|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210N2921999-08-0505 August 1999 Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl1999-07-0808 July 1999 Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl 1999-09-08
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20196G2211999-06-21021 June 1999 Forwards Licensee Sampling & Testing Obligations Re Vpdes Permit VA0052451 Reissuance Application.Details of Requests for Sampling & Testing Waivers,Included ML20195J1391999-06-11011 June 1999 Submits Addl Info as Addendum to Original Application Which Proposed Use of Three Chemicals in Bearing Cooling Tower at North Anna Power Station,Per Reissuance of Vpdes Permit ML18152A4741999-05-19019 May 1999 Forwards Completed Registration Form for Renewal of ASTs at Surry Nuclear Power Station,Iaw Section 9VAC 25-91-100.F ML20206M7921999-05-0707 May 1999 Advises That Vepc Is Proposing to Use Three Chemicals in Bearing Cooling Tower at Naps,That Were Not Addressed in Licensee Last Application for Reissuance of Vpdes Permit ML18152B5991999-01-0808 January 1999 Confirms That Util Procedure for Tracking low-level Radiologically Contaminated Asbestos Waste (Rcaw),Acceptable for Maintaining Compliance with Natl Emissions Stds for Hazardous Air Pollutants (Neshap) Regulations ML20196H6431998-12-0303 December 1998 Informs That Util Is Seeking Approval to Discharge Chlorinated Blowdown from Bearing Cooling Tower for More than 2 H Per Unit as Specified in Special Condition 10 of Vpdes Permit.Meeting During Wk of 981214,requested ML20153G0131998-09-22022 September 1998 Requests Approval for Extended Compliance Schedule for Specific Provisions of Part III (9 VAC25-91-130,Pollution Prevention Requirements) for North Anna Nuclear Power Station ML18153A2671998-09-22022 September 1998 Requests Approval for Extended Compliance Schedule for Specific Provisions of Part III (9 Vac 25-91-130,Pollution Prevention Requirements) for Surry Nuclear Power Station ML18152B8171998-05-18018 May 1998 Discusses Results of Data Contained in Discharge Monitoring rept-QA (Dmr/Qa) Dtd 980114 ML20217Q7691998-05-0404 May 1998 Forwards Revised Application for Exclusionary General Permit for NAPS as Requested by D Vaughan in ML18153A2161998-01-23023 January 1998 Notifies That Plant Has Not Received Copy of Waste Shipment Record,Signed by Owner or Operator of Designated Waste Disposal Site within 35 Days Since Waste Was Shipped off- Site & Will Not Receive in 45 Days ML20198P8791998-01-12012 January 1998 Submits Application for Exclusionary General Permit for Plant ML20203H6111997-12-15015 December 1997 Forwards Application for General Storm Water Permit for Construction Activity at Naps.Local Government Ordinance Form,Pink Copy of Permit Application Fee Form & Copy of Check for Application,Encl ML20198P2871997-10-29029 October 1997 Requests That Vpdes Permit Be Amended to Reflect That Three Small Package Sewage Treatment Plants Were Permanently Removed from Svc ML20210G9721997-07-22022 July 1997 Submits Proposal to Pressure Test Piping within 10 Days Prior to Normal Fuel Oil Unloading Into Ast,Beginning No Later than 980101 ML20138B3381997-04-23023 April 1997 Provides Info to Support Proposal to Perform Annual Pressure Testing as Method of Leak Detection for Underground Line That Runs from Loading Area 5,000 Barrel Aboveground Storage Tank ML18153A1171997-03-19019 March 1997 Discusses Discharge Monitoring report-quality Assurance (DMR-QA) Results for VA Power Facilities ML18153A1111997-02-14014 February 1997 Confirms 970214 Telcon Re Location of Radiologically Contaminated Asbestos Waste Shipment S-96-1005 ML20149M8131996-12-0505 December 1996 Submits Conditions Which Are Part of 961202 Approval of Temporary Conditional Use Permit Which Allows Construction of Temporary ISFSI or Dry Cask Storage as Listed ML20101R2521996-04-10010 April 1996 Responds to Unacceptable Results Noted in Discharge Monitoring rept-QA Rept for North Anna Power Station (Permit VA0052451) & Yorktown Power Station (Permit VA0004103) ML20101J0511996-03-21021 March 1996 Provides Notice of Intent to Increase Amount of Reverse Osmosis Reject Water Discharged at Outfall 020 ML18151A1871996-03-20020 March 1996 Forwards Application for Reissuance of Vpdes Permit VA0004090 for Plant.W/One Oversize Map