Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML040300802, ML040631055, ML042520157, ML042670485, ML050870511, ML051090111, W3F1-2004-0085, Schedule Clarification for Amendment Request NPF-38-249, Extended Power Uprate, W3F1-2004-0101, to Amendment Request NPF-38-256, Alternate Source Term, Waterford Steam Electric Station, Unit 3
|
MONTHYEARML0401405152004-01-14014 January 2004 Meeting with Entergy, Waterford Steam Electric Station, Unit 3 Extended Power Uprate Amendment Request Dated 11/13/2003 Project stage: Meeting ML0425201572004-01-14014 January 2004 E-mail to T. Alexion Dated 1/14/04 Waterford - Extended Power Uprate Project stage: Other ML0403008022004-01-28028 January 2004 FRN -Notice of Consideration of Issuance of Amendment for Extended Power Uprate and Opportunity for Hearing Project stage: Other ML0403302602004-01-28028 January 2004 1/28/04 Waterford 3 - RAI Revision to Facility Operating License & TS - Extended Power Uprate Request. TAC MC1355 Project stage: RAI W3F1-2004-0004, Supplemental Information Extended Power Uprate - Power Ascension Testing2004-01-29029 January 2004 Supplemental Information Extended Power Uprate - Power Ascension Testing Project stage: Request ML0425201642004-01-30030 January 2004 E-mail Dated 1/30/04 RAI from Environmental Section on Waterford Unit 3 Project stage: RAI ML0425201672004-02-10010 February 2004 E-mail Dated 2/10/04 Waterford - Draft RAI from Human Performance, Piping Integrity and Electrical Groups Project stage: Draft RAI ML0425201702004-02-18018 February 2004 E-mail Dated 2/18/04 Re RAI from I&C - Waterford Project stage: RAI ML0405506052004-02-20020 February 2004 Westinghouse Request Withholding from Public Disclosure, Waterford 3, Extended Power Uprate, Appendix 1 - Safety Evaluation Report Compliance, MC1355 Project stage: Approval ML0425201712004-02-23023 February 2004 E-mail Dated 2/23/04 Waterford RAI Containment Systems Project stage: RAI ML0406310552004-02-26026 February 2004 Summary of Entergy Operations, Inc. Presentation of Extended Power Uprate Project stage: Other ML0426704892004-03-0202 March 2004 E-mail from B. Miller to N. Kalyanam RAI from SPLB-Angelo Stubbs Project stage: RAI ML0426704852004-03-0202 March 2004 E-mail from D. Miller to K. Kalyanam Re RAI from J. Tsao Project stage: Other W3F1-2004-0017, Supplement to Amendment Request NPF-38-249 Regarding Extended Power Uprate2004-03-0404 March 2004 Supplement to Amendment Request NPF-38-249 Regarding Extended Power Uprate Project stage: Supplement ML0406909622004-03-0909 March 2004 Extended Power Uprate Acceptance Review Project stage: Acceptance Review ML0407809952004-03-16016 March 2004 RAI, Proposed Revision to Facility Operation License and TSs - Extended Power Uprate Request Project stage: RAI ML0408506542004-03-24024 March 2004 RAI Related to Revision to Facility Operating License and TSs - Extended Power Uprate Request Project stage: RAI ML0412102452004-03-26026 March 2004 Request for Additional Information, Revision to Facility Operating License & Technical Specifications - Extended Power Uprate Request Project stage: RAI ML0409102392004-03-31031 March 2004 RAI Related to Revision to Facility Operating License and TSs - Extended Power Uprate Request Project stage: RAI ML0410005142004-04-0808 April 2004 RAI Related to Revision to Facility Operating License and TSs - Extended Power Uprate Request Project stage: RAI W3F1-2004-0029, Extended Power Uprate, Waterford, Unit 3 Supplement to Amendment Request2004-04-15015 April 2004 Extended Power Uprate, Waterford, Unit 3 Supplement to Amendment Request Project stage: Supplement ML0411301942004-04-20020 April 2004 RAI Related to Revision to Facility Operating License and TSs - Extended Power Uprate Request Project stage: RAI ML0412705672004-05-0404 May 2004 RAI, Revision to Facility Operating License and TSs - Extended Power Uprate Request Project stage: RAI W3F1-2004-0035, Supplemental to Amendment Request for Extended Power Uprate2004-05-0707 May 2004 Supplemental to Amendment Request for Extended Power Uprate Project stage: Supplement W3F1-2004-0037, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-05-12012 May 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement ML0413801452004-05-13013 May 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement W3F1-2004-0043, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-05-21021 May 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement W3F1-2004-0047, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-05-26026 May 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement ML0417405772004-06-21021 June 2004 RAI, Revision to Facility Operating License and Technical Specifications - Extended Power Uprate Request, TAC MC1355 Project stage: RAI W3F1-2004-0052, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-07-14014 July 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement ML0420202942004-07-15015 July 2004 License Amendment Request NPF-38-256, Alternate Source Term Project stage: Request W3F1-2004-0061, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-07-28028 July 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement ML0421100882004-07-29029 July 2004 Meeting with Entergy to Discuss Issues with Extended Power Uprate and Alternate Source Term Submittals Project stage: Request ML0422303352004-08-10010 August 2004 August 11, 12 and 13, 2004 Meeting with Westinghouse Re Waterford Main Steam Line Break, Feedwater Line Break and EPU Project stage: Meeting W3F1-2004-0068, Supplement to Amendment Request NPF-38-249 Extended Power Uprate2004-08-10010 August 2004 Supplement to Amendment Request NPF-38-249 Extended Power Uprate Project stage: Supplement W3F1-2004-0071, Supplement to Alternate Source Term Submittal2004-08-19019 August 2004 Supplement to Alternate Source Term Submittal Project stage: Request ML0423904892004-08-26026 August 2004 Meeting with Entergy to Discuss Issues with Extended Power Uprate and Alternate Source Term Submittals Project stage: Meeting W3F1-2004-0076, Supplement 2 to Amendment Request NPF-38-256, Alternate Source Term2004-09-0101 September 2004 Supplement 2 to Amendment Request NPF-38-256, Alternate Source Term Project stage: Supplement W3F1-2004-0078, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-09-14014 September 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement ML0427505192004-09-29029 September 2004 RAI Extended Power Uprate Request and Alternate Source Term Request Project stage: RAI ML0427402482004-09-30030 September 2004 (3) Steam Elecric Station, #3, Draft EA and Finding of No Significant Impact Related to a Proposed License Amendment to Increase the Licensed Power Level (Tac. MC1355) Project stage: Draft Other W3F1-2004-0092, Supplement to Amendment Request NPF-38-249 Extended Power Uprate2004-10-0808 October 2004 Supplement to Amendment Request NPF-38-249 Extended Power Uprate Project stage: Supplement W3F1-2004-0086, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-10-0808 October 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement W3F1-2004-0085, Schedule Clarification for Amendment Request NPF-38-249, Extended Power Uprate2004-10-13013 October 2004 Schedule Clarification for Amendment Request NPF-38-249, Extended Power Uprate Project stage: Other W3F1-2004-0095, Supplement 3 to Amendment Request NPF-38-256 Alternate Source Term2004-10-13013 October 2004 Supplement 3 to Amendment Request NPF-38-256 Alternate Source Term Project stage: Supplement W3F1-2004-0096, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-10-18018 October 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement W3F1-2004-0101, to Amendment Request NPF-38-256, Alternate Source Term, Waterford Steam Electric Station, Unit 32004-10-19019 October 2004 to Amendment Request NPF-38-256, Alternate Source Term, Waterford Steam Electric Station, Unit 3 Project stage: Other ML0430102382004-10-21021 October 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement ML0431006112004-10-26026 October 2004 RAI - Revision to Facility Operating License and Technical Specifications - Extended Power Uprate Request Project stage: RAI W3F1-2004-0089, Supplement to Amendment Request NPF-38-2492004-10-29029 October 2004 Supplement to Amendment Request NPF-38-249 Project stage: Supplement 2004-03-04
[Table View] |
|
---|
