapeake, VA 23320 Richmond, VA 23230-1104
21. List the name and complete address of each waterfront property owner across the waterway from the project, if the water body is less than 500 feet wide. Also, if the project is within a cove, list the name and address of each property owner located on the cove.

N/A

22. Have you discussed this project with all adjacent .property owners and property o~ne-rs. -

across the waterway (if applicable) and had them sign an Adjac:ent Property Owner's Acknowl~d9emm1t Form on page 197 @YES ONO If your answer is "NO". refer to page 11, explanation number 20. . .

23**:. -1 . t",*t the name and c.~ddress of each known claimant at H_iparian Hi.9.ht.s

  • and/or **-*- .. * *-

O_yste.r ....P.lanting__ Grounds in the vicinity of the project:

J. H. Miles and Company, Inc.

P. 0. Box 178 Norfolk, VA* 23501

BASIC APPLICATION FORM (Continued)

24. Check t~e appendices belo~ which apply to your project. (NOTE: The-appli~a~;~-

appendices must be completed and submitted as part of your appiication).

LIST OF APPENDICES PAGE CJ A. Piers. Marginal Wharves, Boathouses, or Marinas CJ a. Dolphins or Moorings 25 D C. l:3oat Hamps 'l.7 D 0. Bulkheads 29 D L Fill 31 CJ F. Riprap 33

~ G. Dredging or Excavating 35

  • . CJ H. Jetties, Groins, or Breakwaters 37 CJ I. Intake or Outfall Structures 39 CJ J. Channel Modifications or Impoundment Structures (Dams) 41 CJ I<. Submarine Crossings, Overhead Crossings, or Tunnels 43 REMINDER: BE SURE TO COMP LE lE THE AP PENO ICES YOU CHECKED ABOVE UPON COMP LE Li.ON OF THE BAS[C APPLICA*noN FORM (PAGES 13-18). A.. TE::H COMPU:.TION OF TliE APPROPRIAIE APPENDICES, TURN TO THE SAMPL[ DRAWINGS INFORMATION ON PAGE 48 AND PREPARE YOUH APPLICATION LJlrnWINuS. MAIL ALL INFOHMATION TO:

Virginia Marine Resources Commission Habitat Management Uivision P. 0. Box 756 Newport News, Virginia 'l.3607 1'

18

~BASIC APPLICATION FOR~ (Contin~)

ALL APPLICANTS MUST SIGN lH!S PAGF. If the Certification of AuthoriLation below is completed and return0.d with this application dll future application correspondence may be signed by the duly authorized agent.

Also, please provide the name(s) and complQte address(es) of the leqal property owner( s) as shown on your recorded deed.

  • I hereby make ,;&pplication for all per*mits and a Certificato of water Quality Compllance (401), _as required, to authorize the activities I have described herein. Upon my signdture, I agree to allow the duly authorized representativt~s of any Local Wetlands Board, Virginia Marine ResourcC!s

. Commis.sion, st .. te Watar Control Board, State U~alth Department, Virginia Institute of Marin~ Science, Shoreline Erosion Advisory Service, Vir"ginia Soil and Water Conservation Commission, U. S. Ar*my Corps of Enqineers, National Marine Fisheries Service, Environmental Protection Ag~ncy, U. S.

Fish and Wildlife Service, ~nd the *rennessee Valley Authority to enter upon the premises of the project site at reasonable times for the purpose of inspe.ction.

I hereby certify that the information submitted in this application is true and accurate to the best of my knowledge.

B. M. Marshall .

Al'l'LlCANl'S NAMl (l'HINflO/TYµEO)

CERTIFICATION OF AUTHORIZATION (Only agents need to complete this form)

I hereby certify that I am des ignc,1.ted and authorized by


***----- [APPLICANT'S NAME]

to act on his/her/their/its behalf as agent and take all actions necessary to the processing, issuance, acceptance, and implementation of this permit and any and all :standard and special conditions attached hereto.

AGE.NT 1 S SIGNATURE AG~NT'S NAME (PRINT~O/TYP~D)

\

  • APPENDIX G DREDGING OR EXCAVATING NOTE 1 - If dredging for borrow material. minerals, etc., a permit may be required from Virginia Department of Conservation and Economic Development Division of Mined Land Reclamation Drawer U Big Stone Gap, Virginia 24219 (703) 523-2925 NOTE 2 -* If dredged material is to be placed in a disposal site, a separate map showing the location of _the disposal site should be attached. This drawing must indicate the proposed retention levees, weirs, spillways, and/or devices for retaining the materials.

NOTE 3 - Bottom samples. to determine heavy metals or other toxic materials must be taken and analyzed if deemed necessary by the Virginia State Water Control Board staff or the US Army Corps of Engineers. The responsibility, as well as the expense incurred for obtaining and analyzing these samples, must be borne by the applicant.