ML18153A5301996-03-18018 March 1996 Confirms That Procedure for Tracking low-level Radiologically Contaminated Asbestos Waste Acceptable for Maintaining Compliance W/Natl Emissions Stds for Hazardous Air Pollutants Regulations ML20100B9061996-01-24024 January 1996 Submits Annual Statement Verifying That Each Spillway Gate Operated at Least Once During Twelve Months Preceding Annual Insp by Ferc,Per 18CFR12.44(b)(2).Main Dam'S Five Spillway Gates Satisfactorily Tested as Specified on Attached Form ML18153A5561995-12-11011 December 1995 Requests Approval for Proposed Minor Change in Nature of Internal Discharge at Plant ML18153A6821995-11-29029 November 1995 Responds to 951114 Lab & Technical Insps at Plant on 950928. Submits Actions Taken to Address Items Noted During Insp & Reflected in Lab Rept ML18153A6721995-11-22022 November 1995 Requests That Vmrc Permit 92-1347 Be Extended to Allow Continued Maint Dredging Activity in Future ML18153A7801995-10-10010 October 1995 Responds to Concerns Re Leak Detection Sys in Facilities in Jurisdiction ML18153A7461995-08-30030 August 1995 Notifies of Minor Change in Discharge or Mgt of Pollutants at Surry Power Station ML20087L3411995-08-21021 August 1995 Notifies of Minor Change in Discharge or Mgt of Pollutants at Plant ML18153A7311995-08-0909 August 1995 Forwards Mixing & Dilution of Surry Nuclear Power Plant Cooling Water Discharge Into James River. ML18152A4011995-05-11011 May 1995 Responds to Telcons W/Eh Greene of VA Power'S Air Quality E Dept Re Use of Methylene Chloride in Paint Shop of Surry Power Station.Requests Confirmation That Painting Operation Exempt from Toxics Regulations ML20083K7181995-05-0404 May 1995 Forwards Application for Reissuance of Vpdes Permit for North Anna Power Station W/Addl Data Requested by ML18153A8081995-04-28028 April 1995 Provides Comments on EPA Pr Re Criteria for Certification & Determination of Waste Isolation Pilot Plant Compliance W/ Environ Standards for Mgt & Disposal of SF,high-level & Transuranic Radwastes.Guidance Re Categorization Needed ML18153A7921995-04-12012 April 1995 Submits Comments Re Proposed Revs to Guidance Provided to Federal Agencies on Radiation Protection ML20080J9181995-02-22022 February 1995 Submits Annual Statement Verifying That Each Spillway Gate Has Been Operated at Least Once During Twelve Months Preceeding Annual Insp by FERC Regional Engineer ML20080K8561995-02-22022 February 1995 Submits Notification for Spillway EDG Corrective Maint & Start Failure for Plant Hydroelectric Project ML18153B2351995-02-17017 February 1995 Informs of Receipt of NOV in Ref to Dec 1994 Excursion of Total Suspended Solids Limitations of Vpdes Permit for Plant ML20078M1481995-02-0808 February 1995 Discusses Series of Problems at Sewage Treatment Plant Re Exceedance in Bod ML18153B2161995-02-0101 February 1995 Advises That Plant Has Not Received Copy of Waste Shipment Record,Signed by Owner or Operator of Designated Waste Disposal Site within 45 Days Since Waste Shipped off-site ML20078H0711995-01-30030 January 1995 Discusses Conditions Affecting Safety of Project That Documents Problem Encounter W/Spillway EDG at Plant Main Dam & Informs on 950103 Spillway EDG Failed to auto-start During Performance of Monthly Periodic Test ML20078E1251995-01-25025 January 1995 Submits Notification Re Stationary Source Permit to Construct & Operate an EDG ML18153B2181995-01-23023 January 1995 Informs That Scientific Ecology Group,Inc Received Shipment S-94-14 Which Consists of 3 B-25 Boxes of Asbestos ML18153B2021995-01-0303 January 1995 Submits Follow Up to Telephone Notification Re Excursion of Total Suspended Solids Limitations at Plant Outfall 181 ML20080C1381994-11-30030 November 1994 Responds to Issues Identified in Repts for Technical & Lab Insps on 941018 & 20.Corrective Actions:Corrected DMR Forms Completed & Submitted to Dept of Environ Quality & TSS Worksheet Form Revised ML20077C2481994-11-22022 November 1994 Discusses Licensee Request for Relief from Ph Limitations in Plant Current Vpdes Permit at Outfalls 003 & 004 ML20078G8421994-11-0909 November 1994 Submits Response to Violations Noted in Insp Repts 50-338/94-10 & 50-339/94-10.Corrective Actions:Upset Conditions Corrected & Facility Performance Inproved ML18153B0611994-08-30030 August 1994 Requests 60-day Extension for Submittal of Initial Abatement Rept & SCR ML20071L6281994-07-28028 July 1994 Ack Receipt of Detailed Response to NPDES Insp Rept 1999-08-17