Category:Letter type:W
MONTHYEARW3F1-2023-0056, Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242023-12-19019 December 2023 Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 W3F1-2023-0055, Reply to a Notice of Violation2023-12-14014 December 2023 Reply to a Notice of Violation W3F1-2023-0052, Core Operating Limits Report (COLR) - Cycle 26, Revision O2023-11-0707 November 2023 Core Operating Limits Report (COLR) - Cycle 26, Revision O W3F1-2023-0049, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal2023-09-28028 September 2023 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal W3F1-2023-0048, Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2023-09-25025 September 2023 Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program W3F1-2023-0036, Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2023-05-0404 May 2023 Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0032, Annual Radioactive Effluent Release Report (ARERR) 20222023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) 2022 W3F1-2023-0033, Submittal of Annual Radiological Environmental Operating Report - 20222023-04-27027 April 2023 Submittal of Annual Radiological Environmental Operating Report - 2022 W3F1-2023-0025, Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.22062023-04-11011 April 2023 Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.2206 W3F1-2023-0018, Updated Final Supplemental Response to NRC Generic Letter 2004-022023-03-30030 March 2023 Updated Final Supplemental Response to NRC Generic Letter 2004-02 W3F1-2023-0022, Registration of Dry Fuel Storage Cask Use2023-03-22022 March 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0021, Submittal of Special Report SR 2023-003-00 Radiation Monitor Inoperable Greater than 7 Days2023-03-17017 March 2023 Submittal of Special Report SR 2023-003-00 Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0016, Registration of Dry Fuel Storage Cask Use2023-03-0303 March 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0014, Reply to a Notice of Violation; EA-22-1192023-02-20020 February 2023 Reply to a Notice of Violation; EA-22-119 W3F1-2023-0013, Notification of Readiness for Supplemental Inspection2023-02-15015 February 2023 Notification of Readiness for Supplemental Inspection W3F1-2023-0007, Registration of Dry Fuel Storage Cask Use2023-02-0606 February 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0010, Special Report SR 2023-002-00, Radiation Monitor Inoperable Greater than 7 Days2023-01-25025 January 2023 Special Report SR 2023-002-00, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0002, SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days2023-01-0505 January 2023 SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days W3F1-2022-0067, Commitment Change Notification for Generic Safety Issue 191 and Generic Letter 2004-022022-12-20020 December 2022 Commitment Change Notification for Generic Safety Issue 191 and Generic Letter 2004-02 W3F1-2022-0054, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability2022-11-0101 November 2022 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability W3F1-2022-0063, Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 372022-10-27027 October 2022 Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 37 W3F1-2022-0059, Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-5052022-10-13013 October 2022 Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-505 W3F1-2022-0058, Reply to a Notice of Violation; EA-22-0332022-10-12012 October 2022 Reply to a Notice of Violation; EA-22-033 W3F1-2022-0049, Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-5052022-08-19019 August 2022 Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 W3F1-2022-0037, Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242022-08-0808 August 2022 Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 W3F1-2022-0044, SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-07-0606 July 2022 SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2022-0042, SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-06-27027 June 2022 SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2022-0015, Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf.2022-05-16016 May 2022 Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf. W3F1-2022-0026, Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 20222022-04-28028 April 2022 Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 2022 W3F1-2022-0028, Annual Radiological Environmental Operating Report - 20212022-04-26026 April 2022 Annual Radiological Environmental Operating Report - 2021 W3F1-2022-0029, Annual Report of Individual Monitoring of Radiation Exposure for 2021 Per 10 CFR 20.22062022-04-26026 April 2022 Annual Report of Individual Monitoring of Radiation Exposure for 2021 Per 10 CFR 20.2206 W3F1-2022-0009, Supplement to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors2022-04-25025 April 2022 Supplement to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors W3F1-2022-0031, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Reflect Location of Standby Capsules 3/W-104 and 6/W-2842022-04-25025 April 2022 Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Reflect Location of Standby Capsules 3/W-104 and 6/W-284 W3F1-2022-0020, Review of Preliminary Accident Sequence Precursor Report2022-04-11011 April 2022 Review of Preliminary Accident Sequence Precursor Report W3F1-2022-0017, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 20212022-04-0707 April 2022 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2021 W3F1-2022-0019, WAT-2022-02 Post Exam Analysis2022-03-0909 March 2022 WAT-2022-02 Post Exam Analysis W3F1-2022-0011, Special Report SR-22-002-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-02-0808 February 2022 Special Report SR-22-002-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2022-0008, SR-22-001-00, Waterford Steam Electric Station, Unit 3, Radiation Monitors Inoperable Greater than 7 Days2022-02-0101 February 2022 SR-22-001-00, Waterford Steam Electric Station, Unit 3, Radiation Monitors Inoperable Greater than 7 Days W3F1-2021-0074, Commitment Change Notification for Generic Safety Issue - 191 and Generic Letter 2004-022021-12-16016 December 2021 Commitment Change Notification for Generic Safety Issue - 191 and Generic Letter 2004-02 W3F1-2021-0064, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 2842021-11-30030 November 2021 Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 284 W3F1-2021-0061, Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual2021-10-14014 October 2021 Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual W3F1-2021-0063, Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial Emergency Preparedness Evaluated Exercise Requirements Due to Severe Storm Recovery2021-10-12012 October 2021 Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial Emergency Preparedness Evaluated Exercise Requirements Due to Severe Storm Recovery W3F1-2021-0050, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt2021-10-0101 October 2021 Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt W3F1-2021-0060, Response to Request for Additional Information Regarding License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual2021-09-30030 September 2021 Response to Request for Additional Information Regarding License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual W3F1-2021-0039, Application for Technical Specification Change to Revise Pressure/Temperature and Low Temperature Overpressure Protection for 55 Effective Full Power Years2021-08-25025 August 2021 Application for Technical Specification Change to Revise Pressure/Temperature and Low Temperature Overpressure Protection for 55 Effective Full Power Years W3F1-2021-0055, Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual2021-08-20020 August 2021 Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual W3F1-2021-0057, (Waterford 3) - Emergency Plan Revision 0522021-08-18018 August 2021 (Waterford 3) - Emergency Plan Revision 052 W3F1-2021-0054, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System, Dated July 23, 20202021-07-29029 July 2021 License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System, Dated July 23, 2020 W3F1-2021-0051, Revised Licensing Technical Report for the Common Q Core Protection Calculator System - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator System and Control Element Assembly Calculator2021-07-19019 July 2021 Revised Licensing Technical Report for the Common Q Core Protection Calculator System - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator System and Control Element Assembly Calculator 2023-09-28
