ML18152B649

From kanterella
Jump to navigation Jump to search
Forwards MOR for Mar 1999 for Surry Power Station,Units 1 & 2.MOR for Feb 1999 Incorrectly Stated Gross Electrical Energy Generated (Mwh) for Unit 2.Rept Should Have Stated Monthly Figure as 568965.0
ML18152B649
Person / Time
Site: Surry  Dominion icon.png
Issue date: 04/13/1999
From: Grecheck E
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18152B650 List:
References
99-190, NUDOCS 9904190255
Download: ML18152B649 (2)


Text

e VIRGINIA ELECTRIC AND PowER COMPANY RICHMOND, VIRGINIA 23261 Apri 1 13, 1999 United States Nuclear Regulatory Commission.

Attention: Document Control Desk Washington, D.C. 20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Serial No.

SPS Lic/JSA Docket Nos.

-License Nos.99-190 RO 50-280 50-281 DPR-32 DPR-37 The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of March 1999 is provided in the attachment.

The February 1999 Monthly Operating Report 99-02 incorrectly stated the Gross Electrical Energy Generated (MWH) for Unit 2.

The report should have stated the monthly figure as 568965.0. This corrected figure then changed the Year-to-Date figure to 1205175.0 and the Cumulative figure to 123753068.0.

If you have any questions or require additional information, please contact us.

Very truly yours, E. S. Grecheck, Site Vice President Surry Power Station Attachment Commitments made by this letter: None

--~ ---------~~---

,~~904190255 990413 PDR ADOCK 05000280 R

~I

cc:

, U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth Street, S. W.

Suite 23T85 Atlanta, Georgia 30303 Mr. R. A. Musser NRG Senior Resident Inspector Surry Power Station e

Serial No. 99-190: SPS Monthly Operating Report Page 2 of 2