[Table view] |
Text
I'
- Innsbrook TecJ:mzcal Cmter
'5000 Dominion Boulel'Czrci
- Glen Allen Virginia ..?3060 December 23, 199.1 Mr. Charles B. King VIRGINIA POWER NESHAP Program Coordinator Commonwealth of Virginia Department of Air Pollution Control Room 601, Ninth Street Office Building P.O. Box 10069 Richmond, Virginia 23240 RE: ASBESTOS DISPOSAL REPORT
Dear Mr.' King:
This letter is to advise you pursuant to 40 C.F.R. § 61.150(d) (4) that Virginia Power has had four recent shipments of asbestos wastes that may be viewed as triggering the 45-day reporting requirement under the above regulation. Each shipment included potentially radioactive asbestos-containing wastes generated at either the Surry or North Anna Nuclear Power Stations.
Because of the high disposal cost and limited capacity and number of disposal repositories for low level radioactive waste, it is the practice in the nuclear industry for such low level wastes to be transferred first from the site of the generator to a processing contractor and then from the processing contractor to one or more disposal repositories. / Two contractors, Quadrex and Scientific Ecology Group, Inc. (SEG), provide processing services for Virginia Power. Typically, low level wastes, including asbestos-containing wastes, are received by these contractors and held for compaction into "discs" that may be stored in drums and then transferred to a licensed repository for final disposal. Wastes received by the processing contractors are held by those* contractors until sufficient wastes are received from one or more sources to warrant a shipment to a waste repository.
In* the case of each of the referenced shipments for Virginia Power nuclear facilities, the total time required from initial shipment to final disposal exceeded 45 days. While such shipments were made in full compliance with u. s. Nuclear Regulatory Commission and Department of Transportation requirements for shipment, handling and disposal of , low level wastes, the time between the initial shipment and final disposal for each of these shipments could be viewed as triggering reporting requirements under 40 .c.F.R. § 60.150(d) (4). Accordingly, we are submitting this letter to you regarding the status of these shipments *.
~72U:llJ:.::i:_i 1 1,.... r,.- I\
1n-vr1--;:;"'*
.. *f-7-*
.i;...J_._,
\
1 ;-~ HDOCK 05000280
\ *=* . F'[tt( . I
Mr. Charles B. King December 23, 1991 Page 2 As noted above there have been four relevant shipments of wastes containing asbestos, three originating from the North Anna Power Station (May 9, 1991, May 23, 1991 and August 29, 1991) and one originating from the Surry Power station (February 8, 1991). The May 9 and May 23 shipments from North Anna were sent to Quadrex in Oak Ridge, Tennessee. From there, the non-radioactive portions of these shipments were sent to Middle Point Landfill, Murfreesboro, Tennessee, where they were received on June 11, 1991 (32.37 cubic yards) and July 10, 1991 (36.26 cubic yards), respectively. The radioactive portions of these shipments were processed by Quadrex and buried at Barnwell, South Carolina on October 29, 1991 (136.18 cubic feet) and October 30, 1991 (46.20 cubic feet).
The August 28 North Anna shipment went to Quadrex for processing.
A non-radioactive portion of this shipment (36.85 cubic yards) was received by the Middle Point Landfill on October 24, 1991. The final portion of this shipment has yet to be processed (i.e. ,
verified non-radioactive). We will advise you promptly when we receive confirmation of its burial.
The single shipment of asbestos-containing waste from Surry was shipped to SEG in Oak Ridge, Tennessee. We have been advised by SEG that this shipment was processed and shipped to Barnwell, South Carolina on March 4, 1991 (9.2 cubic feet) for burial.
The disposal practices outlined above are an appropriate and necessary approach to disposal of radioactive asbestos-containing waste. We believe these practices are consistent with the intent of NESHAP regulation, but we concede that they may result in more time between initial shipment and final disposal than is presently contemplated by those regulations.