[Table view] Category:Report
MONTHYEARW3F1-2023-0056, Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242023-12-19019 December 2023 Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation W3F1-2022-0042, SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-06-27027 June 2022 SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2021-0064, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 2842021-11-30030 November 2021 Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 284 CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L W3F1-2021-0050, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt2021-10-0101 October 2021 Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt ML21272A3032021-09-30030 September 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Westinghouse Evinci; Micro-Reactor Tabletop Exercise Report ML21237A0512021-08-25025 August 2021 Follow-on Risk Informed Performance Based Implementation Guidance Needed for Advanced Non-Light Water Reactors ML21081A1922021-06-30030 June 2021 Enclosure - USNRC-CNSC Joint Report Concerning X-Energy's Reactor Pressure Vessel Construction Code Assessment W3F1-2021-0004, License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual2021-04-0505 April 2021 License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual ML21272A3382021-04-0101 April 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Versatile Test Reactor Ticap Tabletop Exercise Report ML21090A0332021-03-31031 March 2021 Historical Context and Perspective on Allowable Stresses and Design Parameters in ASME Section III, Division 5, Subsection Hb, Subpart B (ANL/AMD-21/1) ML21083A1362021-03-23023 March 2021 Completed Activities ML21083A1412021-03-22022 March 2021 Strategy 3 ML21083A1372021-03-22022 March 2021 NEIMA Reporting ML21083A1442021-03-22022 March 2021 Strategy 6 ML21083A1382021-03-22022 March 2021 Rulemaking ML21083A1392021-03-22022 March 2021 Strategy 1 ML21083A1402021-03-22022 March 2021 Strategy 2 ML21083A1432021-03-22022 March 2021 Strategy 5 ML21083A1422021-03-22022 March 2021 Strategy 4 W3F1-2021-0015, Revised Vendor Oversight Plan Summary - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-01-29029 January 2021 Revised Vendor Oversight Plan Summary - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System ML21014A2672021-01-14014 January 2021 Preapplication Engagement to Optimize Application Reviews January 12 Version - Copy W3F1-2020-0038, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2020-07-23023 July 2020 License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System W3F1-2019-0043, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 20182019-07-0101 July 2019 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2018 W3F1-2019-0022, Resubmittal of Reactor Vessel Material Surveillance Program Capsule Test Results2019-03-14014 March 2019 Resubmittal of Reactor Vessel Material Surveillance Program Capsule Test Results ML18275A2342018-12-27027 December 2018 NRC Record of Decision for the License Renewal Application for Waterford, Unit 3 W3F1-2018-0029, Submittal of Annual Report on Westinghouse Electric Co., LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 20172018-06-0707 June 2018 Submittal of Annual Report on Westinghouse Electric Co., LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2017 ML17163A1852017-06-30030 June 2017 Biological Evaluation of Impacts to Federally Listed Species for Waterford License Renewal W3F1-2017-0042, Focused Evaluation of External Flooding2017-05-17017 May 2017 Focused Evaluation of External Flooding ML17023A2822017-02-27027 February 2017 Flood Hazard Mitigating Strategies Assessment ML16308A4472016-10-19019 October 2016 Final ASP Program Analysis Precursor for Waterford Steam Electric Station, Unit 3 Re. Both Emergency Diesel Generators Declared Inoperable (LER 382-2015-007) ML15268A0202015-09-23023 September 2015 Attachment 3, Fuel Thermal Conductivity Degradation Evaluation (Non-Proprietary) W3F1-2015-0042, Attachment 2 to WF3-CS-15-00010, Rev. 0, Document 51-9227040-000, Fukushima Flood Hazard Reevaluation Report, Pp. 3-147 Through the End2015-07-21021 July 2015 Attachment 2 to WF3-CS-15-00010, Rev. 0, Document 51-9227040-000, Fukushima Flood Hazard Reevaluation Report, Pp. 3-147 Through the End ML15204A3242015-07-21021 July 2015 Attachment 2 to WF3-CS-15-00010, Rev. 0, Document 51-9227040-000, Fukushima Flood Hazard Reevaluation Report, Pp. 3-62 Through 3-146 ML15204A3232015-07-21021 July 2015 Attachment 2 to WF3-CS-15-00010, Rev. 0, Document 51-9227040-000, Fukushima Flood Hazard Reevaluation Report, Pp. 1 Through 3-61 ML14129A3502014-04-29029 April 2014 Report of Facility Changes, Tests and Experiments and Commitment Changes for Two Year Period Ending April 25, 2014 ML13220A4022013-11-22022 November 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML13317A9692013-11-20020 November 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Waterford Steam Electric Generating Station, Unit 3, TAC No.: MF0977 W3F1-2013-0054, CFR 71.95 Report on Issues Involving Radwaste Cask 8-120B2013-09-0909 September 2013 CFR 71.95 Report on Issues Involving Radwaste Cask 8-120B W3F1-2013-0027, Closure Option for Generic Safety Issue - 1912013-05-16016 May 2013 Closure Option for Generic Safety Issue - 191 ML13120A4642013-03-25025 March 2013 Engineering Report WF3-CS-12-00003, Attachment C, Rev. 0, Safety Injection Sump Outlet Header B Isolation, Enclosure to W3F1-2013-0024, Pages 312 - 591 of 1014 W3F1-2013-0024, Engineering Report WF3-CS-12-00003, Attachment D, Rev. 0, Area Walk-by Checklists (Awcs), Enclosure to W3F1-2013-0024, Pages 592 - 817 of 10142013-03-25025 March 2013 Engineering Report WF3-CS-12-00003, Attachment D, Rev. 0, Area Walk-by Checklists (Awcs), Enclosure to W3F1-2013-0024, Pages 592 - 817 of 1014 ML13120A4622013-03-25025 March 2013 Engineering Report WF3-CS-12-00003, Attachment G, Rev. 0, Peer Review Checklist for SWEL, Enclosure to W3F1-2013-0024, Pages 820 - 1014 of 1014 ML13120A4612013-03-25025 March 2013 Engineering Report WF3-CS-12-00003, Revision 1, Wateford, Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Enclosure to W3F1-2013-0024, Pages 1 - 311 of 1014 CNRO-2013-00002, Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-01-29029 January 2013 Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments W3F1-2012-0100, WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 22012-11-16016 November 2012 WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 2 ML12333A2772012-11-16016 November 2012 WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 1 ML12333A2752012-11-16016 November 2012 WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 5 ML12333A2742012-11-16016 November 2012 WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 4 2023-12-19
[Table view] Category:Technical