NOTE 4 - See page 45 - How to Calculate Square Feet, Cubic Feet, and Cubic Yards NOTE s*- If maintenance dredging is to be done, evidence of previous d.redging must be provided (see question 16 on page 15). Any previously-h!lued permit with dra1;1ing:; whid, indicates the date the dredging occurred, the area involved and dredging depth constitutes acceptable proof.

NOTE 6 - Please make sure answers to all of the questions in this appendix correspond to information on the application drawings.

1. This dredging or excavating is considered to be:

(check one) Onew [) maintenance Dboth

2. How many cubic yards of new material will be dredged or excavated ch~nnelward of the:

A. tidal waters: mean high water line? ---*... N/A - - - * - * - - cubic yards mean low water line? N/A cubic yar*d!I

8. non-tidal waters: ordinary high water line? N/A .cubic yards
3. How many cubic yards of material wi 11 be maintenance dredged or excavated chcrnn<' I ward of the:

A. tidal waters: mean high water line?----~~~-- cubic yards mean low water line? 300,000 cubic yard, B. non-tidal waters: ordinary high Wcit.Pr line? N/A -----*-- cubic yard, J .,

  • . e APPENDIX G (Continued)

DREDGING OR EXCAVATING 36 e

4. How many cubic yards of material will be dredged or excavated from:

A. vegetated wetlands: new 0 cubic yards maintenance 0 cubic yards B. non-vegetated wetlands: new -***-*----0 --*-*- cubic yards maintenance* ___Q,*----***- cubic yards

5. How many cubic yards of total material wi 11 be dredged or excavated by:

A. hydraulic method? 300,000 cubic yards B. clamshell (dragline} method? 0 cubic yards C. other method (explain below)? ---****--*O********-*- _____ cubic yards

6. What will be the maximum dimensions of the dredged or excavated area relative to mean low water (for tidal areas only} or ordinary high wc1ter (for non-tidal areas only}?

5700' +10' length -:-.13..._3.~.. - depth ..._.J5Q.' ..- base width ..2..LQ~-*-- top width

1. State the type and composition percentage of the dredged or excavated material (e.g. clay 25~, sdnd 25i., s i 1 t ')0") --*-***** ***-******--*-**-*--*--------*-* .*--*-* *****--**-----

90% silt, 10% sand

8. What is the size of the disposal site (see Note 2 on page 35)?

~. surface area -*********--*__1,_495.,ooo .................--.-*********-*-**** square feet:

B; pond i ng depth ------***--*********--****l O***--***-*--*------****- , 1; ,, 1a am@ feet

. C. levee or berm height feet

9. !tow will the dredged or excavat,~d material be transported to its disposal area?

-***** Bl_...P ip.el ine *--******-- . **-***-- ----**-******** .................................. ***-*****-***------**-*----*****--**-*****-*-*---*----*****-*-- _

10. How wi 11 the dredged or excavated 111ateri.,d be retained to prevent its reentry into the. water body (e.g. bulkht~ad, earthen bernt, hay bales, levees, etc.)?

...._.Earthen berm ---*--------**************-**-******-********-*** ***-----**----**-*-----*******-------*-****

11. Wi 11 you make any commercia 1 ust* of ttu~ dredgt'd material 7 D n:s * ~ NO If .Your answer is "YES",. explain: ................ **-*********--*****------*-----.. **---..----.. ****- . --*-*********---*~*-*-*-*--' _

'W .. * ('Ill

\

\

  • \

N310000

\ \

\

\

\ I*

\ It')

N lo.I

\ \

\ \

PROPERTY OWNER1 \

COMMONWEAL.TH \

\

OF VIRGINIA

\

\

-3

\ _ ,\

\

\

-2 \ \

\

\ \

a: \ \

I.I.I

-a: \

-7

-3

\

\

\

XISTING INTAKE CHANNEL 150' REOREOOED TO EL

  • 13, JI

-\

..1.

\

I / - \

-2 I I I CJ)

I.I.I

-4 L I I

-12

~ -6 I

<[

I \

-3

~

I I \

-12 I I \ r\

I i- \ I I

  • 6

\ I \ I /

\ I \ I I PROPERTY OWNER1 . \ I I I \

KIRK LUMBER Ca-lPANY \ I I I I

\ I I I I

\ I I I I HHW I I I \ \

-6

\

I I I I \*6 '\

  • I I I I I J \

I 8 7!58 I

1588 SCALE,

  • 1*1 1!118'

,- MAINTENANCE DREDGING - JAMES RIVER IN1 JAMES RIVER COUNTY OF1 SURRY PROPOSED DREDGING AREA AT1 SI.MY POWER STATION APPLICANT, VIRGINIA POWER STATE OF1 VIRGINIA DATE, 7*31*~2 OF