Enclosed are copies of the waste shipment records for the shipment not yet delivered to the disposal repository. These forms were developed to meet U.S. Nuclear Regulatory Commission and Dept. of Transportation requirements for shipment and disposal of low level radioactive wastes and are therefore different in some respects from the NESHAP forms recommended by EPA. If you have any questions, please contact me on (804)273~3023.
Very truly yours,
~ C.~/rav A. Wallace Hadder Manager-Air Quality Enclosure cc: Nuclear Regulatory Comission
' OCT 23 31 13: 42 VR. P.R N. RNNR RI, 1 IN. LOBB'(
- P.5/7 VIRGINIA POI.I~~ COMPANY* NORTH ANNA P~R STATION P.O. BOX 402 MINERAL,VA 23117
- PHONe (703)*894*2917 STRAIGHT 8ILL OF LADING* SHORT FO~M - OIIGINAL
- NOT NEGOTIABLE RECEIVED, subject to the classifications and tariffs in effect on the date-of the issue of this Billot Lading.
The property described below, in apparent good order, except as noted (Contents and conditions of contents of packages unknown),
marked, consigned, and destined as indicated below, ~nich said carrier (the word carrier being understood throughout this contract as meaning any person or corporation in possession of the property under the contract) agrees to carry to its usual place of delivery at said destination, if on its rout~. otherwise to deliver to another carrier on the route to said de~tinatlon. It is mutually agreed, a~ to each carrl~r of all or any of said property over all or any µurtion uf said rout~ co destination and as to each party at any time interested In all or any of said property, that every service to be performed hereunder shall be subject to all the terms and conditions of the uniform domestic straight bill of lading set forth (1) in official Southern, i.estern, and Illinois Freight Classifications in effect on the date hereof, If this is a rail or a rail-water shi~nt, or (2) in the applicable motor carrier clas~ification or tariff if this is a motor carrier shipment.
Shipper hereby certifjes that he is familiar with alt the terms and conditions of the said bill of lading, including those on th~
- back thereof, set _forth in the classification or tar:rf which go11er!15 the trotnE>portation of this shii;ment, ana the said terms ano conditions are hereby agreed to by the shipper and ac~epted for himself and his assigns.
(MAIL OR STREET.ADDRESS Of CONSIGNEE* FOR PURPOSES OF NOTIFICAT10N ONLY> SHIPPING ID#
FROM; VIRGINIA POWER COMPANY* NORTH ANNA POwER STATION 91*RHS-093 P.O.BOX 402 MI N'ERAL, \IA 23117 LENGTH : LEGAL CONSIGNED TO: QUAOREX RECYCLE CENTER HEIGHT : LEGAL DESTINATION : 109 fLINT ROAD WIDTH : LEGAL ERACTOR # I K 9111 I
OAK RIDGE, TN 37830-7033 I TRAILER # I A 861 I
NO. (IND OF PACKAGE, DESCRIPTION Of ARTICLES, LINER NUMBERS, !.EIGHT PICGS HH SPECIA, MARKS &EXCEPTIONS csue.. TO CORR.)
1 xx RADIOACTIVE MATERIAL, LSA, n.o.s., UN2912 ASBESTOS ORH-C (RO) 18 CUBIC METERS 28,000 lbs.
1 STRONG TIGHT CONTAINER (SEA VAN) CONTAINING CONTAMINATED ROOFING MATERIAL (NONFRIASlE AS8EST0S),
t xx RADIOACTIVE MATERIAL, EMPTY PACKAGES, UN2908 7,000 lbs.
1 EMPTY STRONG TIGHT CONTAINER (SEA VAN).
PHYSICAL FORM - SOLID CHEM! CAL FORM
- 11ETAL OXIDES PROHINENT NUCLIDES: Fe55,Co58,Co60,Ni63,Sb125,Zr9S,Nb95,Cs134,Cs137.
TOTAL ACTIVITY 3.3 mCi VEHICLE PLACARDED "RADIOACTIVE" TOTAL 35,000 lb:i.
IMPORTANT: This is to certify that the al:)ove named mar.erlals Received the property described al:)ove in good condition, are properly classified. described, packaged, marked Jnd labeled except as otherwise noted.