MONTHYEARW3F1-2021-0064, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 2842021-11-30030 November 2021 Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 284 W3F1-2021-0050, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt2021-10-0101 October 2021 Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt ML21272A3032021-09-30030 September 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Westinghouse Evinci; Micro-Reactor Tabletop Exercise Report ML21237A0512021-08-25025 August 2021 Follow-on Risk Informed Performance Based Implementation Guidance Needed for Advanced Non-Light Water Reactors ML21081A1922021-06-30030 June 2021 Enclosure - USNRC-CNSC Joint Report Concerning X-Energy's Reactor Pressure Vessel Construction Code Assessment W3F1-2021-0004, License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual2021-04-0505 April 2021 License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual ML21272A3382021-04-0101 April 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Versatile Test Reactor Ticap Tabletop Exercise Report ML21090A0332021-03-31031 March 2021 Historical Context and Perspective on Allowable Stresses and Design Parameters in ASME Section III, Division 5, Subsection Hb, Subpart B (ANL/AMD-21/1) W3F1-2021-0015, Revised Vendor Oversight Plan Summary - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-01-29029 January 2021 Revised Vendor Oversight Plan Summary - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System W3F1-2020-0038, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2020-07-23023 July 2020 License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System W3F1-2019-0022, Resubmittal of Reactor Vessel Material Surveillance Program Capsule Test Results2019-03-14014 March 2019 Resubmittal of Reactor Vessel Material Surveillance Program Capsule Test Results ML17163A1852017-06-30030 June 2017 Biological Evaluation of Impacts to Federally Listed Species for Waterford License Renewal ML15268A0202015-09-23023 September 2015 Attachment 3, Fuel Thermal Conductivity Degradation Evaluation (Non-Proprietary) ML13220A4022013-11-22022 November 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML13317A9692013-11-20020 November 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Waterford Steam Electric Generating Station, Unit 3, TAC No.: MF0977 W3F1-2013-0024, Engineering Report WF3-CS-12-00003, Attachment D, Rev. 0, Area Walk-by Checklists (Awcs), Enclosure to W3F1-2013-0024, Pages 592 - 817 of 10142013-03-25025 March 2013 Engineering Report WF3-CS-12-00003, Attachment D, Rev. 0, Area Walk-by Checklists (Awcs), Enclosure to W3F1-2013-0024, Pages 592 - 817 of 1014 ML13120A4642013-03-25025 March 2013 Engineering Report WF3-CS-12-00003, Attachment C, Rev. 0, Safety Injection Sump Outlet Header B Isolation, Enclosure to W3F1-2013-0024, Pages 312 - 591 of 1014 ML13120A4622013-03-25025 March 2013 Engineering Report WF3-CS-12-00003, Attachment G, Rev. 0, Peer Review Checklist for SWEL, Enclosure to W3F1-2013-0024, Pages 820 - 1014 of 1014 ML13120A4612013-03-25025 March 2013 Engineering Report WF3-CS-12-00003, Revision 1, Wateford, Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Enclosure to W3F1-2013-0024, Pages 1 - 311 of 1014 ML12333A2722012-11-16016 November 2012 WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 3 W3F1-2012-0100, WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 22012-11-16016 November 2012 WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 2 ML12333A2772012-11-16016 November 2012 WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 1 ML12333A2752012-11-16016 November 2012 WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 5 ML12333A2742012-11-16016 November 2012 WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 4 ML12181A4152012-06-28028 June 2012 Attachment 1 to W3F1-2012-0049, Analysis of Proposed Operating License Change, Section 4.0 Through 6.0 W3F1-2012-0040, Technical Specification Bases Update to the NRC for the Period November 1, 2011 Through April 30, 20122012-05-30030 May 2012 Technical Specification Bases Update to the NRC for the Period November 1, 2011 Through April 30, 2012 ML1005506072010-02-28028 February 2010 WCAP-17187-NP, Technical Justification for Eliminating Pressurizer Surge Line Rupture as the Structural Design Basis for Waterford Steam Electric Station, Unit 3 Using Leak-Before-Break Methodology, Enclosure 2 to W3F1-2010-0003 ML0918312592009-06-24024 June 2009 Attachment 6 to W3F1-2009-0022, HI-2094376, Rev. 0, Licensing Report for Waterford, Unit 3 Spent Fuel Pool Criticality Analysis ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 W3F1-2008-0039, Steam Generator Conditions Observed at Waterford 32008-05-20020 May 2008 Steam Generator Conditions Observed at Waterford 3 W3F1-2008-0018, Attachment 2, Supplemental Response to NRC Generic Letter 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, (Non-Proprietary Version)2008-02-29029 February 2008 Attachment 2, Supplemental Response to NRC Generic Letter 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, (Non-Proprietary Version) W3F1-2007-0045, Supplement to the ECCS Performance Analysis Submittal in Support of Next Generation Fuel - 1999 EM Optional Steam Cooling Model Justification2007-10-0404 October 2007 Supplement to the ECCS Performance Analysis Submittal in Support of Next Generation Fuel - 1999 EM Optional Steam Cooling Model Justification CNRO-2006-00039, Results of the Waterford 3 Pressurizer Flaw Evaluation2006-08-31031 August 2006 Results of the Waterford 3 Pressurizer Flaw Evaluation ML0523803522005-08-25025 August 2005 Steam Generator Tube Inspection Results for the 2003 Outage W3F1-2005-0045, 60-Day Report for Waterford Steam Electric Station, Unit 3 Reactor Pressure Vessel Head and Pressurizer Inspection for the Spring 2005 Refueling Outage2005-07-19019 July 2005 60-Day Report for Waterford Steam Electric Station, Unit 3 Reactor Pressure Vessel Head and Pressurizer Inspection for the Spring 2005 Refueling Outage ML0513702182005-05-17017 May 2005 Pgs. 1-61 Waterford 3 EAL Basis Document (W3-EP-001-001 Rev. Xx) ML0513702362005-05-16016 May 2005 Pgs. 62-123 Waterford 3 EAL Basis Document (W3-EP-001-001 Rev. Xx) W3F1-2005-0025, Holtec Licensing Report Errors2005-04-15015 April 2005 Holtec Licensing Report Errors W3F1-2004-0101, to Amendment Request NPF-38-256, Alternate Source Term, Waterford Steam Electric Station, Unit 32004-10-19019 October 2004 to Amendment Request NPF-38-256, Alternate Source Term, Waterford Steam Electric Station, Unit 3 W3F1-2004-0075, Reissue of Report BAW-2177, Analysis of Capsule W-97 Entergy Operations, Inc. Waterford Generating Station Unit 3 - Reactor Vessel Material Surveillance Program2004-09-13013 September 2004 Reissue of Report BAW-2177, Analysis of Capsule W-97 Entergy Operations, Inc. Waterford Generating Station Unit 3 - Reactor Vessel Material Surveillance Program W3F1-2004-0044, Small Break Loss-of-Coolant Accident Emergency Core Cooling System Performance Analysis2004-05-26026 May 2004 Small Break Loss-of-Coolant Accident Emergency Core Cooling System Performance Analysis ML0414101032004-04-0202 April 2004 Faxed on 04/02/94 to T.Alexion - Entergy - Waterford, Initial Engineering Evaluation for SBLOCA with DC Bus Single Failure CNRO-2003-00049, Letter Transmitting Mark-Up of Engineering Report M-EP-2003-004, Rev. 0 Fracture Mechanics Analysis for the Assessment Potential for Primary Water Stress Corrosion Crack (PWSCC) Growth, Un-Inspected Regions..., Pages 43 Through 572003-09-26026 September 2003 Letter Transmitting Mark-Up of Engineering Report M-EP-2003-004, Rev. 0 Fracture Mechanics Analysis for the Assessment Potential for Primary Water Stress Corrosion Crack (PWSCC) Growth, Un-Inspected Regions..., Pages 43 Through 57 CNRO-2003-00038, Rev. 0 to M-EP-2003-004, Fracture Mechanics Analysis for the Assessment of the Potential for Primary Water Stress Corrosion Crack Growth Un-Inspected Regions of the Control Element Drive Mechanism At..., Appendix D, Attachment 5 Thro2003-09-15015 September 2003 Rev. 0 to M-EP-2003-004, Fracture Mechanics Analysis for the Assessment of the Potential for Primary Water Stress Corrosion Crack Growth Un-Inspected Regions of the Control Element Drive Mechanism At..., Appendix D, Attachment 5 Through Enc CNRO-2003-00030, Arkansas, Unit 2 and Waterford, Unit 3, Letter CNRO-2003-00027 to NRC, Relaxation Requests to NRC Order EA-03-009, Dated July 1, 20032003-07-24024 July 2003 Arkansas, Unit 2 and Waterford, Unit 3, Letter CNRO-2003-00027 to NRC, Relaxation Requests to NRC Order EA-03-009, Dated July 1, 2003 CNRO-2003-00020, Arkansas, Unit 2 and Waterford, Unit 3, Relaxation Requests to NRC Order EA-03-0092003-06-11011 June 2003 Arkansas, Unit 2 and Waterford, Unit 3, Relaxation Requests to NRC Order EA-03-009 W3F1-2002-0099, Ses, Report of Facility Changes, Tests & Experiments for Period from June 1, 2001 Through May 31. 20022002-11-27027 November 2002 Ses, Report of Facility Changes, Tests & Experiments for Period from June 1, 2001 Through May 31. 2002 ML19066A0671986-11-30030 November 1986 Overview Description of the Core Operating Limit Supervisory System (COLSS)(CEN-312-NP, Revision 01-NP 8701270057) ML19066A0851986-04-30030 April 1986 CPC and Methodology Changes for the CPC Improvement Program (CEN-310-NP-A 8605270198) ML15350A2151985-09-0505 September 1985 Overview Description of Core Operating Limit Supervisory System (Colss)(Rev 00-NP to CEN-312-NP) 2021-09-30
[Table view] |
Text
Entergy Operations, Inc.
