Text
~ entergy John Ferrick Site Vice President Waterford Steam Electric Station, Unit 3 504-739-6660 W3F1-2023-0013 February 15, 2023 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
References:
Notification of Readiness for Supplemental Inspection Waterford Steam Electric Station, Unit 3 NRC Docket No. 50-382 Renewed Facility Operating License No. NPF-38
- 1) EA-22-033: Waterford Steam Electric Station, Unit 3 - Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000382/2022090, (ADAMS Accession No. ML22241A143), dated September 12, 2022
- 2) EA-22-119: Waterford Steam Electric Station, Unit 3 - Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000382/2023090, (ADAMS Accession No. ML23025A384), dated February 1, 2023 By letter dated September 12, 2022, the Nuclear Regulatory Commission (NRC) determined the performance at Waterford Steam Electric Station (Waterford 3) was within the Regulatory Response column of the NRC's Action Matrix (Reference 1 ). In a subsequent letter dated February 1, 2023, the NRC determined that Waterford 3 continues to be in the Regulatory Response column of the NRC's Action Matrix (Reference 2).
In both letters, the NRC announced its intent to conduct a supplemental inspection in accordance with Inspection Procedure 95001 following Waterford 3's notification of readiness.
This letter serves as the notification of Waterford 3's readiness for the NRC to perform the supplemental inspection for both of these issues.
This letter contains no new commitments. Should you have any questions concerning this issue, please contact Leia Milster, Manager, Regulatory Assurance, at 504-739-6250.