- and are in proper aonditicn for transportation according to th&
applicable resulaticns of th part11ent of Transportarion. CARRI~R; KINDRICK ~HCICIN~NY SIGNATURE; DRIVER : ~ .. uj, m~~
Cc>>IPANY : VIRGINIA PO\.IER Cc>>IPANY DATE: 08-~8-91 OATE ANO TIHE: 08*28*91 / 1030 OATE TIME DATE TIHE SHIPPER'S SIGNATURE SCHEDULED TO ARRIVE 08-28*91 0700 COMPLETED LOADING 08*28-91 1030 Wsm~
DATE TtME DATE TIJIIE SHIPPER'S SJGHATURE ARRIVED AT SHIPPER 08*28*91 0700 LEFT SHIPPER 08*28*91 1130 ff~
SHIPPER IMPORTAWT NOTE; 1our signature certifies that rne above datea and times are correct for record keeping and b1ll1n9 purpoaea.
.-,.-, * '31 13: 43 VR. POWER I"~. RNHH RL jJJ. L0BB r' i'
~ VIRGINIA P,0,8ox POii/ER COMPANY* NORTH ANNA PCWE~TION 402 "lneral,VA 23117 EPA ID N~r : VAD 065376279 RADIOACTIVE MArERIAL TRANSFER AND SHIPMENT RECORD Tran5ferr@d to: QUADREX RECYCLE CENTER CXJ Specific License No. : R*01037*J94 Shipment ID#; 91*RHS-093 Address: 109 FLINT ROAD Expiration date: 10*31*94 Shipping Date: 08*28-91 OA~ RJOGE, TN 37830*7033 [ J Exeq>t per 10CFR30, 1S Sheet 1 of 1.
Carrier: KlNORICK TRUCKING COMPANY Truck/Cab#: K 9111 . Trailer#: A 861 Murnber and Pack~ge Oescri2tion DOT Shf[!121ns Name and Nunber Total Weight Other 2 STRONG T!GHT CONTAlN~RS [ l Excepted from shipping paper requirements. mCi lb5. C l Highway Rt. Control Oty.
f)(] Radioactive Material, LSA, n.o.s,, UN 2912 CJ NRC approved package, [Xl Radioactive Material, E~ty Packages, UN 2908 2910 3.3 35,000 ID lllarking: CX] Asbestos ORM*C (RQ) .
.PKG. DESCRIPTION PHYS, ANO ACT, WEIGHT PKG, RAD LEVELS,mR/hr PACKAGE IO # OF CONTENTS CHEM. FORM mCi RADIONUCLIOES ~bs. SPEC SURFACE AT 1m LABEL, Tl, OR MARKING QG- ROOFING "MAJERIAl Sol id/ Fe55,Co58,Co60,Ni63, s [Xl Ho Li!!bel Required, C J Errpty 16 NON FRIABLE Metal 3.3 Nb95,Zr95.Sb12S, 26,000 T o.os o.os rl Radioactive White I, (Xl LSA
- ASBESTOS oxides Cs 134, Csl3/ C [ ] Radioactive Yellow , Tl"'
QG* EMPTV sol Id/
. EMP- Fe55,coS8,Co60,Ni63, s [ l No Label Required, (Xl Cmpty 20 SEA VAN loletal TY Nb95,Zr9S,Sb125, 7,000 T 0.05 o.os C l Radioactive White I, [ ] LSA Oxides Cs134,Cs137 C r l Radioactive Yellow , Tl=
-ft&~\\"t\0
\\\tU~\n* --
~, ~\;.
[Xl Eaeh package item described above has been monitored for external removable radioactive contamination and is within the limits of 49CFR173.443, special Instructions or Information to Carrier (appl icab: e items mark.eel below by an 11l< 11 in the appropriate box)
()() Thi$ vehicle is consigned as sole use. Shipment musr bf/ unloaded by consignee or his designated agent for the transport vehicle in which originally loaded.
Cl<J see att.iched form HP*7.1.40*5, uspec:ial Instructions to carrier", for additional requirements.
[ ]
shipPer Certification (flpplicable certification is indic.ited below by an 11 X11 in the appropriate box)
Thi$ package c:onforlll:il to the conditions and limitations ~peclfied in:
- r J 49CFR173.421 for excepted radioactive material, limited quantity, n.o.s., UN 2910;
[XJ 49CFR173.427 tor excepted radioactive mater*ial, empty pack.ages, UM 2908;
[ J 49CFR173.422 for excepted radioactive mat~rial, instrYments and articles, UN 2911
[Xl This is to certify that the herein named materials are properly classified, descli, packaged, marked and la~led, and are in proper condition for transportatiOn according to the applicable re~ulatlons of e Oepar~t of Transportation.
Signed : Va, Power by : if~ , date 08-28*91 Reviewed by : I,/ )va1'/J , date : 08-28*91