0--Entergy 1340 Echelon Parkway Jackson, Mississippi 39213-8298 Tel 601-368-5758 F. G. Burford Acting Director Nuclear Safety & Licensing W3F1 -2004-0101 October 19, 2004 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Supplement 4 to Amendment Request NPF-38-256, Alternate Source Term Waterford Steam Electric Station, Unit 3 Docket No. 50-382 License No. NPF-38
REFERENCES:
- 1. Entergy Letter dated July 15, 2004, "License Amendment Request NPF-38-256, Alternate Source Term"
- 2. Entergy Letter dated August 19, 2004, "License Amendment Request NPF-38-256, Supplement to Alternate Source Term Submittal"
- 3. Entergy Letter dated September 1, 2004, "Supplement 2 to Amendment Request NPF-38-256, Alternate Source Term"
- 4. Entergy Letter dated October 13, 2004, "Supplement 3 to Amendment Request NPF-38-256, Alternate Source Term'
Dear Sir or Madam:
By letter (Reference 1), Entergy Operations, Inc. (Entergy) proposed a change to the Waterford Steam Electric Station, Unit 3 (Waterford 3) licensing basis to implement an Alternate Source Term (AST) for calculating accident offsite doses and doses to control room personnel as permitted by 10 CFR 50.67. Entergy supplemented this request via References 2, 3, and 4.
In Reference 4, Entergy committed to submit a revised AST dose analysis for the steam generator tube rupture (SGTR) event to fully account for early releases from the affected SG using both atmospheric dump valves (ADVs) for the early rapid cooldown prior to isolation.
Also, in Reference 4, Entergy committed to submit a revised AST dose analysis for the large break loss of coolant accident (LBLOCA) to not credit fission product cleanup of elemental iodine due to containment spray. The results of the revised SGTR and LBLOCA dose analysis are provided in the attachment to this letter and supersede the SGTR and LBLOCA dose analysis information previously submitted in References 1 and 3.
W3F1 -2004-01 01 Page 2 of 3 There are no new commitments in this letter. If you have any questions or require additional information, please contact Jerry Burford at 601-368-5755.
I declare under penalty of perjury that the foregoing is true and correct. Executed on October 19, 2004.
Sincerely, FGB/ M/cbh
Attachment:
Licensing Report for the Radiological Consequences of Accidents for the Waterford Steam Electric Station, Unit 3 Using Alternative Source Term Methodology cc: (See Next Page)
W3Fl -2004-0101 Page 3 of 3 cc: Dr. Bruce S. Mallett U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 NRC Senior Resident Inspector Waterford 3 P.O. Box 822 Killona, LA 70066-0751 U.S. Nuclear Regulatory Commission Attn: Mr. Nageswaran Kalyanam MS O-07D1 Washington, DC 20555-0001 Wise, Carter, Child & Caraway Attn: J. Smith P.O. Box 651 Jackson, MS 39205 Winston & Strawn Attn: N.S. Reynolds 1400 L Street, NW Washington, DC 20005-3502 Louisiana Department of Environmental Quality Office of Environmental Compliance Surveillance Division P. 0. Box 4312 Baton Rouge, LA 70821-4312 American Nuclear Insurers Attn: Library Town Center Suite 300S 29th S. Main Street West Hartford, CT 06107-2445
Attachment I W3F1 -2004-01 01 Licensing Report for the Radiological Consequences of Accidents for the Waterford Steam Electric Station, Unit 3 Using Alternative Source Term Methodology
Licensing Report for the Radiological Consequences ofAccidents for the Waterford Steam Electric Station, Unit 3 Using Alternative Source Term Methodology October 14, 2004 1
TABLE OF CONTENTS 1.0 RADIOLOGICAL CONSEQUENCES UTILIZING NUREG-1465 SOURCE TERMS ............... 3 1.1. Introduction ................................................................................................................................... 3 1.2. Common Analysis Inputs and Assumptions ............................................................. 3 1.3. Control Room Air Conditioning System and Control Room Ventilation Model ............ ............ 3 1.4. Exceptions to Regulatory Guide (RG) 1.183 ........................ ..................................... 4
2.0 CONCLUSION
S ............................................................. 5
3.0 REFERENCES
............................................................ 6 4.0 LARGE BREAK LOSS OF COOLANTACCIDENT (LBLOCA) ................................................ 7 4.1. Input Parameters and Assumptions ............................................................ 7 4.2.. R esults.......................................................................................................................................... 9 5.0 STEAM GENERATOR TUBE RUPTURE (SGTR) ........................................................... . 12 5.1. Input Parameters and Assumptions ............................................................ 14 5.2.
. . R esults....................................................................................................................................... 17 2
1.0 RADIOLOGICAL CONSEQUENCES UTILIZING NUREG-1465 SOURCE TERMS 1.1. Introduction Reference 1 submitted a license amendment request to implement an Alternate Source Term (AST) as permitted by 10CFR50.67 for calculating accident offsite doses and doses to control room personnel for Waterford 3. That submittal provided dose consequence analyses for events expected to be limiting, and noted that a second AST submittal, Reference 2, would be made to provide the results of additional analyses. Reference 3 supplemented Reference 1 with Large Break Loss of Coolant Accident (LBLOCA) Shine calculations and an amended LBLOCA offsite and control room dose analysis. Reference 4 provided additional information on the Waterford 3 AST analysis in response to the Reference 5 NRC letter. This submittal provides the following:
- An amendment to Reference 3, Section 5.0, LBLOCA, and
The LBLOCA offsite and control room dose analysis has been revised to eliminate crediting fission product scrubbing of elemental iodine due to containment spray, as discussed in Reference
- 4. The SGTR analysis has been revised based upon a more conservative interpretation of Regulatory Guide (RG) 1.183 than used in the original analysis of Reference 1. Specifically, the late releases from the affected Steam Generator (SG), in the 6.5 hour5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> to 8.0 hour0 days <br />0 hours <br />0 weeks <br />0 months <br /> timeframe when the Atmospheric Dump Valve (ADV) is being used to control level prior to Shutdown Cooling initiation, are now considered in the analysis. The SGTR analysis has also been revised to correct errors in releases which have been documented in the Waterford 3 corrective action program.
Specifically, the inputs to the analysis had terminated releases from the affected SG earlier than should have been assumed.
1.2. Common Analysis Inputs and Assumptions Common analysis inputs and assumptions are described in Section 1.2 of Attachment 2 of Reference 1. Some inputs and assumptions are identified as being specific to specific events evaluated.
1.3. Control Room Air Conditioning System and Control Room Ventilation Model The control room air conditioning system and control room ventilation model are described in Section 1.3 of Attachment 2 of Reference 1. The description includes event-specific control room unfiltered in-leakage assumptions for the events evaluated in Reference I which are not applicable to events evaluated in this submittal. Specific control room ventilation modeling changes for the SGTR reanalysis are discussed in that section of this submittal. The in-leakage assumptions for events evaluated in this submittal are:
Sequence Type Control Room Unfiltered In-leakage Modeled LBLOCA 100 CFM SGTR 100 CFM 3
1.4. Exceptions to Regulatory Guide (RG) 1.183 Exceptions applicable to this submittal are identified in Section 1.4 of Attachment 2 of References I and 3.
4
2.0 CONCLUSION
S A summary of the calculated dose consequences of all events is presented in Table 2-1. The events meet the acceptance criteria for the Exclusion Area Boundary (EAB), Low Population Zone (LPZ), and Main Control Room (MCR). SGTR results are presented for the Pre-existing Iodine Spike (PIS) and Event Generated Iodine Spike (GIS) cases.
TABLE 2-1
SUMMARY
OF RESULTS Acceptance Event Scenario Dose Consequences Criterion EAB LPZ MCR EAB&LPZIMCR LBLOCA 5.295 2.369 1.466 25/5 SGTR - PIS 0.987 0.213 4.85 25/5 SGTR-GIS 0.435 0.088 2.56 2.5/5 Notes: All Results are presented in units of rem Total Effective Dose Equivalent (TEDE).
Detailed discussions for each individual event are presented in Sections 4 and 5. The detailed analyses for each event demonstrate that radiological consequences meet the TEDE dose acceptance limits for off-site dose. The radiological consequences for MCR dose for all events are < 5 Rem TEDE.
