Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525
ML18152B380
Person / Time
Site: Surry Dominion icon.png
Issue date: 08/18/1999
From: Mccarthy J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18151A665 List:
References
99-419, NUDOCS 9908240200
Download: ML18152B380 (2)


Text

CATEGORY .,1.,

REGULA~Y INFORMATION DISTRIBUTI.SYSTEM (RIDS)

ACCESSION NBR:9908240200 DOC.DATE: 99/08/18 NOTARIZED: NO DOCKET#

FACIL:50--~81 .Surry Power Station, Unit 2, Virginia Electric & Powe 05000281 AUTH!~E AUTHOR AFFILIATION MCCAR'I'HY; J. H. Virginia Power (Virginia Electric & Power Co.) S'"e,e..,-

RECIP .. NAME RECIPIENT AFFILIATION REYES,L.A. Region 2 (Post 820201) Re~

SUBJECT:

Forwards Technical Rept NE-1206,Rev 0, 11 Surry Unit 2,Cycle 16 Startup Physics Tests Rept, 11 summarizing results of C physics testing program performed after initial criticality on 990525. A DISTRIBUTION CODE: IE26D COPIES RECEIVED:LTR ' ENCL \

TITLE: Startup Report/Refueling Report (per Tech Specs_)_

SIZE: l +5 7 NOTES: 05000281 El G

RECIPIENT COPIES RECIPIENT COPIES ol ID CODE/NAME LTTR ENCL ID CODE/NAME L.TTR ENCL EDISON,G. 1 1 R INTERNAL: ACRS 1 1 FILE CE!!ER 1 1 y NRR/DSSA/SRXB 1 1 ~ ~LE 0~ ,, 1 1 EXTERNAL: NOAC 1 1 NRC PDR

  • 1 1 1 NOTES: 1 1 u

M

.E N

T

'NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. 'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 8 ENCL 8

)  :

Aug.ust 18, 1999 Mr. Luis A. Reyes, Administrator Serial No.: 99-419 United States Nuclear Regulatory Commission NLOS/MM Region II Docket No.: 50-281 Atlanta Federal*Center License No.: DPR-37 61 Forsyth St., SW, Suite 23 T85 Atlanta, GA 30303-3415

Dear Mr. Reyes:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 2 CYCLE 16 STARTUP PHYSICS TESTS REPORT As required by Surry Technical Specification 6.6.A.1, enclosed is the Virginia Electric and Power Company Technical Report NE-1206, Revision 0, entitled "Surry Unit 2, Cycle 16 Startup Physics Tests Report." This report summarizes the results of the physics testing program performed after the initial criticality of.Cycle 16 on May 25, 1999. The results of the physics tests were within the applicable Technical Specification limits.

If you have any questions or require additional information, please contact us.

Very truly yours, P-~~/

J. H. McCarthy, Manager Nuclear Licensing and Operations Support Enclosure - Surry Unit 2, Cycle 16 Startup Physics Tests Report Commitment Summary: There are no new commitments as a result of this letter.

cc: U. S. Nuclear Regulatory Commission - 5 copies Attention: Document Control Desk