The total dose to control room personnel from the LBLOCA inhalation dose and doses from various post-LBLOCA shine sources is also < 5 Rem TEDE. This is presented in more detail in Section 6 of Reference 3.
5
3.0 REFERENCES
- 1. W3FI-2004-0053, "License Amendment Request NPF-38-256, Alternate Source Term, Waterford Steam Electric Station, Unit 3, Docket No. 50-382, License No. NPF-38," July 15, 2004.
- 2. W3FI-2004-0071, "License Amendment Request NPF-38-256, Alternate Source Term, Waterford Steam Electric Station, Unit 3, Docket No. 50-382, License No. NPF-38,"
August 19, 2004
- 3. W3Fl-2004-0073, "License Amendment Request NPF-38-249, Extended Power Uprate, Waterford Steam Electric Station, Unit 3, Docket No. 50-382, License No. NPF-38,"
September 1, 2004.
- 4. W3FI-2004-0095, "Supplement 3 to Amendment Request NPF-38-256, Alternate Source Term, Waterford Steam Electric Station, Unit 3, Docket No. 50-382, License No. NPF-38," October 13, 2004.
- 5. Letter from N. Kalyanam (NRC) to J. Venable (Entergy), "Waterford Steam Electric Station, Unit 3 (Waterford 3) - Request for Additional Information Related to Revision to Facility Operating License and Technical Specifications - Extended Power Uprate Request (TAC NO. 1355) and Alternate Source Term Request (MC3789)," September 29, 2004.
- 6. W3FI-2003-0074, "License Amendment Request NPF-38-249, Extended Power Uprate, Waterford Steam Electric Station, Unit 3, Docket No. 50-3 82, License No. NPF-3 8,"
November 13, 2003.
6
4.0 LARGE BREAK LOSS OF COOLANT ACCIDENT (LBLOCA)
The LBLOCA dose analysis has been revised to eliminate crediting fission product scrubbing of elemental iodine due to containment spray.
The design basis LBLOCA is postulated as a break in the reactor coolant pressure boundary piping. An abrupt failure of the main reactor coolant piping is assumed to occur and it is assumed that the Emergency Core Cooling System (ECCS) fails to prevent the core from experiencing significant degradation. This is considered a Limiting Fault event. Activity from the core is released to containment and subsequently to the environment by means of containment leakage or leakage from the ECCS. Release of core radioactive inventory to the containment is postulated in accordance with RG 1.183 guidance on activity release and timing for the gap fraction release and early-in vessel release phases.
Other than adoption of the RG 1.183 methodology, the LBLOCA dose analysis is relatively unchanged compared to the analysis presented in Extended Power Uprate (EPU) Licensing Amendment Request, Reference 6.
4.1. Input Parameters and Assumptions The input parameters and assumptions are listed in Table 4-1. Certain assumptions are discussed in additional detail below.
4.1.1. Source Term Table 1-1 of Reference 1 documents the core inventory assumed for the LBLOCA radiological dose calculations. Two separate ORIGEN calculations were conducted for the Waterford 3 EPU project to provide core inventories. One calculation was performed to determine the gap fission product activities in peak power rods. A second calculation was performed to determine the core-wide fission product inventory. There was generally good agreement between these two calculations, with their slightly separate biases. A LOCA source term (Table 1-1 of Reference 1) was constructed using the more conservative (larger) value of core inventory from the two sources. Several isotopes are modeled in RADTRAD for which inventories were not calculated in the ORIGEN calculations. For those isotopes, the default Pressurized Water Reactor (PWR) core inventories (on a Ci/MWt basis) from NUREG/CR-6604 were assumed.
The release fractions applied to the various species of fission products are consistent with Table 2 of RG 1.183 for PWR core inventory fraction releases for the gap release phase and early in-vessel phase of release. Timing of the release phases is from Table 4 of RG 1.183 for LOCA release phase timing. This information is documented in Table 4-2.
The reactor coolant initial activity is insignificant in comparison with the releases due to the postulated core damage for this event.
4.1.2. Iodine Chemical Form As listed in Table 4-2, iodine released to containment is assumed to be 95% aerosol/particulate, 4.85% elemental, and 0.15% organic. This is consistent with Section 3.5 of RG 1.183.
The radioiodine postulated to be available for release to the environment through Engineered Safety Feature (ESF) leakage is assumed to be 97% elemental and 3% organic. This is consistent with Section 5.6 of RG 1.183 Appendix A.
7
4.1.3. Release Pathways Activity from the reactor coolant system and the failed core is released into the containment.
Releases are postulated from the containment to the environment by three containment air leakage pathways (Reactor Auxiliary Building (RAB)/Controlled Ventilation Areas System (CVAS), Shield Building, and Direct Bypass) and by leakage from ESF systems (safety injection and containment spray) which take suction, upon recirculation, from the safety injection sump.
The fraction of the release associated with each of the three containment air leakage pathways is specified in Table 1-2 of Reference 1.
The containment is modeled as a sprayed and an unsprayed region, where the sprayed region is subject to fission product removal due to the action of the containment sprays (80% of the containment volume is assumed subject to containment spray). Consistent with RG 1.183, Appendix A, a mixing rate due to natural convection between the sprayed and unsprayed regions of containment can be assumed to equal two turnovers of the unsprayed region per hour; this assumption has been adopted for the LBLOCA dose calculation. This is considered a conservative assumption since at least one containment fan cooler is assumed available, providing forced circulation mixing within the containment.
The containment is assumed to leak at the design rate of 0.50 wv/o per day for the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and at half that rate (0.25 w/o per day) thereafter. This is consistent with RG 1.183, Appendix A.
Direct bypass releases are assumed to be released unfiltered directly to the environment.
Releases to the area of the RAB serviced by the CVAS are assumed to be filtered and directly released to the environment; no credit is taken for holdup in the RAB. Shield Building holdup and dilution is modeled. A Shield Building Ventilation System (SBVS) maximum flow rate of 11,000 CFM per train is modeled. It is assumed that when one train is operating, flow is induced in the second train, which is assumed to be unfiltered. The Shield Building pressure transient following a LBLOCA is documented in UFSAR Figures 6.2-47a and 6.2-47b. Conservatively, when the SBVS is in exhaust mode releasing to the environment, a total flow of 24,244 CFM is assumed with an 89.8% filter efficiency; this very conservatively assumes that even though each train is operating, it is also inducing the unfiltered flow. When the SBVS is in recirculation, only a nominal flow rate of 10,000 CFM is assumed and it is assumed that only one train is operating.
Thus, the modeling of the SBVS is very conservative. A small effective exhaust flow of approximately 35 CFM is assumed for long-term operation of the SBVS (i.e., beyond about 43 hours4.976852e-4 days <br />0.0119 hours <br />7.109788e-5 weeks <br />1.63615e-5 months <br />); the remaining flow, based on the nominal 10,000 CFM flow rate, is assumed to be in recirculation. After 168 hours0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br />, the SBVS is assumed to be exhausting to account for the postulated failure of the containment maintenance hatch seal.
The analysis considers a leak rate of 0.5 GPM from ECCS systems that are recirculated and may leak to locations serviced by the CVAS system in the RAB. While no credit is taken for holdup and dilution in the RAB, CVAS filtration is credited. A flashing fraction of 10% is assumed, consistent with RG 1.183. The release is assumed to begin at the postulated earliest time before ECCS recirculation of 23.4 minutes.
4.1.4. Removal Coefficients Containment spray removal coefficients consistent with NUREG-0800, Section 6.5.2 are assumed. One train of Containment Spray is assumed to operate following a LOCA, with a minimum flow rate of 1750 GPM. These values are documented in Table 4-1. Removal of elemental iodine from containment atmosphere is not modeled for the purpose of determining off-8
site dose or dose due to radionuclides entering the control room. For determination of control room shine doses, a maximum Partition Factor (PF) of 200 has been assumed; this occurs at 1.8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. The removal coefficient for particulate/aerosol iodine is assumed, consistent with NUREG-0800, to decrease by a factor of ten when the airborne inventory has dropped to 2% of the total particulate iodine released to the containment (a PF of 50). This also occurs after 1.8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. The responses to Questions 23 and 24 in Reference 4 provide additional detail regarding the modeling of removal of fission products by containment spray for LBLOCA.
Per RG 1.183 Appendix A Section 3.2, reduction of airborne activity by natural deposition within the containment may be credited for LOCA. The Powers 10% Aerosol Deposition is specified for natural deposition of aerosols/particulates. This model is described in NUREG/CR-6604. The lower bound of this deposition model (10th percentile) is specified. Use of this model is consistent with RG 1.183, Appendix A, Section 3. The guidance of NUREG-0800, Section 6.5.2 is applied for natural deposition of elemental iodine. Natural deposition removal coefficients are documented in Table 4-1.
4.1.5. Main Control Room Model The MCR ventilation model is described in Section 1.3 of Reference 1. The LBLOCA dose model assumes an unfiltered in-leakage of 100 CFM for the event duration. It is assumed that the preferred control room intake is selected at two hours into the event, at which time the operators also initiate the pressurized mode of control room operation. However, no credit is taken in this event scenario for the lower in-leakage during the pressurized mode of operation.
4.2. Results The radiological consequence results in Rem TEDE are listed below and compared with the acceptance criteria for LOCA provided by RG 1.183 and 10CFR50.67:
LBLOCALBLOCAAcceptance Criteria EAB (worst two hour dose) 5.295 25 Rem TEDE LPZ (worst 30 day duration) 2.369 25 Rem TEDE MCR 1.466 5 Rem TEDE Thus, the radiological consequences for LBLOCA are < 25 Rem TEDE for the EAB and LPZ doses and < 5 Rem TEDE for the MCR, based on a maximum control room unfiltered in-leakage of 100 CFM.
9
TABLE 4-1 ASSUMPTIONS USED FOR LBLOCA RADIOLOGICAL ANALYSIS Core Power Level: 3735 MWt Containment Leak Rate: 0.50 % volume/day (0-24 hours) 0.25 % volume/day (24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> - 30 days)
Natural Deposition:
Elemental 0.40/hr Organic 0 Particulate Powers 10% Aerosol Decontamination Factor Spray Fission Product Removal (LBLOCA):
Elemental Organic 0 Particulate 3.596/hr (until PF = 50) 0.3596/hr (once PF > 50)
- Shine dose calculations assume 20/hr with a maximum PF of 200.
Containment Mixing Rate Between Sprayed and 17,122 CFM Unsprayed Regions:
Maximum Spray Delay Time: 60 seconds Containment Leakage Pathway:
Controlled Ventilation Area System (CVAS)
Filtration (Reactor Auxiliary Building) 54%
Shield Building 40%
Unfiltered Direct Bypass 6%
Control Room Parameters See Table 1-2 of Reference 1 Main Control Room X/Q Assumed:
Time Unfiltered In-leakage Pressurization Flow 0-2 hr 2.77E-03 2.77E-03 2-8 hr 1.78E-03 3.90E-04*
8-24 hr 7.22E-04 1.79E-04*
1-4 days 5.27E-04 1.37E-04*
4-30 days 4.05E-04 1.08E-04*
- factor of 4 reduction credited per SRP 6.4.
10
TABLE 4-2 SOURCE TERM ASSUMPTIONS: LBLOCA RADIOLOGICAL ANALYSIS Core Inventory Fraction Released into Containment:
Group Gap Release Phase Early In-Vessel Phase Noble Gas 0.05 0.95 Halogens 0.05 0.35 .
Alkali Metals 0.05 0.25 Tellurium Metals 0.00 0.05 Ba, Sr 0.00 0.02 Noble Metal 0.00 0.0025 Cerium group 0.00 0.0005 Lanthanides 0.00 0.0002 LOCA Release Phases:
Phase Onset Duration Gap Release 30 sec 0.5 hr Early In-Vessel 0.5 hr 1.3 hr Iodine Chemical Form (release to containment):
Aerosol/Particulate 95%
Elemental 4.85%
Organic 0.15%
Iodine Chemical Form (ESF system leakage):
Elemental 97%
Organic 3%
11
Time (sec.) Event 0.0 SG tube rupture occurs 442.7 Core protection calculator hot leg saturation trip condition reached 445.4 Trip breakers open 449 Loss of off-site power 450 SG ADVs open 485 Safety injection actuation signal
>875 Operator takes manual control of SG ADVs. Plant cooldown initiated by steaming using ADV of both SGs.
1980 Operator isolates affected SQ terminating cooldown release from ADV of affected SG, 23630 Operator opens ADV to the affected SG as needed to maintain level below 94% wide range.
28800 Shutdown cooling entry conditions achieved; release stopped.
As described in EPU Licensing Amendment Request, Section 2.13.6.3, the SGTR analysis assumes that a LOOP occurs 3 seconds after reactor trip. This is consistent with the assumption made on other plants and included in CESSAR FSAR Chapter 15. On the basis that no fuel failure occurs for the event, the radiological analyses would be insensitive to this assumption for the Waterford 3 design.
As described in EPU Licensing Amendment Request, Section 2.13.6.3.2, during the SGTR, a total of 325,700 Ibm of primary coolant passes through the rupture into the affected SG Prior to reactor trip, both SGs are steaming normally to the condenser. Due to the high PFs and to the release geometry, releases from this source do not contribute to MCR dose. Following reactor trip, both SGs are steamed through the ADVs. The operator takes manual control of the ADVs at approximately 875 seconds and uses the ADVs on both SGs to cooldown the plant; at 1980 seconds the affected SG is isolated. 139,000 Ibm of steam is released from the affected SG between trip and 1980 seconds. Note that although the EPU Licensing Amendment Request documents operator action to open the ADV to the affected SG to maintain level below 94%,
other operator actions are available in the EOPs to maintain SG level and prevent SG overfill.
These late releases, between 6.5 and 8.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> in the event scenario, are included in the analysis.
Thus, all releases from both generators until shutdown cooling is entered are considered. There are no subsequent releases from shutdown cooling entry until achieving cold shutdown. A total of 245,600 Ibm of steam is released through the ADV of the affected SG during the cooldown.
The majority of the cooldown of the plant is performed by steaming the unaffected SG A total of 910,100 Ibm of steam is released through the unaffected generator's ADV during the plant cooldown. Radioactivity release through the intact SG is assumed due to primary-to-secondary SG tube leakage of 0.375 gpm per generator (540 gpd). Once shutdown cooling is initiated, there are no further releases postulated from the SGs.
13
5.1.4. Removal Coefficients Iodine releases to the affected SG are assumed to flash to vapor whenever the top of the SG U-tubes are uncovered and are available for release without mitigation. The flashing fraction is based on the difference between the primary side fluid enthalpy and the saturation enthalpy on the secondary side.
An iodine PF of 100 is assumed for activity transported to the secondary side prior to reactor trip.
The un-flashed portion of the tube rupture flow mixes with the SG inventory and is released with a PF of 100. RG 1.183, Appendix F, for PWR SGTR, endorses the Appendix E, Position 5.5.4 which calls for assuming an iodine PF of 100.
A PF of 100 is assumed for the 0.375 gpm primary-to-secondary leak rate assumed for the unaffected SG Prior to reactor trip, any releases from the condenser could be assumed to have an iodine PF of 100 applied to those releases. Credit for additional iodine removal in the condenser is not assumed. The pre-trip releases from the condenser are assumed to contribute only to off-site dose as discussed in Section 5.1.5 below.
All noble gas release to the secondary side is assumed to be immediately released to the environment.
5.1.5. Main Control Room Model The MCR ventilation model is described in Section 1.3 of Reference 1. The SGTR dose model for secondary steaming assumes an unfiltered in-leakage of 100 CFM. It is assumed that the preferred control room intake is selected when pressurization flow is established.
The analyses assume a maximum control room filtered intake flow of 225 CFM and a minimum control room filtered intake flow of 0 CFM for the duration of the event. These are mutually exclusive but bounding assumptions.
Due to geometry considerations, the pre-trip releases from the condenser are assumed to contribute only to the off-site dose consequences. Because the condenser release point and the worst case ADV release locations are in the opposite directions from the worst case control room air intake, and since the MCR envelope is isolated on any high radiation signal prior to the radiation entering the envelope, releases from the condenser are not assumed to contribute to the control room dose. Were wind speed and direction conditions such that releases from the condenser were to be directed to the MCR air intakes, the atmospheric dispersion factors for the ADVs would be greatly reduced. Also, the control room would be isolated on a high radiation signal prior to any of the release entering the control room envelope. Thus, any scenario involving releases from the condenser to the MCR would be less limiting than scenarios involving worst case atmospheric dispersion factors for releases from the ADVs to the control room.
Because the control room envelope would be isolated on a high radiation signal prior to any of the release reaching the envelope, the main control room ventilation system is assumed to be in either of its radiological emergency modes (pressurized or recirculation) once the ADVs open for the subsequent duration of the event.
15
At 450 seconds, the ADVs (and MSSVs) first open following the plant scram. It is assumed that all releases from the main steam lines are through the ADVs, which have worse (higher) X/Q values than the MSSVs. The 5% probability level XIQ values for the ADVs to the two control room intakes are:
MICR Atmospheric Dispersion Factors, x/Q (s/rn)
East ADV to East ADV to 'Vest ADV to WVest ADV to East MCR 'Vest MCR East MCR NVest MICR Time Air Intake Air Intake Air Intake Air Intake 450 s - 2 hrs 1.06E-01 1.23E-03 1.36E-03 7.50E-03 2-8 hrs 7.45E-02 8.3 1E-04 8.29E-04 5.62E-03 The unfiltered in-leakage to the control room will be conservatively assumed to be subject to the worst case X/Q values, i.e., those for East ADV releases to East MCR Air Intake. Since about 98% of the releases are from SG #1, that is assumed to be the East SGQ and it is assumed to be the source for all of the activity for the unfiltered in-leakage. This X/Q for the East ADV to the East MCR intake is applied to the entire unfiltered in-leakage for the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period for which a release is postulated.
The Waterford 3 control room will be placed in recirculation mode automatically upon either a high radiation signal or a Safety Injection Actuation Signal (SIAS). Operator action is required to pressurize the control room. Note that per NUREG-0800, Section 6.4, operator action to switch the assumed location of the control room emergency air intake to the more favorable location may be assumed. Because the dominant unfiltered inleakage term assumes the less favorable MCR air intake location, per NUREG-0800, a X/Q corresponding to the X/Q for the more favorable intake, divided by a factor of 4, may be assumed for the pressurization flow. Operators would diagnose which SG has been subject to the tube rupture and use the MCR Air Intake least impacted by releases from the ADV of the affected SG Thus, since Operator action is required to establish pressurization flow, a reduced X/Q may be applied to the pressurization flow.
MCR Atmospheric Dispersion Factors, 7/Q (s/M3 )
After Operator Action to Select Preferred Air Intake East ADV to XVest West ADV to XVest Time MCR Air Intake MCR Air Intake 0-2 hrs 3.075E-04 7.50E-03 2-8 hrs 2.0775E-04 5.62E-03 Since each SG contributes to the source of the pressurization flow, a scaled x/Q can be developed to account for the relative contribution from each of the modeled sources. Thus, for each of the three dose cases (PIS, GIS, and Noble Gas), a scaled effective X/Q can be defined as:
X/Qeff= ((RI XX/QI) + (R2 x X/Q2 ))/(RI + R2 )
16
where R; is the release fraction for each source/volume (i.e., SG, or SG2 ) and X/Qj is the corresponding atmospheric dispersion factor. The Ri values are based directly on the curie releases from the CENTS analyses documented in Section 2.13.6.3.2 of the EPU Licensing Amendment Request.
The effective control room x/Qs for the pressurization flow for each case are computed below:
X'/Q (s/M 3 ): 0-120 min 2-8 hr SG, to MCR 0.000308 0.00020775 SG2 to MCR 0.0075 0.00562 Release Fractions:
SG,, PIS 0.37030 0.26687 SG,, GIS 0.10524 0.84911 SG,, NG 0.35556 0.58939 SG 2 , PIS 0.00218 0.00638 SG 2, GIS 0.00065 0.00970 SG2 , NG 0.00134 0.00280 Effective X/Q Values (Filtered In-leakage):
PIS 0.000350 0.000334 GIS 0.000352 0.000269 NG 0.000334 0.000233 5.2. Results The radiological consequence results in Rem TEDE are listed below and compared with the acceptance criteria for SGTR provided by RG 1.183, Table 6 and 10CFR50.67:
17
TEDE Dose Acceptance Criteria PIS case:
EAB (worst two hour dose) 0.987 25 Rem TEDE LPZ (duration) 0.213 25 Rem TEDE Main Control Room 4.85 5 Rem TEDE GIS case:
EAB (worst two hour dose) 0.435 2.5 Rem TEDE LPZ (duration) 0.088 2.5 Rem TEDE Main Control Room 2.56 5 Rem TEDE Thus, the radiological consequences for SGTR are < 25 Rem TEDE for the EAB and LPZ doses and < 5 Rem TEDE for the MCR for the PIS case. Radiological consequences are < 2.5 Rem TEDE for EAB and LPZ doses for the GIS case. These are based on a 540 gpd primary-to-secondary leak rate for the unaffected SG and maximum control room unfiltered in-leakage of 100 CFM.
Activity releases for the SGTR are as follows:
Noble Gas Release DEI-131 Release (Table 1-4 isotopic distribution) 2 hr EAB (Ci) 8 hr LPZ (Ci) 2 hr EAB (Ci) 8 hrLPZ (Ci)
PIS 133.22 183.31 28,516 69925.5 GIS 7.24 51.31 28,516 69925.5 The portion of the 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> releases through the condenser prior to the ADVs opening are 64.94 Ci for the PIS Iodine release, 1.81 Ci for the GIS Iodine release, and 3559 Ci Noble Gas.
18
TABLE 5-1 ASSUMPTIONS USED FOR SGTR.RADIOLOGICAL ANALYSIS Core Power Level: 3735 MWt RCS Noble Gas Activity: See Table 1-4 of Reference 1 Core Inventory: See Table 1-1 of Reference I RCS Initial Activity: 1100/E ItC i/gm Pre-existing Iodine Spike (PIS): 60 pCi/gm DEI-131 Accident Generated Iodine Spike (GIS): 1.0 ILCi/gm DEI-131 Iodine Spiking Factor: 335 Secondary Coolant Initial Activity: 0.1 glCi/gmDEI-131 Fraction of Fuel Rods in Core Failing: 0%
Iodine Chemical Form:
Organic 3%
Particulate 0%
Primary-to-Secondary Leak Rate (unaffected SG): 540 gpd Steaming PF: 100 Steam Releases:
Affected SG; time of reactor trip to isolation (1980 sec) 139,000 Ibm Affected SQ time of reactor trip to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 245,600 Ibm Intact SQ time of reactor trip to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 351,400 Ibm Intact SQ time of reactor trip to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 910,100 Ibm Duration of Release: 8.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Control Room Parameters See Table 1-2 of Reference 1 Main Control Room y/Q assumed: See Section 5.1.5 Pressurization Flow: 225 CFM (maximum) 0 CFM (minimum, 0-8 hours)
Unfiltered In-leakage 100 CFM 19